Forwards Insp Repts 50-254/98-05 & 50-265/98-05 on 980216- 0326 & Notice of Violation.Use of Emergency & Immediate Mods as Well as Use of at-risk Work Activities Were Reviewed
ML20217G183
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 04/23/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
Shared Package
ML20217G186 List:
References
50-254-98-05, 50-254-98-5, 50-265-98-05, 50-265-98-5, NUDOCS 9804290079
Download: ML20217G183 (3)


See also: IR 05000254/1998005

Text

. DcD}Dc4

.

.

April 23,1998

Mr. Oliver D. Kingsley

President, Nuclear Generation Group

Commonwealth Edison Company

ATTN: Regulatory Services

Executive Towers West lli

1400 Opus Place, Suite 500

Downers Grove, IL 60515

SUBJECT: NOTICE OF VIOLATION AND NRC INSPECTION REPORT

NO. 50-254/98005(DRS); 50-265/98005(DRS)

Dear Mr. Kingsley:

This refers to the inspection conducted February 16,1998 through March 26,1998, at the Quad

Cities Nuclear Power Station. The purpose of the inspection was to review design modification

process activities in use at the station. Specifically, the use of emergency and immediate

modifications as well as use of at-risk work activities were reviewed. At the conclusion of the

inspection, the findings were discussed with those members of your staff identified in the

enclosed report.

The inspection concluded that development of emergency and immediate modifications was

allowed by the Quad Cities OA Program, and corporate, and station procedures and was

adequately controlled. With regards to at-risk work packages, satisfactory controls were in

place to ensure that affected components would not be declared operable until completion of all

design documentation. Use of these types of modifications and work packages was not

common and, when used, adequate programmatic controls existed, with one exception noted

below, to ensure minimum prerequisites, limitations, and operational restrictions were included.

Notwithstanding the overall adequacy of the processes and controls, the NRC noted that when

the at-risk work option was introduced in 1996, all applicable design modification procedures

were not revised. Specifically, QCAP 0460-01," Plant Design Changes Process," continued to

require that installers use approved design change packages prior to work package /

'

preparation. Detailed reviews of at-risk work packages revealed an example of a work package

that was prepared contrary to the procedural requirements of QCAP 0460-01 and was

considered a violation of NRC requirements. The violation is cited in the enclosed Notice of l

Violation (Notice) and was of concern because it highlighted an inadequate review of

procedures when implementing an important change to the design modification process.

You are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response. The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

9804290079 990423

PDR ADOCK 05000254 {

G PDR i

4/ 0\ l

.

.e

.

.

O. Kingsley 2

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosures, and your response will be placed in the NRC Public Document Room.

l Sincerely,

!

'

John A. Grobe, Director

Division of Reactor Safety

'

Docket Nos: 50-254;50-265

License Nos: DPR-29; DPR-30

I l

Enclosures: 1. Notice of Violation

2. _ inspection Report No.

50-254/98005(DRS);

50-265/98005(DRS)

cc w/ encl: M. Wallace, Senior Vice President

,

D. Helwig, Senior Vice President

G. Stanley, PWR Vice President

J. Perry, BWR Vice President

D. Farrar, Regulatory

Services Manager

I. Johnson, Licensing Director

DCD - Licensing

D. Sager, Site Vice President

W. Pearce, Quad Cities Station Manager

C. C. Peterson, Regulatory Affairs

Manager

Richard Hubbard

l Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce  ;

'

Commission

W. D. Leech, Manager of Nuclear

MidAmerican Energy Company

i

DOCUMENT NAME: G:DRS\QUA98005.DRS

To receive a co py of this document. Indicate in the box "C" = Copy w/o attach /end "E" = Copy w/ attach /end *N' = No copy

OFFICE Rill:DRS /v Rlll:DRS lM Rlli:DRP /J Rlll:DR_SN l

NAME Guzman/lc ft Jacobson pd/,,. Ring # Grobe(f '

DATE 4/20/98 4/2t /98 # 4he /98 4/17/98)

OFFICIAL RECORD COPY

L

.

D.

.

.

O. Kingsley 3

Distribution:

SAR (E-Mail)

J. Lieberman, OE, w/enci

J. Goldberg, OGC w/enci

B. Boger, NRR w/enci

Project Mgr., NRR w/enct

A. Beach, w/ enc!

J. Caldwell, w/ encl .

B. Clayton, w/enci i

J. Heller, w/enct

SRI Quad Cities w/enci

DRP w/enci

TSS w/ enc!

DRS (2) w/ encl

Rlli PRR w/enct

PUBLIC IE-01 w/enci

Docket File w/enci

GREENS

LEO (E-Mail)

DOCDESK (E-Mail)

l

l

1