i
() -
HA TJJssA A [Ae Jy s ols A EEswa,oawTenu,su.eam9
~~~~- -
July 31, 1997 U.S. Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 Gentlemen:
In the Matter of
)
Docket No. 50-327 Tennessee Valley Authority )
SEQUOYAH NUCLEAR PLANT (SON) - UNIT 1 CYCLE 8 (U1C8) 90-DAY IN-SERVICE INSPECTION (ISI)
SUMMARY
REPORT Enclosed is SON's UIC8 ISI Summary Report that contains an historical record of repairs, replacements, and ISI examinations and augmented examinations that were performed on American Society of Mechanical Engineers (ASME) Code Class 1 and 2 components from November 11, 1995 to May 12,
[
1997.
I 1
Please note that this ISI Summary Report is being provided in accordance with IWA-6220 and IWA-6230 of ASME Code,Section XI.
fh(
H-000110 9708070097 970731 PDR ADOCK 05000327 flillhlhfllllllfll ))lll G
PDR 7
l U.S. Nuclear Pegulatory Commission l
Page-2 j
Jul 31, 1997 l-e
- Please direct questions concerning this issue to Me a (423) 843-7170 or J. D. Smith at (423) 843 6672.
""'" Ped'ro~Salas
-Site Licensing and Inaustry Affairs Manager
- Enclosure
=
cc Mr. R. W. Hernan,. Project Managor Nuclear Regulatory Commission One White Flint, North 11555-Rockville Pike Reckville, Maryland 20852-2739 NRC Resident : Inspector Sequoyah Nucl6ar Plant
-2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II Atlanta' Federal Reserve Center 61 Forsyth St., SW,-Suite 23T85-Atlanta, Georgia 30303-3415 4