Forwards Criteria Documents for Listed Areas Which Contain Proposed Sample Selection Criteria,Per Confirmatory Order Establishing Independent Corrective Action Verification Program
ML20217G115
Person / Time
Site: Millstone 
Issue date: 08/04/1997
From: Schopfer D
SARGENT & LUNDY, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
9583-100, NUDOCS 9708070096
Download: ML20217G115 (6)


Text

'

/

(A x;ih Beer gents Ej Luncty '"

/

DenK.Schopin s$$?$$N August 4,1997 Project No. 9583 100 4-DocW No. 50-423 Northeast Nuclear Energy Company f'i Millstone Nuclear Power Station Unit 3 Independent Corrective Action Verification Program l-United States Nuclear Regulatory Commission Attention: Document Control Desk-Washington, D. C. 20555 g

The Confirmatory Order establishing the Independent Corrective Action Verification Prograin for Millstone Units 1, 2, and 3, dated August 14, 1996, and the associated Commission Paper (SECY 97-003) released January 30, 1997, require that the review in: hide a sample of changes made to the facility configuration since issuance of the operuting licens3 through processes other than the design change processes. In order to establish a criteria for selecting these samples, it was mutually agreed that a listing of facility changes in each area of review would first be obtained from NU. In our letter dated July 22,- 1997, we provided sample selection criteria for the first four review areas.

Change lists have been provided to S&L for the following four additional areas:

1; Commercial Grade Dedication

2. Like-for Like Replacemants.

I 3, NCRr&WRs Dispositioned Use-As Is 1

4. Setpoint Changes

.i As discussed ln our nweting of July 17,1997, we have enclosed criteria documents which -

contain our proposed sample selection criteria for these areasc Please provide your

[.

comments or concurrence for these criteria at your earliest convenience.

9709070096 970804 PD"R ADOCK 05000423 PDR

[lll ll ll llllllllllll 060124 55 East Montoe Street

  • Chicago. IL 60003 5780 USA
  • 312-269-2000

United States Nuclear Regulatory Commission August 4,1997 Document Control Desk Page 2 We are awaiting clarification of change lists provided by NU for the following pas' hange areas:

Temporary alterations

+

e Vendor manuals Shortly aller we receive this information ftom NU, we will prepare and transmit similar recommendations for these final sample selections.

Please direct any questions to me at 312 269-6078.

Yours very truly, i

%[/k

)

D. K. Schopfer Vice President and ICAVP Manager DKS:TJR:pah Copies:

E. Imbro (1/4) Deputy Director, ICAVP Oversight T. Concannon (1/2) Nuclear Energy Advisory Council J. Fourgere (1/3) NU B. A. Erler (1/0)

File (M \\MP-ICAVPUmpCurr\\97NR0lt04 dx) s

d 3y-~...

Millstone 3 - ICAVP Programmatic. Review - Past Change Review Selection Crl(eria Commercial Grade Dedication e Millstone Status:

Commercial Grade Dedications-600 (1986 to 1997)

To establish the ICAVP sample, select:

1. Distribution of dedications from among various types, e.g., mechanical, electrical, IIVAC, computer software.
2. From printout of dedications sorted by year, two dedication packages per year (total 22).

(0:\\TJR\\NELAMISC0714. doc)

=

ff Millstone 3 ICAVP Programmatic Review - Past Change Review Selection Criteria Like-for-Like Replacements e Millstone Status:

Approximately 1,300 like for like replacements throughout the plant systems.

To establish the ICAVP sample, select:

e

1. Replacements outside the ICAVP sample systems.
2. Replacements from safety significant and/or risk significant systems.
3. Ten replacements from each five year interval of plant operation (total 20).

(G:\\TJR\\NEU\\ MISC 0714. doc)

n.k.

(

.Y i

Millstone 3 ICAVP l

Programmatic Review - Past Change Review Selection Criteria NCRs/EWRs Dispositioned Use-As-Is e Millstone Status:

Approximately 1,480 NCRs throughout the plant systems listed with use-as is disposition (1985 to 1996).

To establish the ICAVP sample, select:

e

1. NCRs from safety / risk significant systems outside the ICAVP sample systems including r.on-system related NCRs
2. NCRs relating to Section XI requirements (if noted in NCR description).
3. NCRs that would appear to involve an EWR to perform an engineering assessment.
4. Ten NCRs from each five-year interval of plant operation (total 20).

(G:\\TJR\\NEU\\ MISC 0714. doc)

=

(k Millstone 3 ICAVP Programmatic Review Past Change Review Selection Criteria Setpoint Changes e Millstone Status:

Master setpoint list includes approximately 3,000 setpoints.

To establish the ICAVP sample, select:

1. Setpoints in systems that are safety / risk significant outside the ICAVP sample.
2. Setpoints for equipment typically located in harsh EQ zones.
3. Ten setpoint changes from each five-year interval of plant operatiou (total 20).

(OATJR\\NEIAMISC0714. doc)

_ _ _ _ _ _ _