ML20217F972

From kanterella
Jump to navigation Jump to search
Forwards One Signed Original & Ten Copies of Rev 7 to VEGP Ufsar.Rev 7 Reflects Selected Changes Through 970831
ML20217F972
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/19/1997
From: Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217F976 List:
References
LCV-1066-D, NUDOCS 9710090120
Download: ML20217F972 (2)


Text

.

,C. K. McCoy.

Southern Nuclear Vice President Operating Company. Inc.

Vogtle Project 40 inverness Center Parkway P0. Box 1295 g-Birmingharn. Alabama 35201 Tel 205 9921122 Fax 205992S403 k

SOUTHERN h COkiPANY

\\

(

Energy to Serve hurWorld" September 19,1997 LCV 1066-D Docket Nos.

50-424

/3 50-425 1

(

)

i v

U. S. Nuclear Regulatory Commission ATrN: Document Control Desk Washington, D. C. 20555 VOGTLE ELECTRIC GENERATING PLANT UPDATED FINAL SAFETY ANALYSIS REPORT Gentlemen:

4 In accordance with 10 CFR 50.4 (b)(6) and 10 CFR 50.71 (c), Southern Nuclear Operating 1],

Company (SNC) hereby submits one signed original and ten copies of Revision 7 to the Vogtle Electric Generating Plan (VEGP) Updated Final Safety Analysis Report (UFSAR).

This submittal is provided on a replacement page basis and is accompanied by an effective page list that identifies the current pages of the UFSAR, (1

i SNC has elected to make this interim Revisioa 7 to reflect selected changes through August 31,1996 including:

Reflecting the March 22,'1997 transfer of the operating licensee to SNC.

incorporation of the resolution ofissues resulting from the JFSAR Verification Effort e

in response to NRC IN 96-17. Issues identified in the UFSAR Verification Effort which are subject to further review, will be included in future a UFSAR revision following their resolution.

O incorporation of other selected revisions, which are not the result of changes made to the e

()

VEGP facility, approved under the provisions of 10 CFR 50.59 from November 13, 1996 to August 31,1997. Changes made to the VEGP facility under the provisions of 10 CFR 50.59 which were implemented from November 13,1996 to August 31,1997 will be submitted in the next regular revision cycle.

()lq ew J

(

)-

In accordance with 10 CFR 50.71(c)(4) and prior NRC concurrence established with the y

submittal of Revision 4 in April,1994, the regular UFSAR revision for VEGP will be filed f

approximately every 18 months, within six months following completion of each VEGP Unit 2 refueling outage. The next Unit 2 refueling outage completion is presently scheduled for the Spring of 1998 and both Units remain on nominal 18 month refueling cycles.

i U

c..,..

n

:3 lilEIEllilllllllllllll!Ill k

9710090120 970919 PDR ADOCK 05000424

4 4

O I

(

U. S. Nuclear Regulatory Commission

. September 19,1997 Page 2 i

i 1

J-t Mr. C. P.. McCoy states that he is a vice president of SNC and is authorized to execute this

\\

cath on behalf of SNC and that, to the best of his knowledge and belief, for those chnges identified above, the information contained in the enclosed interim Revision 7 accurately presents changes made since the previous submittal and other selected changes, necessary to e

reflect information and analysis submitted to the Commission or prepared pursuant to Commission requirements.

)

SOUTilERN NUCLEAR OPERATING COMPANY By'.

- C. K. McCoy.

I fore me this / h day of(

4 1997, f

Sworn to and subscribed

/

t f-i i:

fa3MM KM/JLL I

Enclosure:

Updated FSAR, Revision 7 xc:

Southern Neclear Onerating Comoany

. Mr. J. B. Beasley, Jr.

3, Mr. M. Sheibani i ~

NORMS U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regiona! Administrator Mr. L. L Wheeler, Senior Project Manager, NRR Senior Resident Inspector, Vogtle 1.

b

]

i I-

~ ^ ' ^ ~

,