O Bostor Edisarr Pilgrim Nuclear Power Station Rocky Hill Road Plymouth, Massachusetts 02360 i
March 24,1998 BECo Ltr. # 2.98.015 LJ. Olivier i
Vice President Nuclear and Station Director l
U.S. Nuclear Regulatory Commission l
ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-293 License No. DPR-35 l
l Reschedulina of All-Rods-In Modification implementation l
Background
j By letter dated April 17,1997, (BECo letter 2.97.044), we replied to notice of violation 97-01-02 by committing to implement a design change to permanently resolve the "all-rods-in" issue by the end of the first quarter of 1998, unless the modification could not be installed on-line.
i Reason for Chanae l
During development of the originally proposed modification, a preferable, less system-intrusive modification evolved as a result of analyzing December 1997 scram data. This modification will result in timely "all-rods-in" information being I
available to the control room.
New Schedule implementing the new modification requires rescheduling completion from the first quarter of 1998 to August 31,1998. Should you require further information on this issue, please contact P.M. Kahler at (508) 830-7939.
s J. Olivier t
L Qo PMK/deg 298015
)
..a 9804010286 980324 l
PDR ADOCK 0500029 G
PDR~
l
o,,, s, Mr. Alan B. Wang, Project Manager i
l Project Directorate 1-3 Office Of Nuclear Reactor Regulation Mall Stop: OWFN 14B2 l
1 White Flint North l
11555 Rockville Pike Rockville, MD 20852 l
U.S. Nuclear Regulatory Commission Region 1 475 Allendale Road King of Prussia, PA 19406 Senior Resident inspector Pilgrim Nuclear Power Station I
-)