Discusses 980417 Telcon Between P Bissett & R Parnell Re Arrangements for Administration of Licensing Exam at Plant During Wk of 980824.Requested Proposed Exam Outlines Should Be Furnished by 980604 in Order to Meet Schedule
ML20217F351
Person / Time
Site: Crane Constellation icon.png
Issue date: 04/22/1998
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Langenbach J
GENERAL PUBLIC UTILITIES CORP.
References
NUDOCS 9804280137
Download: ML20217F351 (3)


Text

__

April 22, 1998

,N Mr. J. Langenbach Vice President and Director Three Mile Island GPU Nuclear, Inc.

Route 441 South P. O. Box 480 Middletown, PA 17057-048}

SUBJECT:

SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS - TMI

Dear Mr. Langenbach:

In a telephone conversation on April 17,1998, between Mr. P. Bissett and Mr.

Robert Parnell, arrangements were made for the administration of licensing examinations at Three Mile Island Unit 1 during the week of August 24,1998.

Your staff will prepare the proposed examinations in accordance with the guidelines in Revision 8, of NUREG-1021," Operator Licensing Examination Staridards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

To meet the above schedule, it will be necessary for your staff to furnish the proposed examination cutlines by June 14,1998. The written examination and operating tests will be due by July 14,1998. Any delay in receiving the required examination or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examination and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original. simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix ti of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090)at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first O

examination date.

N 9804280137 900422

,(r PDR ADOCK 05000289 V

PDR

L i

(

' Mr. J. L'angenbach 2

This letter contains informatica collections that are subject to the Paperwork Reduction Act

> of 1995 (44 U.S.C.' 3501 et seq.). These information collections were approved by the i

Office of Management and Budget, approval number 3150-0101,which expires on April 30, 2000.

. The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the colection of information.

Send comments on any aspect of this collection of information, including suggestions for l

reducing the burden, to the Information and Records Management Branch (T-6 F33),

U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001,or by Internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202,(3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. Mr. Parnell has been advised of the policies and guidelines referenced in this letter, if you have any questions regarding this inspection, please contact me at (610) 337-5183.

i l

Sincerely, 1

1 i

Richard J. Conte, Chief I

Operator Licensing and j

Human Performance Branch I

l Division of Reactor Safety Docket No.

50-289 L

)

cc:

J. C. Fornicola, Director, Nuclear Safety Assessment M. J. Ross, Director, Operations and Maintenance D. Smith, PDMS Manager J. Wetmore, Manager, TMl Nuclear Safety and Licensing R. Hess, Manager - Plant Training l.

TMI-Alert (TMIA)

E. L. Blake, Shaw, Pittman, Potts and Trowbridge (Legal Counsel for GPUN)

Commonwealth of Pennsylvania

d

/

Mr. J. Langenbach 3

Distribution:

Region i Docket Room (with concurrences)

PUBLIC Nuclear Safety Information Center (NSIC)

NRC Resident inspector J. Yerokun, DRS P. Bissett, DRS M. Evans, DRP N. Perry, DRP D. Haverkamp, DRP A. Linde, DRP A. Chaffee, NRR/ DORS /EAB DOCDESK Inspection Program Branch, NRR (IPAS)

OL Eacility File ORS Pil e i

DOCUMENT NAME: A: SROEXAM.TMI To receive a copy of this document. Indicate la the bos:

'C" = Copy without attachment / enclosure

  • E' = Copy with attachment / enclosure

'N" = No copy i

OFFICE Rl/DRS 3g]

Rl/DRS g/l Rl/

l Rl/

l Rl/

l NAME PBissett cff V RConte//"

l DATE 04/2)0/98 04/jA(8 04/ /98 04/ /98 04/- /98

$/