. - _ _ -

..pARCONO Daniel L Curry, W e bewdent Nadw be.'u a Port,gns r%er Group Inc 2676 Mo'Dantom Road

  • Remhng Penns ivania 19607 + (610) h% P366 e f as (610) 8% No?

v October 3,1997 Docket No. 50 336 Parsons NUM2 PPNR-0640 L U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Millstone Nuclear Power Station Unit No. 2 ladtpsadgni Corrective Action VeriRgatientegram (ICAVP)

Gentlemen:

Attached please fmd Revision 3 of Project Procedure PP-01," System Venical Slice Review". This document is being reissued in its entirety. These revisions incorporate PI-01 and sampic plan references.

Sincerely, an et.

Daniel L. Curry Parsons ICAVP Project Di ector DLC:cyb Attachments:

cc:

E. Imbro (2)- USNRC g

O\\

11.Eichenholz USNRC I(9 R. Laudenat NNECo J. Fougere - NNECo 1

Rep. Terry Concannon - NEAC

\\

t 9710000126 971003 PDR ADOCK 05000336 P