ML20217F328

From kanterella
Jump to navigation Jump to search
Transmits Summaries of Telcons Between Parsons Power Group Inc,Nrc,Nneco & Neac on 970925 Re Plant Usage Factors, Technical Requirements Manual & Commercial Grade Dedication Test Data
ML20217F328
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/02/1997
From: Curry D
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUM2-PPNR-0633, NUM2-PPNR-633, NUDOCS 9710080119
Download: ML20217F328 (3)


Text

IPARCONU Donlel L. Curry, yk e Presvet. Nxkw ser<ces Parsons Power Group inc P675 Morgantown Road

  • Fax (610) 855-?602 October 2,1997 Docket No. 50-336 Parsons NUM2-PPNR-0633-L U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Millstone Nuclear Power Station Unit No. 2 Indeoendent Corrective Action Verification Program (ICAVP)

Gentlemen:

This letter transmits sununaries of telephone conferences between Parsons Power Group Inc., the U. S.

Nuclear Regulatory Commission, NNECo and NEAC on September 25,1997. The purpose of this telephone conference was as follows: Plant Usage Factors, Technical Requirements Manual, and Conunercial Grade Dedication Test Data.

Please call me at (610) 855-2366 if you have any questions.

Sincerely, 9

Arcs Daniel L. Curry Parsons ICAVP Project Director DLC:djv Attachments 1.

Telephone Conference Notes from September 25,1997 cc:

E. Imbro (2)- USNRC

\\

H. Eichenholz - USNRC R. Laudenat - NMECo hgO J. Fougere - NNEC3

('

1 Rep. Terry Concannon - NEAC Project Files 9710090119 971002

  • k PDR ADOCK 05000336

\\

P

PDR, P@'UO633. doc gglgllljgllllll llll

}

j

ADMINISTRATIVE CONFFRENCE NOTES SEFFEMBER 25,1997 PURPOSE:

Administrative telephone conference with NNECo, NRC, NE AC and Parsons to discuss:

Plant Usage Factors Technical Requirements Maaual Commercial Grade Dedication Test Data e

Date:

September 25,1997 List of Attendees:

l NNECo NRC NEAC Parsons Joe Fougere Manager, ICAVP John Wayne Dobson Nakeski Fred Mattioli Supenisor, MP2 iCAVP Eric Blocher Richard Laudenat Director, ICAVP Mike Akins Prem Godha Sr. Engineer, Materials Dan Curry Bob Borchert Supenisor, Reactor Eng.

John Hilbish Mark Surprenant Supenisor, Procurement Greg Cranston Eng.

Plant Usage Factors WHAT DOCUMENT / PROCEDURE CONTROLS KEEPING TRACK OF UNIT 2 PLANT USAGE FACTORS? (NOTE: FOR UNIT 3 IT APPEARS THAT EN-31062," PLANT USAGE FACTORS"IS THE CONTROLLING PROCEDURE.

ATTACHMENT 1 TO THIS PROCEDURE LISTS USAGE FACTOR LIMITS.)

Discussion

1. The plant usage fact:-= are currentiy controlled by standard specification ME-946. The last update was in Aug.1993. The next update is planned for 1998. The Nuclear Materials group is currently responsible for collecting information on plant usage factors.

2.

The CMP resulted in a UIR and ACR on thi; topic. The current program does not monitor all of the cycle = that it should. (ACR 97-0841) One of the corrective actions (AR 97012464) will result in a procedure for Unit 2 similar to what Unit 3 has.

PPNUO633. doc Page1 i

s

d ADMINISTRATIVE CONFERENCE NOTES 1

SEITEMBER 25,1997 Technical Requirements Manual WE liAVE SEEN REFERENCE TO A TECHNICAL REQUIREMENTS MANUAL, (TRM) IN Tile CONTEXT OF DOCUMENTS TilAT MAY 4

CONTAIN LICENSING AND DESIGN BASIS INFORMATION SUCH AS FSAR, DBDP, TECH SPEC. CALCULATIONS, EVALUATIONS, ETC., WilViIS THE TRM? IS IT APPLICABLE TO MILLSTONE UNIT 2?

Discussion

1. The TRM is approximately 3 years old. It is consists of two parts: Section 1 is NNECo clarifications of technical specifications requirements. Section 2 contains the requirements that have been removed from the technical specifications. For example, Appendix R, Fire Protection, Instrument response times, etc.
2. Typically the TRM is keep with the technical specifications. NOTE:

Following the conference, Parsons confirmed that they have a copy of the L

TRM. It was with the technical specifications supplied by NNECo as part of initial generic documents.

)_

Commercial Grade Dedication Test Data

)

HOW DOES MILLSTONE UNIT 2 DOCUMENT TilEIR RECEIPT INSPECTION TEST DATA? THE MATERIAL RECEIPT INSPECTION REPORTS,(MRIR)

THAT WE HAVE SEEN DO NOT INCLUDE ANY DATA. IS ANOTHER FORM UTILIZED?

s.

Discussion

1. The Millstone program has never required the actual test data to be documented,it is a past/ fail chtck. The material test analyze gives a printout of the results and sometimes this is attached to the MRIR.

2.

FOLLOW-UP QUESTION: The list of Commercial Grade Dedicuion packages provided in response to RAI 106 eppears to contain three item for 1995 and nothing for 19% and 1997. Has Millstone done any dedication evaluations in the last two years?

Yes. NNECo will check the list provided e

Since November 1996 all of the commercial grade evaluations have been done in MIMS which is part of PASSPORT. Possibly the list provided in response to RAI 106 did not include the MIMS data.

PPNUO633. doc Page 2