ML20217F070
| ML20217F070 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 04/22/1998 |
| From: | Salas P TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20217F075 | List: |
| References | |
| NUDOCS 9804280048 | |
| Download: ML20217F070 (2) | |
Text
1 nn Tennessee Vaney Authority, Post Offee Box 2000, Soddy-Daisy, Tennessee 37379-2000 l
April 22, 1998 U.S.
Nuclear Regulatory Commission ATTN:
Document Control Desk Washington, D.C.
20555 i
Gentlemen:
In the Matter of
)
Docket Nos. 50-327 Tennessee Valley Authority
)
50-328 SEQUOYAH NUCLEAR PLANT (SQN) - 1997 ANNUAL RADIOACTIVE EFFLUENT RELEASE REPORT (ARERR)
Enclosed is the ARERR for the period of January 1 to December 31, 1997.
This report is being submitted in accordance with SON Technical Specification (TS) 6.9.1.8. contains SQN's ARERR. provides the Radiological Impact Assessment Report for the period of January 1 to December 31, 1997.
There were no ODCM revisions during the 1997 reporting period.
e Please direct questions concerning this issue to me at (423) 843-7170 or Jim Smith at (423) 843-6672.
Sincerely,
'J g
Pe alas Licensing and Industry Affairs Manager OPS 4A-SON Enclosures
' 1'L cc:
See page 2 g(3
~
9804280048 980422 PDR ADOCK 05000327 R
~
l U.S.
Nuclear Regulatory Commission Page 2 April 22, 1998 cc (Enclosures):
Mr. R.
W.
Hernan, Project Manager Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S.
Nuclear Regulatory Commission Region II Atlanta Federal Center 61 Forsythe St.,
SW, Suite 23T85 Atlanta, Georgia 30323-2711 l
i
)
l