Forwards Insp Rept 50-237/97-16 on 970728-0801.No Violations Noted.Nrc Concluded That Operator Inadequate Evaluation of FWCS During Pump Start Was Root Cause of Transient
ML20217E464
Person / Time
Site: Dresden Constellation icon.png
Issue date: 10/02/1997
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jamila Perry
COMMONWEALTH EDISON CO.
Shared Package
ML20217E468 List:
References
50-237-97-16, NUDOCS 9710070038
Download: ML20217E464 (3)


See also: IR 05000237/1997016

Text

.'

,. i .

.

.

October 2, 1997

Mr. J. S. Perry

Site Vice President

Dresden Nuclear Power Station

Commonwealth Edison Company

6500 North Dresden Road

Morris,IL 60450

SUBJECT:

NRC INSPECTION REPORT 50 237/97016(DRS)

l

Dear Mr. Perry:

On August 1,1997, a specialinspection was completed at the Dresden Nuclear Station, Unit 2.

The purpose of the inspection was to assess information regarding the July 27,1997, reactor

vessellevel control problems and subsequent manual reactor trip. This report presents the

results of that inspection.

On July 28,1997, the Dresden Unit 2 control room operators were attempting to shift operating

reccior feedwater pumps. During the foodwater pump shift, the operator at the controls

erroneously determined that the feedwater control system (FWCS) was not functioning correctly

and took manual control of the FWCS. The operator's subsequent Inability to control the FWCS

caused the unit supervisor to direct a manual trip of the reactor. We concluded that the

operator's inadequate evaluation of the FWCS during the pump start was the root cause of the

transient. The material condition of the FWCS, operator training, and procedural weaknesses

,

contributed to the transient. We determined that the event's immediate safety consequence

was minimal as no operational safety limits were approached or exceeded.

We understand that you are planning to meet with us to discuss " lessons learned" from this

operational occurrence and the subsequent investigation conducted by the Dresden Nuclear

Station prompt investigation team.

\\

\\

9710070038 971002

PDR

ADOCK 05000237

G

PDR

gu

J

Le

,

.

6

.

J. S. Perry

2

October 2, 1997

in accordance with 10 CFR 2.790 of the NRC's * Rules of Practice," a copy of this letter, its

enclosure, and your response will be placed in the NRC 'ublic Document Room (PDR).

Sincerely,

origimi Signed Dy

John A. Grobe, Acting Director

i

Division of Reactor Safety

l

Docket No. 50 237

License No. DPR 19

i

!

Enclosures:

1. Inspection Report g7016(DRS)

'

2. Sequence of Events

cc w/encis:

R. J. Manning, Executive Vice President,

Generation

M. Wallace, Senior Vice President,

Corporate Services

E. Kraft, Vice President, BWR Operations

Liaison Officer, NOC-BOD

D. A. Sager, Vice President,

Generation Support

D. Farrar, Nuc, lear Regulatory -

Services Manager

1. Johnson, Licensing Operations Manager

Document Control Desk - Licensing -

T. Nauman, Station Manager, Unit 1

M. Heffley, Station Manager, Units 2 and 3

F. Spangenberg, Regulatory Assurance

Manager

Richard Hubbard

Nathan Schloss, Economist,

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce Commission

DOCUMENT NAME: G:DRS\\DRS97016.DRS

To receive a ce py of this document, Indicato in the box 'C's Copy w/o attach /end 'E's Co>y w/attacNond 'W = No copy

OFFICE

Rlli

A

Rlli

lu

Rlli

.

4

Rill

rM4Tl

NAME

DMcNellip P

MLeach MovA

RLerch (WV

JGrobe\\ 'l\\ V i c-

DATE

09/W97

pf/ /97

09/29/97

$9f V97

\\

t

OFFICIAL RECORD COPY

,--

I

.

l

J. S. Perry

3

October 2, 1997

I

Distribution:

!-

_ Docket File w/encle

SRI, Dresden w/encls

R. A. Capra, NRR w/encle

l

PUBLiC%2 w/encls

C. Pederson, Rill w/encle

TSS w/encls

OC/LFDCB w/encls

LPM, NRR w/encls

CAA1 w/encls

DRP w/encls

A. B. Beach, Rlll w/encls

DOCDESK w/encls

DRS w/encls

J. L Caldwell, Rlli w/encls

Rlli PRR w/encle

Rlli Enf. Coordinator w/encIs

f

.