Amend 88 to License NPF-58,revising Test Interval for Drywell Bypass Leakage Rate Test from 18 Months to 10 Years
ML20217D986
Person / Time
Site: Perry 
Issue date: 09/24/1997
From: Hopkins J
NRC (Affiliation Not Assigned)
To:
Shared Package
ML20217D989 List:
References
NUDOCS 9710060243
Download: ML20217D986 (9)


Text

i 7"""%

5

\\

UNITE] STATES y

s P;

NUCLEAR RE2ULATSRY G2MMl881EN r

wasniweton, o.c. smeewen

%..... /

THE CLEVELAND ELECTRIC ILLUMINATING COMPANY. ET AL.

DOCKET NO. 50 440 PERRY NUCLEAR POWER PLANT. UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 88 License No. NPF-58 1.

The U.S. Nuclear Regulatory Commission-(the Commission) has found that:

g A.

The application for amendment by The 'leveland Electric Illuminating Company. Centerior Service Company. Duquesne Light Com)any, Ohio Edison Company, OES Nuclear. Inc., Pennsylvania Power Company, and Toledo Edison Company (the licensees) dated January 16, 1996.

supplemented December 6, 1996, and August 15, 1997, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter 1:

B.

The facility will operate in conforn.ity with the application, the i

provisions of the Act. and the rules and regulations of the Comission:

C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations:

D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public: and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. NPF-58 is hereby amended to read as follows:

oN E8A $$$R 8?8o$ho cl'7 P

PDR j

e 2

l (2) Technical SDecifications The Technical Specifications contained in Appendix A and the i

Environmental Protection Plan contained in Appendix B. as revised through Amendment No. 88, are hereby incorporated into this license, The Cleveland Electric Illuminating Company shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

3.

This license amendment is effective as of its date of issuance and shall be implemented not later than 90 days after issuance.

FOR THE NUCLEAR REGULATORY COM SION 0.

on B. Hopkins. Seni r Project Manager ProjectDirectorateIII-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance:

September 24, 1997

ATTACHMENT TO LICENSE AMENDMENT NO. 88 FACILITY OPERATING LICENSE WO. NPF 58

\\

)

DOCKET NO. 50 440 i

Replace the following pages of the Appendix "A" Technical Specifications with the attached pages.

The revised pages are identified by Amendment number and contain vertical lines indicating the area of change.

Begmt Insert 3.6 60.

3,6 60 3.6 60a 3.6 61 3.6 61 3.6-63 3.6-63 3.6 64-3.6 64 l_

3.6 65 3.6 65 i

i i

i l

1-i, i

f.

4 e

)

i Drywell 3.6.5.1 j

i SURVEILLANCE REOUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.5.1.1 Verify bypass leakage is less than or 24 months equal to the bypass leakage limit.

following 2 However, during the first unit startup consecutive following bypass leakage testing tests with performed in accordance with this SR the bypass leakage acceptance criterion is s 10% of the greater than drywell bypass leakage limit.

the bypass leakage limit M

48 months folloting a test with bypass leakage greater than the bypass leakage limit M

...... NOTE-----

SR 3.0.2 extensions are limited to 12 months.

52bNtEs SR 3.6.5.1.2 Visually inspect the exposed accessible Three times interior and exterior surfaces of the during each 10-

drywell, year service period, at approximately equal intervals.

(continued)

PERRY - UNIT 1 3.6 60 Amendment No. 69,69,88

Drywell 3.6.5.1 l

SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY l

SR 3.6.5.1.3 Quantify air lock door seal leakage rate Once within 72 when the gap between the door seals is hours after pressurized to a 2.5 psig.

each drm11 air lock door l

closing.

SR 3.6.5.1.4

--- ----- -----.. NOTE-- -- ------------

An inoperable air lock door does not invalidate the previous successful performance of the overall air lock leakage test.

9 Quantify drywell air lock leaka by performing an air lock barrel 1 kage 24 months s -

test at = 2.5 psig.

a i

l I

i d

i PERRY - UNIT 1 3.6-60a Amendment No. 88 1

=

--e z

e-w e.=-

ii**-

y--

e w.

w rMw

=

ww r r w

y-

.-.w w.g y

w

Drywell Air Lock 3.6.5.2 t

3.6 CONTAINMENT SYSTEMS 3.6.5.2 Drywell Air Lock LC0 3.6.5.2 The drywell air lock shall be OPERABLE.

APPLICABILITY:

H0 DES 1, 2 and 3.

ACTIONS

..................................... NOTE--- --- --------------------- -- ----

Entry and exit is wissible to perform repairs of the affected air lock components.

CONDITION REQUIRED ACTION COMPLETION TIME A.

One drywell air lock NOTES------------

door inoperable.

1.

Re uired Actions A.1.

A.. and A.3 are not applicable if both doors in the air lock are inoperable and Condition C is entered.

2.

Entry and exit is permissible for 7 days under administrative controls.

A.1 Verify the OPERABLE 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> door is closed.

8ND (continued)

PERRY - UNIT 1 3.6-61 Amendment No. e,88

o Drpell Air Lock 3.6.5.2

' ACTIONS (continued)

CONDITION REQUIRED ACTION COMPLETION TIME C.

Drp ell air lock C.1 Verify a door is I hour inoperable for reasons closed.

Other than Condition A or B.

E C.2 Res' ir.? air lock to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> OPEh status.

D.

Required Action and D.1 Be in F0DE 3.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> associated Completion Time not met.

E 0.2 Be in MODE 4.

36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br /> I

f a

PERRY - UNIT 1 3.6-63 Amendment No.%88

- e

  • Wa see 4 + + +

we

.7

)

Drywell Air Lock 3.6.5.2 SURVEJLLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.6.5.2.1 Deleted.

SR 3.6.5.2.2 Verify drywell air lock seal air header 7 days pressure is a 60 psig.

SR 3.6.5.2.3


NOTE-------------------

Only required to be performed upon entry into drywell.

Verify only one door in the drywell air 24 months lock can be opened at a time.

SR 3.6.5.2.4 Deleted.

SR 3.6.5.2.5 Verify. from an initial pressure of 24 months 60 psig, the drywell air lock seal pneumatic system pressure does not decay at a rate equivalent to > 3 psig for a period of 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

PERRY - UNIT 1 3.6-64 Amendment No. +9,88

.~-

Drywell Isolation Valves 3.6,5.3 3.6 CONTAINMENT SYSTEMS

-3.6.5.3 Drywell Isolation Valves LCO 3.6.f.3 Each drywell isolation valve, exce)t for Drywell Vacuum Relief System valves, shall be OPE %8LE.

APPLICABILITY:

MODES 1, 2. and 3.

ACTIONS

...................................---NOTES------------------------------------

1.

Penetration flow paths, except for the 24 inch and 36 inch purge supply l-and exhaust valve penetration flow path, may be unisolated intermittently under administrative controls.

l 2.

Separate Condition entry is allowed for each penetration flow path.

l 3.

Enter a>plicable Conditions and Required Actions for systus made inoperaale by drywell isolation valves.

CONDITION REQUIRED ACTION COMPLETION TIME I

A.

One or more A.1 Isolate the affected 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> penetration flow paths

)enetration flow path with one drywell

)y use of at least isolation valve ene closed and de-inoperable.

activated automatic valve, closed manual valve, blind flange, or check valve with flow through the l

valve secured.

88D (continued)

PERRY - UNIT 1 3.6-65 Amendment No. 49,88

  • \\