ML20217D947

From kanterella
Jump to navigation Jump to search
Final Response to FOIA Request for Documents.Records Listed in App B Being Made Available in PDR & Encl
ML20217D947
Person / Time
Issue date: 10/08/1999
From: Reed C
NRC OFFICE OF ADMINISTRATION (ADM)
To: Scitz D
AFFILIATION NOT ASSIGNED
Shared Package
ML20217D954 List:
References
FOIA-99-314 NUDOCS 9910180186
Download: ML20217D947 (2)


Text

_.

HRC FORM 464 P_rt 6 U.S. NUCLEAR REGULATORY COMMISSION P UIAIPA RESPONSE NUMBER y hDh me9s)

[ "' %

99-341 2

RESPONSE TO FREEDOM OF f

lNFORMATION ACT(FOlA)/ PRIVACY S

RESPONSE

k* e s e */

ACT (PA) REQUEST TYPE y

AL RLOuESTER DAIE Douglas II. Scitz ET06 M PART l. -INFORMATION RELEASED l-] No additional agency records subject to the request have been located.

IR Requested records are available through another public distribution program. See Comments section.

L_ J

~

] [ APPENDICES ~~~l Agency records subject to the request that are identified in the listed appendices are already avadable for l

j public inspection and copying at the NRC Public Document Room.

IAPPENDICE

! Agency records subject to the request that are identified in the listed appendices are being made available for j public inspection and copying at the NRC Pubt;c Document Room.

- J R Enclosed is information on how you may obtain access to and the charges for copying records located at the NRC Public Document Room, 2120 L Street, NW, Washington, DC.

M Agency records subject to the request are enclosed.

'"]

Records subject to the request that contain information originated by or of interest to another Federal agency have been F

referred to that agency (see comments section) for a disclosure determination and direct response to you.

] We are continuing to process your request.

E See Comments.

L _J PART l.A - FEES l Q You will be billed by NRC for the amount !isted.

] None. Minimum fee threshold not met.

rAuocuy.

76.40 l You will receive a refund for the amount listed.

]- Fees waived.

q g-PART 1.B -INFORMATION NOT LOCATED OR WITHHELD FROM DISCLOSURE

] No agency records subject to the request have been located.

R Certain information in the requested records is being withheld from disclosure pursuant to the exemptions described in and for

'J the reasons stated in Part II.

El This determination may be appealed within 30 days by writirig to the FOIA/PA Officer, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. Clearly state on the envelope and in the letter that it is a "FOIA/PA Appeal."

PART l.C COMMENTS (Use attached Comments continuation page if required)

The actual fees for processing your request are:

I hour,10 minutes search

$21.00 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />,20 minutes review 42.00 67 pages duplication 13.40 TOTAL

$76.40 Ifk I l

SIGNAI RE - F RELDOM OF INFORMAIK)

'I AND P A 'Y ACT Of f K;LR eN Caro

'9910180186 991008 PDR FOIA SCITZ99-314 PDR NRC FORM 464 Part 1 (6-1998)

PRINTED ON RECYCLEo PAPER This form was designed using Informs

Re: FOIA-99-341 APPENDIX B RECORUS BEING RELEASED IN THEIR ENTIRETY (if copyrighted identify with *)

fiQ PATE DESCRIPTION /(PAGE COUNT) 1.

08/20/98 Inspection of the Exterior Marble / Granite at NRC, OWFN -

Breakdown of Consultant's, with handwritten notes. (5 pages) 2.

08/20/98 Handwritten note re proposed cost of OWFN Marble Facade. (1 page) 3.

08/18/98 Architect-Engineer Cost Estimate (11 pages) 4.

03/05/99 GSA Contract GS-11P-95-EGD-0016, GNM & Associates, Inc. B.2-4 Contract Man-Hour Rates -Option Year 2, as negotiated January 30,1996. (2 pages) l

- 419CN TEAM ID:2022600921 AUG 16'99 11:41 No.001 P 03 SCALDARA & POTLER, LLP ATTOR!MYS AT LAW BUITE 1200 ONE NORTH CHAR 1L7 STREET BALTDutORE, MARYLAN*u 21201 3710 TaLaFaletGL41646Me90 FACgDEIIJC 419452-5060 FOIA#MFEQUET August 11,1999 gg tjtg gg /

DagsRatt 8-M -Y Y M

A**

Douglas EL se*'s menwone:

-:::; :,t, Aw.ie=rrei. w -dei.nunn.rcia mse n=

Mr. Roy Thomas GeneralServicesM W*ation 7* and D Streets, S.W., Room 2021 Washington, D.C. 20407 Re:

U.S. Nuclear Regulatory Commission 1 White Plist North Marble Pacade "7 :-^' r.11555 Rockville Pike B shmasta, MD GSNNRC

._. A CentesctNo.: GS11P95EGD0016 Contractor: GNM & Associates,Inc.

Our Qient: Atlantic Construction Services,Inc.

Dear Mr. Thomas:

Our chant, Atlantic Construction Services, Inc., provided scaSbiding and manpower on the above-referenced project. It is my understanding that the general contractor, who is currently wia=, has been paid for the services rendered by our chant on in a Chapter 11 Bankruptcy proe this project. It is our intention, if the fhats warrant, to pursue a False Claims Act case agains prindpals of the general contractor. To that end, please provide us with n!!information pertaining to this project, inchading any certiGcations by the general contractor regarding payment to subcontractors and any information regarding payments made or due to the gene contractor.

This inibennation.is regnested pursuant to the Freedom ofInformation Act, 5 U.S.C. g552 and the False Clainns Act,1R U.S.C. 6287.

I

. Wj ju$Ull 5 f

=W9CN TEAM ID:2022600921 AUG 16'99 11:42 No.001 P.04

' Roy Thomas

+

August 11,1999 Page 2 Please contact the undersigned regarding when these documents could be mad'e available for inspection and copying. If this request needs to be made to another person or departmmt, please so advise.

Vay tmly rs, 1

g Dou as. Scitz i

DHBMi ec:

Jim Vrettakes S305?n h onesW03.padesJermy1 bemas 0811M.#

I