Advises That MISC-PENG-CAL-059,Rev 00;drawing E-2007085-908-008,Rev 3 & Drawing E-2007085-908-010,Rev 4 Submitted W/Peco Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5)
ML20217D900
Person / Time
Site: Peach Bottom  
Issue date: 09/25/1997
From: Padovan L
NRC (Affiliation Not Assigned)
To: Rickard I
ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY
References
IEB-96-003, IEB-96-3, NUDOCS 9710060205
Download: ML20217D900 (4)


Text

_ _ - _ - - - _ _ - _ - _ - - - - - - - - -

'f UNITED STATES

3

]

NUCLEAR REGULATORY COMMISSION j

,/

September 25.-1997 e

waswiwarow, o.c. nosewooi Mr. Ian C. Rickard, Director Operations Licensing ABB Combustion Engineering Nuclear Operations Combustion Engineering, Inc.

P.O. Bnx S00 2000 Day Hill Road Windsor, CT 06095-0500

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE, PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3

Dear Mr. Rickard:

In PECO Energy Company's (PECO) August 22, 1997, application and your affidavit dated August 22, 1997, the following documents were submitted and requested that they be withheld from public disclosure pursuant to 10 CFR 2.790:

MISC-PENG-CALC-059, Rev. 00, "Model for Sizing and Evaluating Performance of BWR Replacement Strainers with Pleated Surfaces," July 1997 Drawing E-2007085-908-008, Rev. 03, " Peach Bottom Units 2&3 RHR Strainer Module," t.ugust 1997 Drawing E-2007085-908-010, Rev. 04, " Peach Bottom Units 2&3 CS Strainer Modules and General Arrangement," August 1997 The following additional documents were submitted as nonproprietary:

Response to Request foe. additional Information Concerning NRC Bulletin 96-03, " Potential Plugging of Emergency Core Cooling Suction Strainers by Debris In Boiling Water Reactors" General Plant Arrangement drawings depicting the replacement strainer locations You indicated that the submitted proprietary information should be considered exempt from mandatory public disclosure for the following reasons:

(g

1. The information consists of test data and methods for calculating Emergency Core Cooling System (ECCS) strainer size and design and fabrication details O

of ECCS strainers.

l

2. The information consists of test data or other similar data concerning a process, method or component, the application of which results in substantial competitive advantage to Combu tion Engineering.

.n a u 28 n 3 n38877 M E t9 UI C W i;?!? m M P

PDR ll ll lll llli,I,11ll

'. Rickard September 25, 1997 I

3. The information consists of test data and methods for calculating ECCS strainer size and design and fabrication details of ECCS strainers, the application of which provides a competitive economic advantage. The availability of such information to competitors would enable them to modify their product to better compete with Combustion Engineering, take marketing or other actions to improve their product's position or impair the position of Combustion Engineering's product, and avoid developing similar data and analyses in support of their processes. methods or apparatus.
4. Use of the information by competitors in the international marketplace would increase their ability to market-nuclear steam supply systems by reducing the costs associated with their technology development. In addition, disclosure would have an adverse economic impact on Combustion Engineering's potential for obtaining or maintaining foreign licensees.

We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.

Therefore, MISC-PENG-CAL-059, Rev. 00; Drawing E-2007085-908-008, Rev. 03; and Drawing E-2007085-908-010, Rev. 04 submitted with PECO Nuclear's August 22, 1997, letter to the NRC, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information froe public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC.

You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, c8 L.

Mark Padovan, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket Nos.

50-277 and 50-278 cc:

See next page

PECO Energy Company Peach Bottom Atomic Power Station, Units 2 and 3 CC:

i J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R. D. #1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN:

Regulatory Engineer, A4-SS Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA.17314 Baltimore, MD 21202-6806 Resident Inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Regional Administrator, Region I U.S Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston Street Manager-Business & Co-owner Affairs Baltimore, MD 21201 Public Service Electric and Gas Company A. F. Kirby, III P.O. Box 236 External Operations - Nuclear Hancocks Bridge, NJ 08038-0236 Delmarva Power & Light Company P.O. Box 231 Manager-Peach Bottom Licensing Wilmington, DE 19899 PECO Energy Company Nuclear Group Headquarters PECO Energy Company Correspondence Control Desk Plant Manager P.O. Box No. 195 Peach Bottom Atomic Power Station Wayne, PA 19087-0195 1848 Lay Road Delta, PA 17314 Mr. George A. Hunger, Jr.

Director-Licensing, MC 62A-1 PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P.O. Box No. 195 Wayne, PA 19087-0195

I.

Rickard

! 2 - ::

September 25, 1997

'3. The information consists of test data and methodr, for calculating ECCS-

-strainer size and design and fabrication details of ECCS strainers, the

application of which provides a competitive economic advantage. The availability of :uch information to competitors would enable them to modify their product to better compete with Combustion Engineering take marketing t

or other actions to improve.their-product's position or-impair the position of Combustion Engineering's product, and avoid developing similar data and analyses in support of their processes, methods or apparatus.

4._ Use of the information by competitors in the international marketplace would increase their ability to market nuclear steam supply systems by reducing the costs associated with their technology development. In addition, disclosure would have an adverse economic impact on Combustion Engineering's potential for obtaining or maintaining foreign licensees.

We have reviewed your application and the material in accordance with the requirements of 10 CFR I,790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial information.

Therefore, MISC-PENG-CAL-059, Rev. 00; Drawing E-2007085-908-008, Rev. 03; and Drawing E-2007085-908-010, Rev. 04 submitted with PECO Nuclear's August 22, 1997, letter to the NRC, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

Withholding from public inspection shall not affect the right, if any, of persons properly and directly concerned to inspect the documents.

If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information.

In all review situations, if the NRC makes a determination adverse to the above, you will.be notified in advance of any e

public disclosure.

(

Sincerely, L.

Mark Padovan, Project Manager Project Directorate I-2 Division of Reactor Projects - I/II Docket Nos. 50-277 and 50-278 DISTRIBUUgh M0'Brien f50etet FMegy' LPadovan cc:

See next page PUBLIC BBoger JStolz CBerlinger PDI-2 Reading MPSiemien, OGC (EMail MPS)

PSwetland, RGR-I 0FFICE PDI,2/ptl, P)01-2){)/) SCSB/B9((/)0GC Th MDI_2/D-

/

NAME LPa M n h'Brdn\\

CBerlihgeE M hlpmfid C 'JStolz DATE 9/ h /97 9/h/97 f/d/97 g 9 /$/97 g /2 5 /97 L

'AL RE:"3Y COPY

\\ DElulENT P ".E:-

'RO PRI. PB

.a

_