Northem States Power Company
+
- Monticello Nuclear Generating Plant 2807 West County Road 75 Monticello, MN 55362 April 15,1998 Technical Specifications 6.7.A.7 J
U S Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 MONTlCELLO NUCLEAR GENERATING PLANT Docket No. 50-263 License No. DPR-22 Submittal of the Core Operating Limits Report for Cycle 19 I
The Core Operating Limits Report (COLR) for Cycle 19, Rev 0, is enclosed. This report provides the l
values of the limits for Cycle 19 as required by Technical Specification Section 6.7.A.7. These values have been established using NRC approved rnethodology and such that all applicable limits of the plant safety analysis are met.
It is noted that this COLR incorporates changes given in a January 26,1998 notification letter from General Electric (Reference 1) with regard to the Safety Limit Minimum Critical Power Ratio (SLMCPR),
and as communicated to the NRC in our SLMCPR License Amendment Request of March 13,1998 j
(Reference 2) as supplemented March 25,1998 (Reference 3).
The COLR reflects a SLMCPR of 1.10 for two-loop operation, and 1.11 for single-loop operation for all fuel in Cycle 19.
The appropriate OLMCPR values in our core monitoring system will be changed prior to plant startup.
Please contact Sam Shirey at 612-295-1449 if you have any questions related to this submittal.
fl M
Michae.1 F. Hammer Plant Manager Monticello Nuclear Generating Plant
\\ \\
l 9804270119 980415 l
- \\ps
USNRC April 15,1998 Page 2 c: Regional Administrator-Ill, NRC NRR Project Mgr., NRC l
NRC Resident inspector MPCA l
Attn: Kris Sanda l
J Silberg l
Enclosure:
Core Operating Limits Report for Cycle 19 (Rev 0) j References 1
Letter from T. R. Brohaugh (GE Nuclear) to K. S. Schnoebelen (NSP), "Monticello Cycle 19 SLMCPR Calculation", January 26,1998.
2.
Letter from Michael F. Hammer (NSP) to US Nuclear Regulatory Commission, " License Amendmer,t Request for Monticello Cycle 19 Safety Limit Minimum Critical Power Ratio", March 13,1998 3.
Letter from Michael F. Hammer (NSP) to US Nuclear Regulatory Commission, " Supplement No.1 to License Amendment Request for Monticello Cycle 19 Safety Limit Minimum Critical Power Ratio",
March 25,1998.
(
l N1MI6 SIS JtlCENSEWRCCORRCOLR C19 R0