Text
o
d "i g
UMTE D ST ATES
s
f,
t
NUCLEAR REGULATORY COMMISSION
[ l'
h
REGION IV
'
611 R Y AN PLAZA ORIVE, SUIT E 400
,,
,
't .
.;
AR LINGTON, T E XAS 76011 8064
.....
March 25,1998
S. K. Gambhir, Division Manager
Engineering & Operations Support
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399
Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023-0399
SUBJECT: NRC INSPECTION REPORT 50-285/98-02 AND NOTICE OF VIOLATION
Dear Mr. Gambhir:
i
From February 9-13,1998, an inspection of the quality assurance program was conducted at
your Fort Calhoun Station reactor facility, Following the inspection, an exit meeting was held to
J
provide the inspection findings to you and other members of your staff. Your staff submitted
additional information on February 13,1998, prior to the exit meeting regarding the inspection
'
findings. Subsequently, in-office inspection was conducted until March 2,1998, and a
supplemental telephonic exit was held with your staff on that date. The enclosed report presents
the scope and results of that inspection.
During this inspection of your quality assurance program, two violations were identified. The fimt
violation was a failure to ensure that a quality assurance lead auditor had completed the
required training as specified in accordance with your quality assurance auditor qualification
manual. The second violation, with two examples, was a failure to initiate a condition report in a
timely manr,er when it was identified that (1) a quality assurance lead auditor had not completed
i
the required training, and (2) a quality assurance surveillance report had not been issued.
j
These violations are of concern because of management's failure to ensure programmatic
requirements were fulfilled when these issues were identified.
i
/
These violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding the violations are described in detail in the enclosed report. Please note that you
/
are required to respond to this letter and should follow the instructions specified in the enclosed
i
Notice when preparing your response. The NRC will use your response, in part, to determine
whether further enforcement action is necessary to ensure ccmpliance with regulatory
requirements.
An observation was made regarding the methodology used for tracking assessment report
i
findings. The methodology was not proceduralized prior to August 1997, and a potential
to fail to track and evaluate assessment report findings existed. This observation is a
concern when considered with a previously identified violation (discussed in NRC Inspection
Report 50-285/97-13) that documented a failure to initiate a condition report for a condition
adverse to quality that was identified in an engineering self assessment. It is our understanding
9803300016 980325
ADOCK 05000285
O
}
.
.
Omaha Public Power District
-2-
that during the exit meeting on February 13,1998, you made a commitment to conduct a review
of all assessments performed within 18 months prior to the issuance of Guideline FCSG-4 in
August 1997. This review is to identify any failures to initiate condition reports for assessment-
identified conditions adverse to quality. Please confirm this regulatory commitment in writing
within 30 days of the date of this letter.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its
enclosures, and your response will be placed in the NRC Public Document Room (PDR).
Should you have any questions concerning this inspection, we will be pleased to discuss them
with you.
Sincerely,
Yb 0
&
Dr. Dale A. Powers, Chief
Maintenance Branch
Division of Reactor Safety
Docket No.:
50-285
License No.: DPR-40
Enclosures:
2. NRC Inspection Report
50-285/98-02
i
cc w/ enclosures:
James W. Tills, Manager
Nuclear Licensing
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adrr..
P.O. Box 399
Hwy. 75 - North of Fort Calnoun
Fort Calhoun, Nebraska 68023-0399
James W. Chase, Manager
Fort Calhoun Station
. P.O. Box 399
Fort Calhoun, Nebraska 68023
i
.
- Omaha Public Power District
-3-
Cheryl Rogers; LLRW Program Manager
Environmental Protection Section .
Nebraska Department of Health -
301 Centennial Mall, South
P.O. Box 95007
Lincoln, Nebraska 68509-5007
,
I
,
..
.
Omaha Public Power District
-4-
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDFSK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE01)
"
bec distrib. by RIV:
Regional Administrator
DRS-PSB
DRP Director
MIS System
Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident inspector
R. Wise
- DOCUMENT NAME: G:\\ Reports \\fes802rp.cej
To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy
RIV: SRI:MB
RIV: SRI:MB
C:MB
SAC
B:PB
C:MB
6
CEJohnson/imb* LEllershaw*
DAPowers
RWise
WJohnson
DAPowers df
03/09/98
03/10/98
03/23/98
03/23/98 03/24/98
03M/98
OFFICIAL RECORD COPY
- Previously Concurred
.
..
Omsha Public Power District
-4
E-Mail report to T. Frye (TJF)
E-Mail report to D. Lange (DJL)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC)
E-Mail report to Frank Talbot (FXT)
bec to DCD (IE0i)
bec distrib. by RIV:
Regional Administrator .
DRS-PSB
DRP Director
MIS System
Branch Chief (DRP/B)
RIV File
Project Engineer (DRP/B)
Branch Chief (DRP/TSS)
Resident inspector
R. Wise
DOCUMENT NAME: G:\\ Reports \\fesB02rp.cej
To receive copy of document, indicate in box:"C" = Copy without enclosures "E" = Copy with enctosures "N" = No copy
RIV:SRl:ME
RIV:SRl:MB
C:MB
SAC
B:PB
C:MB
6
CEJohnson/imb" LEllershaw*
DAPowers
RWise
WJohnson
DAPowers df
03/09/98
03/10/98
03/23/98
03/23/98 03/24/98
03A998
OFFICIAL RECORD COPY
- Previously Concurred
-300002-