Forwards Insp Rept 50-341/91-02 on 910429-0510,23,31 & 0603 & Notice of Violation.Overall Process for Design, Implementation & Testing of Mods Found to Be Adequate
ML20217D002
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/11/1991
From: Greenman E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Orser W
DETROIT EDISON CO.
Shared Package
ML20217D004 List:
References
NUDOCS 9107220029
Download: ML20217D002 (5)


See also: IR 05000341/1991002

Text

-_ _ _ _ _ _ _ _ _

.

.

hhC DC k j

JUL 11.41

Decket No 50-341

The Detroit Edison Company

ATTH: W. 5. Orser

Senior Vice President

Nuclear Generation

6400 North Dixie Highway

Newport, MI 48166

Dear Mr. Orser:

This refers to the special NRC team inspection conducted by Messrs. B. Drouin,

M. Dapas, E. Plettner, S. Reynolds and Ms. M. Miller at the Fermi 2 site on

April 29 thrcugh May 10, 1991, and the NRC in-office review of May 23 and 31

and June 3, 1991, concerning the fermi 2 modification implementation process.

This inspection covered modification activities at Fermi 2 authorized by

facility Operating License No. NPF-43. Our findings were discussed with you

and others of your staff at the conclusion of the onsite inspection on

May 10, 1991, and with Mr. R. Newkirk of your staff on June 10, 1991.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations and

interviews with personnel. The primary emphasis of the inspection was to

conduct a performance-based evaluation of modification work activities.

The overall process for the design, implementation, and testing of

modifications was adequate. Management planning, engineering design package

preparation, field implementation, supervisory oversight, engineering support,

and craft knowledge all were good. However, detracting from the overall good

performance were numerous minar documentation errors, work steps occasionally

performed nonsequentially as called for in the work procedures, and several

instances of cortractor personnel failing to follow proper radiological

controls.

During this inspection, certain of your activities appeared to be in violation

of HRC requirements, as specified in the enclosed Notice. A written response

is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC Public Document Room.

9107220029 910711

PDR ADOCK 050003/1 - 160 l

G PDA q

-- - - _ - _ _ _ _ - - _ _ - _ - _ - _ _ _ - _ _ _ _ _ _ _ _ _ - - _ _ _ _ ____

_ . ._._.__.m_ -.. ._. - _ _ _ .. _ . _ . . _ . _ _ _ _ _

_ _ _ _ _ .

.

...

JUL 11.1931_

The Detroi+ Edison Company. 2

'.-

-

The responses directed by this letter and the enclosed Notice are not subject

to the clearance arocedures of-the Office of Management and Budget as required

-

by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

We will gladly discuss any_ questions you have concerning this inspection.

Sincerely,

~~I

~

'

C!.13::?l

Edward G. Greenman, Director

Division of Reactor Projects

Enclosures: '

1. Notice of Violation

2. Inspection Report

No.50-341/91002(DRP)

cc w/ enclosures:

D. R. Gipson, Assistant Vice

President A Manager Nuclear

Productics

LPatricia Anthony, Licensing

F. A. Marquardt, Corporate

Legal Department

DCD/DCS(RIDS)

OC/LFDCB '

Resider,t Inspector, RIII

James R. Padgett,-Michigan Public

Service Commission-

Harry H. Voight, Esq.

Michigan Department of

Public Health

Monroe County Office of

Civil Preparedness.

fermi, LPM, NRR

.

4

(see attached concurrence)

RIII

-

N RIII Rill Rill RIT ,

S sy' Acy"s I f 'eFaydt  %? te Greger Clayton G ree~nm7 0- Q/

D/ouln/ IF D

(Section6)

_ _ .. _ _ _ __ _ __._._ _ .._ .____ ____,..- _.__ _ _ .._,_..___ _ .__ __,.._. ,. _ _..__ _ .

.

-}

.

JUL 111331

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the 0ffice of Management and Budget as required

by the Paperwork Reduction Act of-1980, Pub. L. No. 96.511.

.k'e will gladly discuss any questions you have concerning this inspection.

Sincerely,

~

C:.: . .. ' - . ~n.::J;I j

Edward G. Greenman, Director

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2. Inspection Report

No.50-341/91002(DRP)

cc w/ enclosures:

D. R. Gipson,-Assistant Vice

President & Manager Nuclear

Production

-Patricia Anthony, Licensing

P. A. Marquardt, Corporate

Legal Department

DCD/DCS(RIDS)

OC/LFDCB

Resident Inspector, RIII

James R. Padgett, Michigan Public

Service Commission

-Harry H. Voight, Esq.

Michigan Department of

Public Health

Monroe County Office of-

. Civil Preparedness

Fermi, LPM, NRR

.

- .

%

RIII RII RII RIII RI

M,$)' f())W De ey .tte

Q)W ' 14'

Gr er

f

Clayton Greyrpf,,

}

,. D ouin/lh

(Sec icn o 6)

7/Gw

.

L

[ 7 5 f[ -


,-,-e.- , - . . . . - , - , ~ .-...,--,,,,-,,.,-,,..,.,,,-.~~--w..,_-_.,m ,nr,.-.-n. ,,.,-,r,., , -- , ,4.,..-v -,m. n ,-,-x,an,- , , - , -.--g

, , , - , . .~ ~ . , . . , - .- .. - . . - - - - . .. - - ~ ~ . _ - . ~ . - -

^

.l

'

.

.- .

A E8  ? UNITED' STATES i

.p

+" ' *,

, NUCLEAR < REGULATORY' COMMISslON

7 'E REGION in

5 j - 799 stoosEVELT fioAo

% C oLEN ELLYN, ILLINot5 40137'

21,,.....f^ -

-

JUL 11 WI

I

~ Docket No. 50-341- .

'

The' Detroit Edison Company

ATTN: W.--S. Orser

Senior Vice President

' Nuclear Generation

6400 North Dixie Highway-

Newport, fil 48166

Dear Mr. Orser:

'

This refers.to the-special NRC team inspection-conducted by Messrs. B. Drouin,

N. Dapas, E. Plettner, S. Rey'nolds and Ms. M. Miller at the Fermi 2 site on

April _29 through May 10, 1991, and the_NRC in-office review of May 23 and 31 ,

and June _3, 1991,-concerning the Fermi 2. modification implementation process. '

This inspection covered modification activities at Fermi 2 authorized by

- Facility Operating License No. NPF-43. Our findings were discussed with you

and others of youristaff at the conclusion of the.onsite inspection on

-

e

May : 10, 1991,- and with Mr. R. Newkirk of your staff on June 10,. 1991...

' The. enclosed copy of our inspection report identifies areas examined during

tne' inspection. Within these areas, the inspection-consisted of a selective

examination of. procedures and representative. records, observations and

-interviews with personnel.. The primary emphasis _of -the _ inspection was to

conduct a. performance-based evaluation of modification work activities.

.

'The overall_ process for the design, implementation, and testing of'

modifications was adequate. Management planning, engineering-design package

preparation, field implementation, supervisory oversight, engineering support,

and craft knowledge all_were good. However,. detracting from the-overall good- *

. performance were numerous minor documentation errors, work steps occasionally

-performed nonsequentially as called _for in the work procedures, and several-

-instances lof contractor personnel failing to follow' proper radiological

Lcontrols..

During this inspection, certain of -your activities appeared to be. in violation

of NRC1 requirements, as specified in the enclosed Notice. A written response

is required.

'In accordance with'10 CFR 2.790 of the, Commission's regulations, a copy of

.

this letter, the enclosures, and your response to this letter will be placed '

in the NRC Public Document Room.

,

--m+ w . , + . w.'- ,-%w e,, -m. 2.- .-,,w--e , ,-*.-a w"w - - ww-e a= ar a *ec he-r-e s- *P W tm=w-s

._

- *

, JUL 11 W

The-Detrolt Edison' Company- 2

.

The responses directed by this' letter and the enclosed Notice are not subject

to the clearcnce procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act. of 1980, Pub. l . No. 96.511,

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

{Qk. &= = -b

Edward G~. Greenman, Director .

Division of Reactor Projects

Enclosures:

1. Notice of Violation '

2. Inspection Report -

No. 50-341/91002(DRP)

-cc w/ enclosures:

D. R. Gipson, Assistant Vice

President 8 Manager Nuclear

Production

Patricia Anthony, Licensing'

P. A. Marquardt, Corporate

Legal Department

DCD/DC8 (RIDS).

OC/LFDCB

Resident Inspector, Rill

James R. Padgett, Michigan Public >

-Service Commission

Harry H. Voight, Esq.

Michigan Department of

'Public Health

Monroe County Office of

Civil Preparedness

Fermi, LPM, NRR

.