ML20217C776

From kanterella
Jump to navigation Jump to search
Forwards Internal Audit Rept IA-9704, Millstone Unit 2 ICAVP Project, IAW Section 3.3.2 of Millstone Unit 2 ICAVP
ML20217C776
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/30/1997
From: Curry D
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20217C782 List:
References
NUM2-PPNR-0615, NUM2-PPNR-615, NUDOCS 9710020073
Download: ML20217C776 (1)


Text

_ _ - - - --

p

. PARCONO Daniel L Curry, Vee President. texk* Swces Parsons Power Group loc.

2675 Morgantown Road

  • Reading. PennsyNania 19607 * (610) 855-23C6
  • Fax (610) 855-2002 September 30,1997 Docket No. 50-336 Parsons NUM2 PPNR-0615-L U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Millstone Nuclear Power Station Unit No. 2 Independent Corrective Action Verification Procram (ICAVP)

Gentlemen:

In accordance with section 3.3.2 of the Millstone Unit 1 Independent Corrective Action Verification Plan,

- attached is Parsons P6wer Group Inc. Internal Audit Repo ' 'A-9704. This report documents the quality assurance audit conducted during August 5 through August 26,1997. No audit findings were issued, as results were satisfactory. No response to this report is necessary, i

Contact me at (610) 855-2366 if you require additional information.

Sincerely, f

d4 <

Daniel L. Curry _

[

Parsons ICAVP Project Director DLC:djv Attachment

- cc: E. Imbro (2) - USNRC r

9710020073 970930 PDR ADOCK 05000336- /

P PDR b ~ O I.' 9 3 b.N.$h.h.!Nblhh.l c 1 PPNR0615. doc

-