e eV Cf y1 fi4 UNITED STATES 3 '%i NUCLEAR REGULATORY COMMISSION k \\ $ s [) f WAsHIN01oN, O C. 2W4 J
July 2, 1991 Docket flo.52-002 MEMORANDUM FOR: Charles L. Miller, Director Standardization Project Directorate Division of Advanced Reactors and Special Projects Office of Nuclear Reactor Regulation FROM:
Thomas V. Wambach, Project Manager Standardization Project Directorate Division of Advanced Reactors and Special Projects Office of Nuclear Reactor Regulation
SUBJECT:
CE SYSTEM 80+ DESIGN OVERVIEW PURPOSE:
A presentation of a broad scope overview of CE System 80+ design has been scheduled for all NRC reviewers, their supervisors, and any interested contractors (if your contracts support the expense of their travel). This is intended to be an overall plant f amiliarization, highlighting the evolutionary features (i.e., beyond CE System 80). A listing of some of those features is enclosed. This is not intended to be a discussion of details a
in any specific area of each reviewer's responsibility.
In-depth issues should be the subject of separate meetings or telephone calls of a much narrower scope.
However, all reviewers are encouraged to attend to obtain knowledge of a broad overview of the plant design and new features.
DATE & TIME:
July 16, 1991 8:30 a.m. - 11:30 a.m.
LOCATION:
U.S. Nuclear Regulatory Commission Rm iF22 One White Flint North 11555 Rockville, Pike Rockville, Maryland 20852 PARTICIPANTS *:
NRC T. Wambach Y. Kim M. Franovich M. Chiramal J. Tsao M. Waterman F. Witt P. Gill D. Terao
- 0. Chopra J. McIntire J. Kudrick J. Rajan J. Lyons R. Rothman S. J. Campbell D. Jeng D. Notley H. Ashar H. Walker P. Sobel M. Rubin S. Sun L. Kopp T. Essig J. Wigginton C. Hinson F. Hawkins J. Spraul R. Ramirez R. Eckenrode R. Corrica D. Smith G. Galletti R. Dube B. Mendelsohn F. Kantor R. Emch K. Cotton A. El-Bassioni
@po t n -
.s
[I.
f
)b I ll f
91071dOODO 910702 DR ADOCK 0500 2
2 July 2. 1991 E.[
S. Ritterbusch, et al.
Note:
Please inform Tom Wambach 492 1103 or Mike Franovich 492-1105 whether you and any of your contractors or supervisors will attend.
We may be forced to a large room.
Because of limited, space oniv System 80+ reviewers & supervisors should attend.
ORIGINAL SIGNED BY TWAMBACH Thomas V. Wambach, Project Manager Standardization Project Directorate Division of Advanced Reactors end Special Projects Office of Nuclear Reactor Regulation
Enclosure:
As stated cc w/ enclosure:
See next page
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners intervenors, or other parties toattendasobserverspursuantto"OpenMeetIngStatementofNRCStaff Policy," 43 federal Register 20858, June 28, 1978.
DFC :LA/PD5T
- FijfgD5I
- FM/PD5T
/ :D/PD51 3.f.14
...:..<.f/.f....:...k.7....:............:............:.......
NAME:PShenh.q..:.....:......\\.@....:TWaM6ac : cg :
Hf jK/ich
- CMi imt c.>.....:............:............:............:.......
DATE : f / l/91
- 7///91
/p/91
- 7 / /91 4
0FFICIAL RECORD COPY Document Name:
CE SYSTEM DESIGN m
J k
0 Combustion Engineering, Inc.
Docket No. STN 52-002 Mr.E.H.KennedyIcensing Manager cc:
Nuclear Systems L Combustion Engineering 1000 Prospect 8111 Road Windsor, Connecticut 06095 i
Mr. A. E. Scherer, Vice President Nuclear Quality ABB Combustion Engineering Nuclear Power 1000 Prospect Hill Road Post Office Box 500 Windsor, Connecticut 06095-0500 Mr. C. D. Brinkmon, Manager Washington Nuclear Operations Con 6ustion Engineering, Inc.
12300 Twinbrook Parkway Suite 330 Rockville, Maryland 20852 Mr. Stan Ritterbusch Nuclear Licensing Combustion Engineering 1000 Prospect Hill Road W\\ndsor, Connecticut 06095-0500 Mr. Daniel f, Giessing U.S. Department of Energy NE-42 Washington, D.C.
20585 Mr. Steve Goloberg Budget Examiner 725 17th Street, NW Room 8002 Washington, D.C.
20503
q Enclosure System 80+ Design Oyerview Increased Margins
- Lower RCS Hot Leg Tempereture
- Larger Pressurizer
- Larger Steam Generator Four Train Safety Injection (No LPSI)
Four Train Emergency feedwater Safety Depressurization System Spherical Containnent Quadrantization In containnent Refueling Water Storage Reactor Cavity Flooding, Core Debris Area and Entrainment NUPLEX 80+ Advanced Control Complex Electrical System Redesign including Combustion gas turbine generator i
6 J
y
- + - -
n
+
. DISTRIBUTION
, Central T11e NRC PDR PDST Reading T. Murley/f. Miraglia (M512G18)
J.Partlow(MS12G18)
D. Crutchfield W. Travers V. McCree D. Borchardt T. Boyce M. Franovich T. Kenyon C. Posiusny D. Scaletti T. Wanbach J.H. Wilson J.N. Wilson R. Ranieri EAD(MS11A1)
A.Chaffee[MNBB3701)
R. Hasselber 000 (MS15B18 E, Jordan B. Grimes (MS9A2)
Receptionist (OWIN)
ACRS(10?(MSP-315)
GPA/PA (liS2GB)
E. Tana (MS12G18) )
Y.Overton,(M512E4)
L. Plisco (MS12G18 P. Shea T. Essig, 1004 Y. Kim, 7H15 M. Chiramal, 8E23 J. Tsao, 704 M. Waterman, 8H3
- f. Witt, 7D4 P. Gill, 7E4 D. Terno. 7E23
- 0. Chopra, 7E4 J. McIntyre, 7E23 l
J. Kudrick, 8D1 J. Rajan, 7E23 J. Lyons, 8D1 R. Rothman. 7H15 S. J. Campbell, 801 D. Jeng 7H15 D. Notley, 801 H. Ashar, 7H15 H. Walker, BD1 P. Sobel, 7H15
-M. Rubin, 8E2 S. Sun, 8E23 L. Kopp, BE23 J. Wigginton, 10D4 C. Hinson,1004 E. Hawkins, NL5007 J. Spraul, 10A19 R. Ramirez, 10A19 R. Eckenrode, 10D24 R. Correia,_10024 D. Smith, 7D4 G. Galletti, 10D4 R..Dube, 9024 B. Mendelsohn, 9D24
- f. Kantor. 9H15 R. Emch, 11E22 K. Cotton,11E22 A. El-Bassioni, 10E4
~.
~