Forwards Insp Rept 50-331/97-12 on 970821 & Nov. Concerns Re Corrective Actions Not Being Implemented in Timely Manner Noted.Emergency Operating Procedure Not Corrected Almost 3 Yrs Following Dept Recommendations
ML20217C520
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/22/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Franz J
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20217C526 List:
References
50-331-97-12, NUDOCS 9710010423
Download: ML20217C520 (3)


See also: IR 05000331/1997012

Text

_______

-

e

a

/ # *N,,h

f

UNITEo STATES

NUCLEAR REGULATORY COMMISSION

,

[!(gN,,ff:g j

ntoion m

  • 1

i

g

,

k

aos wAnntwut noAo

j

USLt,ILUNots roS32 43$1

'

'

+...*

Septernber 22, 1997

l

l

Mr. John F. Frant, Jr.

Vice President, Nuclear

lES Utilities. Inc.

200 First Street SE

P. O. Box 351

Cedar Rapids, IA 52406 0351

l

Dear Mr. Franz:

SUBJECT:

NRC NOTICE OF VIOLATION AND INSPECTION REPORT

NO. 50 331/97012(DRP)

i

Dear Mr. Franz:

On August 21,1997, the NRC completed a routine safety inspection at your Duane Arnold

Energy Center (DAEC) facility. The enclosed report presents the results of that inspection.

During the 6 weet, period covered by this inspection, your conduct of activities at the

DAEC facility was characterized by a safety conscious approach. Work activities were

well controlled and emergent work issues were promptly resolved. We are concerned,

however, about a violation of NRC requirements that was identified by the inspectors

involving two exumples where corrective actions were not implemented in a timely

-manner, in the first instance, an Ernergency Operating Procedure was not corrected for

almost three years following several engineering department recommendations, in the

second instance, engineering personnel identified loose supports on the emergency diesel

.

generator fuel oil piping; however, the supports were not promptly repaired. Additionally,

a final operability determination was not documented as required by your corrective

actions program. This violation is cited in the enclosed Notice of Violation (Notice), and

the circumstances surrounding the violation are described in detailin the enclosed report.

Please note that you are required to respond to this letter and should follow the

instructions specifiod in the enclosed Notice when preparing your response. The NRC will

use your response, in part, to determine whether further enforcement action is necessary

to ensure compliance with regulatory requirements.

k

(

9710010423 970922

g\\.

PDR

ADOCK 05000331

a

PDR

khhhh@

a

o

]

J. F. Franz

2-

! !

In accordance with 10 CFR Part 2.790 of the NRC's * Rules of Practice," a copy of this

l

!

letter and its enclosuros will bo placed in the NRC Public Docurnent Roorn.

1'

Sinceroly.

ll

W f

//A)'

Goof froy E. Grant, Director

Division of Reactor Projects

Docket No. 50 331

License No. DPR 49

Enclosures:

1. Notico of Violation

2. Inspection Report No. 50 331/97012(DRP)

,

cc w/encis:

L. Root, President and

Chief Operating Officer

G. Van Middlesworth,

Plant Manager

K. E. Poveler, Manager,

Regulatory Performance

Chairperson, Iowa Utilities Board

e

4

.

.

J. F. Franz

2-

In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy of this

letter and its enclosures will be placed in the NRC Public Document Room.

Sincerely,

/s/ Marc L. Dapas for

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket No. 50 331

License No. DPR 49

Enclosures:

1. Notice of Violation

2. Inspection Report No. 50 331/97012(DRP)

cc w/encts:

L. Root, President and

Chief Operating Officer

G. Van Middlesworth,

Plant Manager

K. E. Peveler, Manager,

Regulatory Performance

Chairperson, Iowa Utilities Board

,

Docket File w/enets

PUBLIC IE 01 w/encls

DRP w/oncls

Project Mgr., NRR w/encls

SRI DAEC w/encls

OC/LFDCB w/encls

CAA1 w/encls (E-Mail)

A. B. Beach w/encls

Deputy RA w/encls

Rlli Enf. Coordinator w/encls

Rlli PRR w/encls

TSS w/encls

DRS (2) w/encls

DOCDESK (E mail)

See attached concurrences

DOCUMENT NAME: R:\\lns pr pt s\\p o w e rs\\d ua n\\D U A 97012. D R P

- 3 = .. . . . , . , . . . .

. . . . .. . . . . 4 . . . w . c . c.,, . . . .. . . . .. / ... i c . c .,, . . . . . f ... i

-

OFFICE

Rlli

Rlli

Rlli

h

Rill

,

,,

"" "'d"f0

%c"1E1.,&NOv " 'd"4Df

'""'###

"

"^""

DATE

09/N97

09/ /97

09/fV97

09/f)7

OFFICIAL RECORD COPY

.