Submits Summary of 980209 Meeting W/Nuclear Energy Inst in Rockville,Md to Discuss Status of Generic Activities Re Grid Stability,Reliability & What Deregulation & Industry Restructuring May Have on Grid
ML20217C429
Person / Time
Issue date: 03/13/1998
From: Poslusny C
NRC (Affiliation Not Assigned)
To: Bateman W
NRC (Affiliation Not Assigned)
References
NUDOCS 9803270002
Download: ML20217C429 (4)


Text

7 t

M **u y

UNITED STATES g

j NUCLEAR REGULATORY COMMISSION 8

WASHINGTON, D.C. 30006 00M o

'%, *.****/j March 13, 1998

{

MEMORANDUM TO: William H. Bateman, Director Project Directorate IV 2 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Chester Posiusny, Senior Project Manager hh FROM:

Project Directorate IV-2 Division of Reactor Projects lil/IV

]

Office of Nuclear Reactor Regulation i

SUBJECT:

MEETING WITH NUCLEAR ENERGY INSTITUTE (NEI)

On February 9,1998, NRC and Nuclear Energy Institute (NEI) staff met in Rockville, Maryland to discuss the status of NRC and NEl generic activities related to grid stability and reliability and what deregulation and industry restructuring may have on the grid. Enclosure 1 is the agenda for the meeting and Enclosure 2 is a list of those who attended the meeting.

NRR staff discussed the key aspects ofits action pian. Specifically, the staff with support from Oak Ridge National Laboratory has completed visits to 5 load dispatch centers, completing about half of the total planned trips and is continuing its evaluation of the information obtained from load dispatcher center operations staff and licensee staff supporting the meetings. These trips are to be completed by the end of May. The staff expects to report to the Commission on ite fit 1 dings later this year. In addition, the staff noted that an information notice (lN) is in j

process which discusses the staff's concem about the potential impact of deregulation on the reliability and stability of offsite power supplies for nuclear plants, it is expected that this IN will be issued in the near fututo.

NEl staff discussed its parallel activities. Specifically, the subject of grid reliability has been discussed at two senior level meetings and NEl feels confident that the utilities are aware of the NRC's concems and the importance of maintaining the design basis for offsite power as changes occur in the industry. NEl had considered sending a guidance letter to utilities but has decided to wait until the staff's IN is issued and will consider sending separate correspondence at that time.

Discussions followed about significant findings from the staff's visits to dispatch centers. The staff highlighted the fact that the nuclear licensees in Califomia have been instrumerital in establishing a nuclear protocol with the independent system operator, and endorsed by the State Public Utility Commission to guarantee priority for offsite power supplies to the nuclear units in that state. The staff noted that this was a good initiative and perhaps should be

\\h followed by other states as deregulation beconies implemented.

, g$

9803270002 980313 REVGP ERON C

]DR gy x ()

M-b NT'

_/

1 William H. Bateman March 13, 1998

-It was agreed at the conclusion of the meeting that the staff and NEl will maintain communication as developments arise on this subject.

- Attachments: 1. Meeting Slides

2. Attendance List DISTRIBUTION: (w/atts.1 and 2)

Central Files',

PUBLIC

' PDIV-2 Reading OGC ACRS CPoslusny.

EGoodwin "JCalvo RJenkins DISTRIBUTION: (w/att. 2)

SCollins (SJC1)

WBateman (WHB)

FMiraglia (FJM)

BBoger EAdensam (EGA1)

EPeyton (ESP)

Document Name: MEETSUM.NEl OFC.

PDIV,4) -

PDIV-2 NAME CPos sny E@

DATE 3 /D/ 98 3/lcW 98' OFFICIAL RECORD COPY t

p r __

T" I

Meeting Between NRC and NEl Staff Februarv 9.1998

SUBJECT:

GRID STABILITY AND RELIABILITY AGENDA:

1. Discussion of NRC Activities Program Plan Status Visits to Load Dispatch Centers Status of Deregulation Generic Communication ll.

NEl Activities Concerning Grid Reliability Communications with Licensees Other Actions

o, t

NRC/NEl MEETING FEBRUARY 9,1998 ATTENDANCE SHEET NUCLEAR ENERGY INSTITUTE Richard Myers Adrian Heymer NUS INFORMATION SERVICES i

Jerry Dozier SERCH LICENSING /BECHTEL Altheia Wyche BALTIMORE GAS & ELECTRIC i

Steve Rockford j

DUKE ENGINEERING & SERVICES Michael F. Kennedy NUCLEONICS WEEK Bonnie Williamson NRC Ed Goodwin Jose Calvo Ronaldo Jenkins Chester Posiusny 4

l CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9803270194 DOC.DATE: 98/03/24 NOTARIZED: NO DOCKET #

FACIL:50-461 Clinton Power Station, Unit 1, Illinois Power Co.

05000461 AUTH.NAME AUTHOR AFFILIATION HOPKINS,J.B.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Summary of 980319 meeting w/util in Rockville,MD re potential fix for issues of degraded voltage at Clinton C

Power Station.

A DISTRIBUTION CODE: DF01D COPIES RECEIVED:LTR ENCL k SIZE:

TITLE: Direct Flow Distribution: 50 Docket (PDR Avail)

T NOTES:

E RECIPIENT COPIES RECIPIENT COPIES G

ID CODE /NAME LTTR ENCL ID CODE /NAME LTTR ENCL 0

INTERNAL: FILE CENTER 01 1

1 NUDOCS-ABSTRACT 1

1 R

EXTERNAL: NOAC 1

1 NRC PDR 1

1 Y l 2

D 0

C U

M E

N T

NOTE TO ALL

  • RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD) ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED: LTTR 4

ENCL 4