ML20217C368

From kanterella
Jump to navigation Jump to search
Complies W/Property Insurance Reporting Requirements of 10CFR50.54(w)(3) on Property Insurance Coverage.Required Info Detailing Coverage Listed
ML20217C368
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/23/1998
From: Swailes J
NEBRASKA PUBLIC POWER DISTRICT
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NLS980051, NUDOCS 9803260432
Download: ML20217C368 (3)


Text

/

P.O. BOX BROWN K.LE NE 88321 p' obraska Public. Power District "i W ""

i 1

NLS980051 March 23,1998-U.S. Nuclear Regulatory Commission ATTN! Document Control Desk

. Washington, DC 20555-0001

' Gentlemen:

Subject:

NRC Rule on Property Insurance - 10 C.F.R.{50.54(w)(3)

Cooper Nuclear Station NRC Docket No.- 50-298, DPR-46

' The purpose of this letter is to' comply with the property insurance reporting requirements of 10 C.F.R. 50.54(w)(3) on propeny insurance coverage. The following list provides the required information detailing the propeny insurance coverage maintained by Nebraska Public Power

. District (NPPD)'and MidAmerican Energy Company (MEC) for Cooper Nuclear Station at

- Brownville, Nebraska.

Policy J Policy; f

Expiration

. Amount of Type of Coverage 0 holder Number -

'Insureri Date :

Coverage Primary Nuclear Property NPPD 97135' ANI/MAELU 5/1/98

$500,000,000 Insurance Decontamination Liability, NPPD X97-086 NEIL II 11/15/98 $1,125,000,000 Decommissioning Liability, and part of Excess Nuclear Property Insurance

$2,250,000,000 il MEC X97-071 NEIL II 11/15/98 $1,125,000,000

. part of jbfg

$2,250,000,000 Total

$2,750,000,000 Under terms of a power sales contract with MEC, NPPD makes available one-half of the production

- ofCooper Nuclear Station to MidAmerican with the balance available to the NPPD Electric System.

MEC and the NPPD Electric System each pay a proportionate share of the nuclear fuel costs (based.

.on energy actually' delivered) plus one-halfof all other costs of the facility. As a result, MidAmerican

- is also liable for 50 percent of the decontamination liability posed by operation of the nuclear power l

P ant.

9003260432'990323'

' POR ADOCK 05000298 J

PDR g

.e me

_w p,

-.gp4 a,

w.w, AA yg.

'g.

d,,m,,

're--m4 -t h a

> %enar--*w.-sa-

.-re

-.me, 4

1 NLS980051 -

March 23,1998 Page 2; If you should have any questions or require any additional information, please advise.

Sincerely, 7

l.M.S iles t

Vic Presi t of uclear Energy x

/nr cc:-

Regional Administrator USNRC - Region IV Senior Project Manager USNRC - NRR Project Directorate IV-1 Senior Resident Inspector Cooper Nuclear Station G. L. Vanek, R. W. Beck and Associates S. E. Verbeski, MidAmerican Energy Company NPG Distribution

)

i

/

l a -

]

l ATTACHMEMT 3 LIST OF WRC COMMITMENTS l

Correspondence No: NLS980051 The following table identifies those actions committed to by the District in this document. Any other actions discussed in the submittal represent intended or planned actions by the District. They are described to the NRC for the NRC's information and are not regulatory commitments.

Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.

COMMITTED DATE COMMITMENT OR OUTAGE None l

l I

1 l

l l

PROCEDURE NUMBER 0.42 l

REVISION NUMBER S l

PAGE 9 OF 13 l