ML20217C228

From kanterella
Jump to navigation Jump to search
Discusses 970313 Telcon Between C Sisco & J Romanowski Re Arrangements for NRC to Inspect Licensed Operator Requalification Program at FitzPatrick Facility
ML20217C228
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/17/1998
From: Conte R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Michael Colomb
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
NUDOCS 9803260382
Download: ML20217C228 (3)


Text

E March 17,:1998 f

1

.I f

Mr. Michael J. Colomb.-

Site Executive Officer -

~

New York Power Authority

, James'A. FitzPatrick Nuclear Power Plant

' Post Office Box 41.

L Lycoming, NY 13093 J

SUBJECT:

REQUALIFICATION PROGRAM INSPECTION - FITZPATRICK

Dear Mr. Colomb:

I

. In a telephone conversation on March 13,1997, Mr. Carl Sisco and 1Mr. Joseph Romanowski made arrangements for the NRC to inspect the licensed operator

- requalification program at the FitzPatrick facility.. The inspection is planned for the week of April 20,1998, which coincides with your regularly-scheduled requalification examination cycle..The staff at your facility should prepare and conduct the requalification examinations in accordance with your NRC-approved requalification program.

In accordance with 10 CFR 55.59(c), the NRC may request facility licensees to submit their comprehensive requalification written examinations or annual operating tests as necessary to support the NRC's inspection program needs. In order for the NRC to adequately' prepare for this inspection, please furnish the written examinations and operating tests scheduled for the week of the inspection to the NRC by April 1,1998.

Mr. Romanowski has been advised of this request and provided with the name and address of the NRC lead inspector assigned to this inspection.

i, This letter contains information collections that are subject to the Paperwork Reduction Act i

cf 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the

=

Office of Management and Budget, approval number 3150-0101,which expires on b

April 30, 2000.

_ The public reporting burden for this collection of information is estimated to average 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> per response, including the time for reviewing instructions, gathering and m'aintaining the data needed, and completing and reviewing the collection of information.

Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the information and Records Management Branch (T-6 F33),

U.S. Nuclear Regulatory Commission, Washington, DC 20565-0001,or by internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and

' Regulatory Affairs, NEOB-10202,(3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

%\\

99032603821990317 9

8,0M 6 PDR ADOCK 05000333 w

V PDR

\\

4 Mr. Michael J. Colomb 2

'.Thank you'for your cooperation in this matter. If you have any questions regarding this inspection, please contact me at (610) 337-5211.

Sincerely, Richard J. Conte, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety

' Docket No. 50-333 cc:

C. D. Rapplayea, Chairman and Chief Executive Officer E. Zeltmann, President and Chief Operating Officer

.R. Hiney, Executive Vice President for Project Operations

! J. Knubel, Chief Nuclear Officer and Senior Vice President H. P. Salmon, Jr., Vice President of Engineering

' W. Josiger, Vice President - Engineering and Project Management

~'J. Kelly, Director - Regulatory Affairs and Special Projects T. Dougherty, Vice President - Nuclear Engineering R. Deasy, Vice President - Appraisal and Compliance Services

' R. Patch, Director - Quality Assurance G. C. Goldstein, Assistant General Counsel C. D. Faison, Director, Nuclear Licensing, NYPA.

K. Peters, Licensing Manager'

. T. Morra, Executive Chair,'Four County Nuclear Safety Committee

)

Supervisor, Town of Scriba

.C.- Donaldson, Esquire, Assistant Attorney General, New York Department of Law P. Eddy, Electric Division, Department of Public Service, State of New York G. T. Goering, Consultant, New York Power Authority

-i J. E. Gagliardo,' Consultant, New York Power Authority E. S. Beckjord, Consultant, New York Power Authority

)

F. William Valentino, President, New York State Energy Research and Development Authority

' J. Spath, Program Director, New York' State Energy Research and Development Authority 4

pn j

l

0. -

. Mr. Michael J. Colomb.

3 Distribution:

D. Screnci, PAO (2)-

Nuclear Safety information Center (NSIC)

. PUBLIC NRC Resident inspector

. Region i Docket Room (with concurrences)

J.' Wiggins, DRS -

L. Nicholson, DRS

~ R. Conte, DRS C. Sisco, DRS.

J. Rogge, DRP R. Barkley, DRP R. Junod, DRP--

l B. McCabe, Rl EDO Coordinator

{

S. Bajwa, NRR J. Williams, NRR j

M. Campion, RI Inspection Program Branch, NRR (IPAS)

R. Correia, NRR F.-Talbot, NRR DOCDESK DR3 fil(

DOCUMENT NAME: A:FITZREQ.LTR Ta receive a copy of this document, Indicate la the bos:

"C" = Copy without attachment / enclosure

'E" = Copy with attachment / enclosure

'N" = No copy OFFICE Rl/DRS l

Rl/DRS

, l/

Rl/

l Rl/

l Rl/

l NAME CSisco RConte

//d/

DATE 03/16/98 03//j/98+

03/ /98 03/ /98 03/ /98 OFFICIAL RECORD COPY