_ _ _ - _ - _ _ - _ _ _ _ _ - _ _ _

I.

.)

e l

GPU Nucleat. Inc.

.(

Aoute 441 South NUCLEAR Post Office Box 480 M,ddletown, PA 17057 0480 Tel 717444 7621 September 19, 1997 6710-97-2410 U.S. Nuclear Regulatory Comt Jssion Attn: Document Control Desk Washington, DC 20555

Subject:

Three Mile Island Nuclear Station, Unit 2 (TMI-2)

Operating License No. DPR-73 Docket No. 50-320 PDMS Quarterly Report

Dear Sirs:

The purpose of this letter is to provide the NRC a summary of the activities at TMI-2 during the d

2 quarter of 1997, 1

During the 2" quarter of 1997, GPU Nuclear completed the semi-annual surveillance of the TMI-2 Reactor Building on June 4,1997. No adverse trends of radiological conditions were identified during the inspection. The next inspection of the TMI-2 Reactor Building is scheduled for December,1997.

The Reactor Vessel temperature monitoring system reported the Reactor Vessel temperatures ranged from 46.9 F on April 1,1997 to 68.7 F on June 30,1997. The Reactor Building temperature ranged from 47.9 F on April 1,1997 to 73.4 F on June 30,1997. The largest temperature difference between the Reactor Building and the Reactor Vessel occurred on June 29 and 30,1997, when the Reactor Building temperature was 4.7 F greater than the Reactor Vessel temperature.

goo 90 9709300212 970919 PDR ADOCK 05000320 p {}g l

ikkjkkk g

P PDR

, i, Q

~

i t

.e e

6710-97-2410 Page 2 of 2 l

d Significant work activities during the 2 quarter of 1997 included completion of surveillance testing of the Reactor Building passive breather system and the performance of routine corrective maintenance of the PDMS Control Room air conditioner. In addition, there were some minor repairs to the annunciator alarm system. Dismantlement of non-radiological equipment continued with the removal of miscellaneous equipment primarily located in the Turbine Building.

Please contact Adam hiiller, Thil Licensing Engineer (717) 948-8128 if you have any ques: ions regarding this report.

Sincerely, aa)

< )

James W. Langenbach Vice President and Director, Thil cc:

USNRC TMI Senior Resident Inspector USNRC Th112 Project hianager NRC Regional Administrator, Region 1 Sub File 97025

..