PNO-78-212:on 781218,util Representative Informed NRC of Halting Further Placement of Concrete Structures at Wolf Creek Site Due to Concreting Action That Led to Wall Void in Reactor Containment Wall.No Press Release Planned
ML20217B711
Person / Time
Site: Wolf Creek 
Issue date: 12/19/1978
From: Reinmuth G, Shewmaker R, Thornburg H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
References
PNO-78-212, NUDOCS 9804230115
Download: ML20217B711 (2)


Text

r o

PDs d e %

._q..

24.

J m,

~

9 g

)

PRELIMINARY NOTIFICATION I

~ 'Decembe'r 19,: 1978 q

PRELIMINARYNOTIFICATIONOFEVENTORUNUSUALOUCUNRkNCE-PNO-78 Ia.

This preliminary notification constitutes EARLY notice of event of

)

POSSIBLE safety or public interest significance.

The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date.

Facility: Wolf Creek, Unit No.1 (SNUPPSJ Kansas Gas & Electric Co.

DN STN 50-482

Subject:

STOP WORK 0F CONCRETE PLACEMENT IN SAFETY RELATED STRUCTURES A Kansas Gas and Electric Company (KG&E) representative announced in a meeting in the RIV offices on December 18, 1978, that they had i

immediately halted any further placement of concrete in safety related structures at the Wolf Creek site.

M

' The stop work was imposed as a result of concreting activities which led

~

to a through wall void in the Reactor Containment wall under the equipment g3 hatch (See PN0 78-211).

The stop work order will remain in affect until they have completed a review of the quality ' assurance program including review l

I of procedures, implementation of the procedures and corrective action.

The Constructor, Daniel International, will form an ad hoc committee to review, evaluate and attest to the adequacy of corrective action prior to further placement of safety related concrete.

A KG&E Quality Assurance representative will be present at each committee meeting.

The committee Chairman is to report to the President, Daniel Power Group on a daily basis as to the progress being made on the corrective actions. He, in.

turn, will keep KG&E corporate management informed daily of the committee's significant findings.

Licensee corporate management will discuss with Region IV personnel the completion status of the reviews and corrective measures they have committed to, along with any significant findings prior to resuming the l

Placement of concrete in safey related structures.

No press ' release is planned by either the NRC or the utility,.however, l

there is expected to be media interest due to extensive coverage of the i

containment wall void by the media.

CONTINUED

?>

.iLt3 9804230115 781219 PDR IbE PNO-78-212 PDR i

3 I

i

/

Page 2 December 19, 1978 Continued PNJ-78-212 The Region IV office (Arlington, Texas) received notification of this matter during an 8:00 a.m. meeting with the utility in the RIV offices on December 18, 1978.

This information is current as of 1:00 p.m., December 19, 1978.

Contact:

REShewmaker, IE x27551 GWReinmuth, IE.x27551 HDThornburg, IE x28484 1

Distribution:

Transmitted H St d 4 /

Chairman Hendrie Commissioner Bradford S. J. Chilk, SECY Commissioner Kennedy Commissioner Ahearne C. C. Kammerer, CA

)

Commissioner Gilinsky (ForDistribution) l Transmitted: MNBBth<di[\\

P. Bldg 'h dh53 J.G.Davi!,IE-0d Region TE

__f3:

L. V. Gossick, EDO H. R. Denton, NRR S. H. Hanauer, E00 R. C. DeYoung, NRR J. J. Fouchard, PA R. J. Mattson, NRR N. M. Haller, MPA V. Stello, NRR (MAIL) ess R. G. Ryan, OSP

.R. S. Boyd, NRR J. J. Cummings, 01A H. K. Shapar ELD SS Bldg 24-e5iy>

R. Minogue, SD s

j W. J. Dircks, NMSS l

PRELIMINARY NOTIFICATION e

M i

I I