Transmits Summaries of Telcons Between Parsons Power Group, Inc,Nrc,Nneco & Neac on 970916 & 18 Re Independent Corrective Action Verification Program
ML20217B647
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/22/1997
From: Curry D
External (Affiliation Not Assigned)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9709300104
Download: ML20217B647 (6)


Text

,

l PARSONS Danlei L Curry, Vce Fiesident. Nuctoat Serpes

. Parsons Power Grcup inc.

2575 Morgantown Rosti e Reading. Pennsylvanta 19607 * (610) 855-23G6

  • Fax: (610) 855-2002 September 22,1997 Docket No. 50-336 Parsons NUM2-PPNR-0578-L U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Millstone Nuclear Power Station Unit No. 2 Independent CorrectiygAction Verification Program (ICAVP)

Gentlemen:

This letter transmits summaries of telephone conferences between Parsons Power Group Inc., the U. S.

Nuclear Regulatory Co.nmission, NNECo and NEAC on September 16 and September 18,1997. The

. purpose of these teicphone conferences were ne follows: September 16 - Discuss Calculation Tracking Program, CMP Methodology and Follow-up items from Previous Conferences; September 18 - Discuss Drawing Classification and Status ofInformation Retrieval Issues.

Please call me at (610) 855-2366 if you have any questions.

Sincerely, AM OM Daniel L. Curry Parsons ICAVP Project Director DLC:djv

. Attachments 1.

Telephone Conference Notes from September 16,1997 2.

Telephone Conference Notes from September 18,1997 i

cc:

E. Imbro (2) - USNRC

)l H. Eichenholz - USNRC R. Laudenat - NNECo J. Fougere - NNECo Rep. Terry Concannon - NEAC Project Files ok

((\\,!!hfllhllk}llk,!!f.!,h,

D p

-6!

1

ADMINISTRATIVE CONFERENCE NOTES SEPTEMBER 16,1997 l

PURPOSE:

Administrative telephone conference with NNECo, NRC, NEAC and Parsons to I

discuss:

l Calculation 7 racking Program e

CMP Methodology Follow-up Items From Previous Ct...

tences e

Date:

Sept:mber 16,1997 List of Attendees NNECo NRC NEAC Parsons Joe Fougere Manager, ICAVP Steve Re>uolds T. Concannon Wayne Dobson Fred Mattioli Supervisor, MP2 John Nakoski Eric Blocher N. Hanley Mike Akins Don Marks George Zagursky Derek Garrett Response to RAI-246 (questian from 9/2/97)

THE PURPOSE OF THIS RAI WAS TO OBTAIN INFORMATION ON THE DATE WHZN UNIT 2 WAS FIRST COMMilTED TO IMPLEMENTING EACH OF THE VARIGUS ENGINEERING PROGRAMS AND TOPICAL AREAS. WE NEED THIS INFORMATION AS PART OF OUR REVIEW OF MODIFICATIONS. WE WOULD NOT LOOK FOR CONSIDERATION OF A ENGINEERING PROGRAM OR TOPICAL AREA PRIOR TO THE COMMITMENT DATE. THE RESPONSE TO RAI 246 DOES NOT ADDRESS ALL OF THE ITEMS IDENTIFIED ON DCM FORM 3-2C. WE WOULD LIKE TO DISCUSS THE DIFFERENCES BETWEEN THE RAI RESPONSE AND DCM FORM 3-2C AND CONFIRM THAT WE UNDERSTAND THE DATES PROVIDED IN RAI-246 Discussion 1.

NNECo has zent Parsons a document listing all ofitems on DCM Form 3-2C and the date when Unit 2 was first committed to implementing the item.

CE Design Basis Document (question from 9/4/97)

IS THERE A CE REFERENCE DESIGN BASIS DOCUMENT FOR UNIT 2 SIMILAR TO THE WESTINGHOUSE DOCUMENT FOR UNIT 3?

Response

NNECo contacted ABB-CE to confirm that for this vintage plant there were no reference design basis documents.

PAGE1

ADMINISTRATIVE CONFERENCE NOTES SEPTEMBER 16,1997 Calculation Tracking Program WE RECENTLY NOTICED THAT THE CALCULATION TRACKING DATA BASE HAS GROWN TO 6868 RECORDS. THIS DATABASE IIAD CCNTAINED ABOUT 3800 RECORDS AS RECENTLY AS LAST WEEK. WHAT CALCULATIONS HAVE BEEN ADDED?

Discussion

1. All of the calculations currently in NNECo's document control system for Millstone Unit 1,2,&3 total 10,600. Approximately two weeks ago the Unit 2 calculation j

tracking program,(CTP) was moved into PASSPORT. For Unit 2 there are 2,366 g

calculations in CTP. NNECo has not recently added a large number of calculations to CTP.

2.

Parson's 3800 number came from an estimate of the number of calculations in a paper copy of a list of calculations used by the CMP. This number is higher than the CTP due to some Bechtel and CE calculations which were obtained by the CMP, but have not yet been entered into the records system. Note: some of thesc #echteland CE calculations are part ofthe design andlicensing basisfor Unit 2. Parsons should not totally rely on the CTP to identify all design basis calculations. The PI-07 evaluations can be used as a aid in identifying these calculations.

3. Further investigation after the conference call identified the file that contains 6868 calculations entries is located on Parsons' Millstone server on drive Q and is labeled MITTEBR.ntdb. It en wars that this file has a large number of duplicate entries.

4.

CTP is no longer being used by NNECo. The calculation module of PASSPORT is the current list. Parsons does not currently have access to this part of PASSPORT.

f NNECo will provide this access.

Electronic Access to Information

1. Related to PASSPORT, Parsons will also need limited access to information in MIMS regarding commercial grade dedications. This may be in the form of a ACCESS down lead of the relevant information. Parsons will process an RAI.
2. Parsons will need an updated copy of the UIR database now that CMP is complete.

The UIR database will still be added to for the CMP review of non-group 1 or 2 systems. NNECo plans to provide the updated UIR database to Parsons this week.

CMP Methodology HOW DID YOUR CMP ADDRESS PLANT MODIFICATIONS THAT MAY HAVE BEEN PERFORMED OUTSIDE OF THE AUTHORIZED PLANT CIIANGE PROCESSES IN THE PAST. FOR EXAMPLE, CHANGES MADE UNDER A MAINTENANCE REQUEST OP. WORK ORDER NOT SUPPORTED OR APPROVED WITH A PDRC.

PAGE 2 1

containment isolation is not required.

ADh11NISTRATIVE CONFERENCE NOTES SEPTEh1BER 16,1997 Discussion:

1. Tne Ch1P addressed this issue in the following manner:

The Ch1P review looked for design basis documents not matching plant

]

configuration documentation.

Walkdowns were performed to verify PDCR implementation and to look for undocumented modifications.

The hiaintenance and I&C organizations wue asked to identify if any past practices may have lead to plant modifications outside of the authorized change processes. They did identify some, that the Ch1P then reviewed.

A self assessment was performed on NCRs and RIES which addressed undocumented modifications.

For each of the above,if a problem was found an UIR was written.

Outstanding NNECo responses; l

THE PROCEDURE NUh1BER THAT CONTROLLED PDCE'S (ACTION FROh! 9/2/97 CONFERENCE)

Response: NNECo is in the process of determining which procedures controlled PDCEs. So far they have identified the following: NEO 3.03 rev 6,7,8 NOD 305 rev 0,3 & Station Forni 359. NNECo will provide a copy of these procedures.

THE ELECTRICAL DRAWING SEPISS THAT CONTAINS ELECTRICAL SETPOINT INFORh1ATION. (ACTION FROh! 9/9/97 CONFERENCE)

Response

Drawings 25203-30099 for 480V 25203-30107 for 125VDC 25203-30108 far 4160 25203-30109 for 6.9KV 25203-3011i for RSST IS THE TURBINE BUILDING AND ISLAND QUALIFIED FOR SSE, OBE OR BOTH?

(ACTION FROh19/9/97 CONFERENCE)

Response: The turbine build and island, except for the turbine pedestal are qualified for both SSE and OBE. The PI-07 for the turbine building lists the calculations that document this.

PAGE 3

l l

ADMINISTRATIVE CONFERENCE NOTES SEPTEMBER 18,1997 PURPOSE:

Administrative telephone conference with NNECo, NRC, NEAC and Parsons to discuss:

Drawing Classification Status ofInformation Retrieval issues e

Date:

September 18,1997 List of Attendees NNECo NRC NEAC Parsons Joe Fougere hianager, ICAVP John Nakoski Wayne Dobson Fred Supervisor, htP2 Eric Diocher hiattioli ICAVP Bill Price hiike Akins Dan Curry 1

John Hilbish Greg Cranston Drawing Classification WE EXPECT THAT hilLLSTONE UNIT 2 HAS DIFFERENT CATEGORIES OF PLANT DRAWINGS BASED ON WHEN, OR IF, TiiEY ARE REQUIRED TO BE UPDATED. WE WOULD LIKE A DISCUSSION ON WHAT ARE THESE CATEGORIES AND WHAT IS THE DEFINITION OF EACH CATEGORY? IN PARTICULAR WE WOULD LIKE TO KNOW HOW TO IDENTIFY Tile CATEGORY THAT A SPECIFIC DRAWING BELONGS TO, AND IS THERE A CATEGORY OF DRAWING THAT DOES NOT REQUIRE REVISION?

Discussion 1.

Drawings are categorized as fellows:

Cat.1 - Operation Critical Cat. 2A - QA drawing (there is a time requirement for update) e Cat. 2B - Non-QA drawing (there is a longer time requirement for update)

=

Cat. 2C - Drawing to be updated at the desecration of the Design Supervisor e

a Cat. 3 - Historical, no need to update (typically this is for retired components) e I

This is documented in procedure EDI 30250.

l 1

PAGE 1

i ADMINISTRATIVE CONFERENCE NOTES SEPTEMBER 18,1997 Providing PI-07 Summaries RAI - 335 will be reopened and NNECo will provide Parsons will all of the PI-07 summaries, (similar to what was provided for HPSI and AFW.) There are approx. 66 summaries that we should expect to sec.

Discussion of Information Retrievr41 Issues (NNECo Topic of Discussion)

Status ofitems discussed during the 9/11/97 meeting in Conn.

RAI 217, electrical calculations-donc RAI 198,199 Piping calculations - approx. 50% complete e

FSAR Chapter 14 related calculations - all received by Par +

e RAI 234, Commercial Grade Dedication Packages - done e

RAI 290, EQ Packages - some of the packages were not in Nuclear Records. A CR has been written to address this.

FSAR Change Requests - NNECo provided what the FSARCR procedures require for a FSAR change. If Parsons needs any other documentation to perform its review, they will need to identify the specific type of document.

Bechtel document i1867-014P003 rev 2 and Ii867-014P003 rev i - Nuclear records can only find rev. O. An CR has been written to address this item. NNECo did a one day stand-down to retrain people. No other examples like this situation have been found.-

SP-2604 A Parsons mistakenly inserted a completed data sheet into this surveillance procedure, thinking it was a controlled issue of a form for the procedure.

Parsons did a complete check of all procedures received from NNECo. No other examples of this problem were found. Parsons has corrected its copy of SP-2604A-4, and set up controls to avoid the problem in the future.

PAGE 2