Forwards Insp Rept 50-483/97-15 on 970802-0913.No Violations Noted.Issue Re Testing of Load Shed & Emergency Load Sequencer Circuit Being Treated as Unresolved Items Pending Further Review
ML20217B416
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/22/1997
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
Shared Package
ML20217B420 List:
References
50-483-97-15, NUDOCS 9709250009
Download: ML20217B416 (4)


See also: IR 05000483/1997015

Text

, _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ - _ - - _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _

$ 's 3.o' y vu t t o st Ata s

j

'

/,h;

. NUCLE AR REGUL ATORY COMMISSION '

i =

i' ne ctoN ev

,j j 611 HY AN PLM A DHIVE sulf f 400

"

1 AR LING 10N. T E x AS 11011 8064

7*..<*. y gg y

' Garry L. Randolph, Vice President and

Chief Nuclear Officer

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

'

SUBJECT: NRC INSPECTION REPORT 50 483/97 15

Dear Mr. Randolph:.

An NRC inspection was conducted August 2 through September 13,1997, at your

Callaway Plant reactor facility. The enclosed report presents the scope and results of that

- inspection. i

During the 6 week period covered by this inspection period, conduct of activities at

Callaway Plant was generally characterized by safety conscious operations; sound

engineering practices; and _ appropriate performance of maintenance, surveillance, and plant

support activities.

During this inspection period, site staff discovered that several contacts in the load shed

and ~ emergency load sequencer circuit that inhibit the auto start signals of certain pumps

were not being tested as required by Technical Specification 4.8.1.1.2.g.2.' Although

,

subsequent testing demonstrated that the contacts would operate satisfactorily, literal

compliance with the Technical Specifications may have required that the testing be

performed during shutdown conditions. Since this testing was performed with the reactor

at power, there is a potential that you violated your Technical Specification requirements.

- Accordingly, this issue is being treated as an unresolved item pending further review.

This issue was discussed on September 15,1997, during a conference call between Mr,

i

Ron Affolter and members of his staff and myself and members of my staff. You are

requested to provide a letter which describes your position on this issue within 30 days of

the date of this letter,

i .)

'

L in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

'

and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

,

"

  • f Y

Tt mas P. G'wynd, Director

\

--

ivision of Reactor Projects

'

O

e. PDR-

_ _

'

i

.z.

..

j; .

4 ,

f

Union Electric Company 2

f

i

i

1

Docket No.: 50 483- l

License No.: NPF 30 i

i

- Enclosure: i

NRC Inspection Report l

50 483/97 15- l

i

+

cc w/ enclosure'

Professional Nuclear Consulting, Inc. l

19041 Raines Drive-

Derwood, Maryland 20855

-

.

!

Gerald Charnoff,_Esq. l

Thomas A, Baxter, Esq. -}

Shaw, Pittman, Potts & Trowbridge  ;

2300 N.' Street, N.W. l

Washington, D.C. 20037

i

. H,' O. Bono, Supervising Engineer i

Quality Assurance Regulatory Support {

Union Electric Company i

P.O. Box 620 l

Fulton, Missouri 65251 l

.

. Manager Electric Department  !

Missouri Public Service Commission  !

' 301 W. High

P.O. Box 360-

Jefferson City, Missourl 65102

Ronald'A. Kucera, Deputy Director ,

. Department of Natural Resources

P.O. Box 176 ,

,

Jefferson City, Missouri 65102 l

'

Otto L. Maynard, President and *

, Chief Executive Officer

_ .

'

. Wolf _ Creek _ Nuclear Operating Corporation

P.0, Box '411 -- .

'

Burlington, Kansas 166839.

_

-

'

.)

!

'

i

!

I'

S

3

l-

.!

' '

f >

y  :

o ..  ; _ . .,. _ .-. _ _ _ _ . . _ - . _ . . _ . _ _ . . , _ - . _ . _ , . _ - _ . . . . _ . ~ , . _ _ . .

,. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _

L ,

'

!P

I,

Union Electric Company 3-

Dan 1. Bolef, President ,

Kay Drey, Hepresentative

Board of Directors Coalition

for the Environment

6267 Dolmar Boulevard

University City, Missouri 63130 ,

Lee Fritz, Presiding Commissioner

Callaway County Court House

10 East Fif th Street

Fulton, Missouri 65151

Alan C. Passwater, Manager

Licensing and Fuels

Union Electric Company

P.O. Box 66149

St. Louis, Missouri 63166 6149

J. V. Laux, Manager

Quality Assurance

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

-

.. - - - - - . . , - . - , _ .

+

.

SEP 2 21997

Union Electric Company 4

E Mail report to T. Frye (TJF)

E Mail report to T. Hiltz (TGH)

E Mail report to NRR Event Tracking System (IPAS)

E Mail report '.o Document Control Desk (DOCDESK)

- bec to DCD (IE01)

bec distrib. by RIV:

Regional Administrator - Resident inspector

DRP Director DRS PSB

Branch Chief (DRP/B) MIS System

Project Engineer (DRP/B) RIV File

Branch Chief (DRP/TSS)

DOCUMENT NAME: R:\_CW\CW715RP.DGP-

To receive e%of document. leutcete in bon /C' a Copy without enclosueos *E' = Copy with enclosures *N" = No copy

RIV: SRI U ff C:DRP/B(f D:DRP , A/

M *{ V - WDJohr$6n TPGwynrkf#

09/1 09/lW97 09M97//

~

OFFICIAL R EC0HD Col'Y

.

. _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ -

F

'

SEP 2 21997

Union Electric Company -4-

l

E Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tract '79 System (IPAS)

E Mail report to Document Controi Desk (DOCDESK)

bec to DCD (IE01)

bec distrib, by RIV:

Regional Administrator Resident inspecter

DRP Director DRS-PSB

Branch Chief (DRP/B) MIS System

Project Enginee: ;DRP/B) RIV File

Branch Chief (DRP/TSS)

.

DOCUMENT NAME: R:\_CW\CW715RP.DGP

To receive cop?gof document, indicate in boxFC" = Copy without enclosures *E' = Copy with enclosures *N' = No copy

' D:DRP

_R V: SRI () /f C:DRP/B Q , A/ l l

DGPasseth L/ WDJohrf6n TPGwyntig /!?

09/15/97 09/l&97 09M97 //

"-~DFFICIAL RECORD CO?Y

l