ML20217B416
| ML20217B416 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 09/22/1997 |
| From: | Gwynn T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Randolph G UNION ELECTRIC CO. |
| Shared Package | |
| ML20217B420 | List: |
| References | |
| 50-483-97-15, NUDOCS 9709250009 | |
| Download: ML20217B416 (4) | |
See also: IR 05000483/1997015
Text
, _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - _ - _ - - _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _
$
's
3.o' y
vu t t o st Ata s
'
/,h; j
. NUCLE AR REGUL ATORY COMMISSION '
i
=
i'
ne ctoN ev
611 HY AN PLM A DHIVE sulf f 400
,j
j
"
1
AR LING 10N. T E x AS 11011 8064
7*..<*.
y gg y
' Garry L. Randolph, Vice President and
Chief Nuclear Officer
Union Electric Company
P.O. Box 620
Fulton, Missouri 65251
'
SUBJECT: NRC INSPECTION REPORT 50 483/97 15
Dear Mr. Randolph:.
- An NRC inspection was conducted August 2 through September 13,1997, at your
Callaway Plant reactor facility. The enclosed report presents the scope and results of that
- inspection.
i
During the 6 week period covered by this inspection period, conduct of activities at
Callaway Plant was generally characterized by safety conscious operations; sound
engineering practices; and _ appropriate performance of maintenance, surveillance, and plant
support activities.
During this inspection period, site staff discovered that several contacts in the load shed
and ~ emergency load sequencer circuit that inhibit the auto start signals of certain pumps
were not being tested as required by Technical Specification 4.8.1.1.2.g.2.' Although
subsequent testing demonstrated that the contacts would operate satisfactorily, literal
,
compliance with the Technical Specifications may have required that the testing be
performed during shutdown conditions. Since this testing was performed with the reactor
at power, there is a potential that you violated your Technical Specification requirements.
- Accordingly, this issue is being treated as an unresolved item pending further review.
This issue was discussed on September 15,1997, during a conference call between Mr,
i
Ron Affolter and members of his staff and myself and members of my staff. You are
requested to provide a letter which describes your position on this issue within 30 days of
the date of this letter,
i
.)
'
L
in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
'
and its enclosure will be placed in the NRC Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to discuss
them with you.
Sincerely,
,
- f Y
\\
Tt mas P. G'wynd, Director
"
--
ivision of Reactor Projects
'
O
e.
PDR-
_
_
..
i
'
.z.
j;
.
4
,
f
f
Union Electric Company
2
i
i
1
Docket No.: 50 483-
l
License No.: NPF 30
i
i
- Enclosure:
i
NRC Inspection Report
l
50 483/97 15-
l
i
+
cc w/ enclosure'
Professional Nuclear Consulting, Inc.
l
19041 Raines Drive-
Derwood, Maryland 20855
.
-
!
Gerald Charnoff,_Esq.
l
Thomas A, Baxter, Esq.
-}
Shaw, Pittman, Potts & Trowbridge
2300 N.' Street, N.W.
l
Washington, D.C. 20037
i
. H,' O. Bono, Supervising Engineer
i
Quality Assurance Regulatory Support
{
Union Electric Company
i
P.O. Box 620
l
Fulton, Missouri 65251
l
.
. Manager Electric Department
!
Missouri Public Service Commission
!
' 301 W. High
P.O. Box 360-
Jefferson City, Missourl 65102
Ronald'A. Kucera, Deputy Director
,
. Department of Natural Resources
P.O. Box 176
,
Jefferson City, Missouri 65102
l
,
'
Otto L. Maynard, President and
Chief Executive Officer
'
,
_
.
Wolf _ Creek _ Nuclear Operating Corporation
.
P.0, Box '411 --
.
'
Burlington, Kansas 166839.
-
_
.)
'
!
'
i
!
I'
S
3
l-
. !
f
'
'
y
>
o
..
-
- _ .
.,. _ .-. _ _ _ _ . . _
- .
. .
.
_ . . , _
- . _ . _ , . _ - _ . . . . _
. ~ , . _ _ . .
,.
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _
_ _ _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _
L
,
!P
'
I,
Union Electric Company
3-
Dan 1. Bolef, President
,
Kay Drey, Hepresentative
Board of Directors Coalition
for the Environment
6267 Dolmar Boulevard
University City, Missouri 63130
,
Lee Fritz, Presiding Commissioner
Callaway County Court House
10 East Fif th Street
Fulton, Missouri 65151
Alan C. Passwater, Manager
Licensing and Fuels
Union Electric Company
P.O. Box 66149
St. Louis, Missouri 63166 6149
J. V. Laux, Manager
Quality Assurance
Union Electric Company
P.O. Box 620
Fulton, Missouri 65251
-
..
-
-
-
-
-
. . , - .
- , _ .
+
.
SEP 2 21997
Union Electric Company
4
E Mail report to T. Frye (TJF)
E Mail report to T. Hiltz (TGH)
E Mail report to NRR Event Tracking System (IPAS)
E Mail report '.o Document Control Desk (DOCDESK)
- bec to DCD (IE01)
bec distrib. by RIV:
Regional Administrator
- Resident inspector
DRP Director
DRS PSB
Branch Chief (DRP/B)
MIS System
Project Engineer (DRP/B)
RIV File
Branch Chief (DRP/TSS)
DOCUMENT NAME: R:\\_CW\\CW715RP.DGP-
To receive e%of document. leutcete in bon /C' a Copy without enclosueos *E' = Copy with enclosures *N" = No copy
RIV: SRI U ff
C:DRP/B(f
D:DRP
A/
,
M
- { V -
WDJohr$6n
TPGwynrkf#
09/1
09/lW97
09M97//
~
OFFICIAL R EC0HD Col'Y
.
. _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ -
F
'
SEP 2 21997
Union Electric Company
-4-
l
E Mail report to T. Frye (TJF)
E-Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tract '79 System (IPAS)
E Mail report to Document Controi Desk (DOCDESK)
bec to DCD (IE01)
bec distrib, by RIV:
Regional Administrator
Resident inspecter
DRP Director
DRS-PSB
Branch Chief (DRP/B)
MIS System
Project Enginee: ;DRP/B)
RIV File
Branch Chief (DRP/TSS)
.
DOCUMENT NAME: R:\\_CW\\CW715RP.DGP
To receive cop?gof document, indicate in boxFC" = Copy without enclosures *E' = Copy with enclosures *N' = No copy
_R V: SRI () /f
C:DRP/B Q
D:DRP
A/
l
l
'
,
DGPasseth L/
WDJohrf6n
TPGwyntig /!?
09/15/97
09/l&97
09M97 //
"-~DFFICIAL RECORD CO?Y
l
l
l.___-__
- - _ - _ . _ _ _ _ _ - _ _ -
_ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ ._ .-