ML20217B388

From kanterella
Jump to navigation Jump to search
Discusses Mod 3 to Statement of Work for Task Order 8 Under Contract NRC-02-95-002.Task Order 8 in Place to Assist in High Priority Need for Technical Assistance for Evaluation of Financial Strength for Us Enrichment Corp
ML20217B388
Person / Time
Issue date: 03/19/1998
From: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Surmeier J
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
CON-NRC-02-95-002, CON-NRC-2-95-2 NUDOCS 9803260055
Download: ML20217B388 (2)


Text

l March 19, 1998 MEMORANDUM TO: John J. Surmeier, Acting Chief Resource Management Branch Program Management, Policy Development and Analysis Staff, NMSS FROM:

Robert C. Pierson, Chief Special Projects Branch i

Division of Fuel Cycle Safety and Safeguards, NMSS

SUBJECT:

MODIFICATION NO. 3 TO STATEMENT OF WORK FOR TASK ORDER NO. 8 UNDER CONTRACT NO. 02-95-002 Task order number 8 under contract number 02-95-002 is in place to assist in a high priority need for technical assistance for evaluation of the financial strength and credit-worthiness of potential bidders for the United States Enrichment Corporation. The proposed modification number 3 to the Statement of Work for this task order is attached. The purpose of this modification is to modify Subtask B and to add an authorization for travel other than locally by the contractor under section number 9.0. The issuance of these modifications would not amend any other terms and conditions of the task order. Because of the urgent and high priority need of this l

modification, your expedited action on this request would be appreciated.

Attachment:

As stated D STRIBUTION:

IB D M e O hler Q PUBLIC Region IV NMSS r/f f

FCSS r/f FCLB r/f PKinney T.ubck

'G:\\02-95-00.kjh]

OFC FSPB b

FSPS I

FE8 hson NAME.

KHardin:ij

(

n R

DATE 3898 3N98 3h/98 g

.iby f Y C -l c

Mais m

,p 9803260055 980319 PDR CONTR NRC-02-95-002 PDR 9 g.g L

cape ^

N SE M $$Pl

I

! e y

/,

o l

J MODIFICATION NO. 3 TO STATEMENT OF WORK FOR TASK ORDER NO. 8 UNDER CONTRACT NO. 02-95-002 l

The Statement of Work is modified according to the following:

Section 6.0. Scope of Work l

Subtask B: The contractor will evaluate the financial strength and credit-worthiness of potential successor organizations to USEC if commercial bond ratings are not available or if the organizations do not qualify for an investment grade commercial rating. The l

contractor will review the bid packages in order to provide technical assistance to l

staff for all potential successor organizations to USEC. The staff anticipates the l

actual evaluations for financial strength and credit-worthiness, if needed, will be performed in a very shua period o. time (two weeks or less), and that from 1 to 3 l

entities will require evaluation. These evaluations should encompass assessments of business risk, competitive position, financial risk and financial flexibility, primarily through application of standard techniques for assessment of credit-worthiness as i

applied in determination of bond ratings by investment banking organizations.

The evaluations performed by the contractor should make use of information and I

data produced as a result of the financial analysis that will be performed by J.P.

l Morgan, on behalf of the U.S. Treasury and USEC, in connection with similar findings that are required to be made by those parties in connection with privatization approval, and submitted to NRC in support of certificate issuance.

j The contractor will review and evaluate the financial criteria to be developed and l

used by Standard and Poor's in evaluating an investment credit rating for a comoany in its infancy and determine that it is comparable to the NRC Standard Review Plan criteria.

Section 9.0. Meetings and Travel i

j lt is expected that there will be as many as twelve meetings between the contractor and NRC staff. This should be readily accomodated because of the proximity of the l

contractor's office and NRC offices in Rockville, Maryland.