Forwards Insp Rept 50-333/90-09 on 901223-910214.Violations Noted Being Considered for Escalated Enforcement Action
ML20217B256
Person / Time
Site: FitzPatrick 
Issue date: 03/01/1991
From: Hehl C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Fernandez W
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML20217B262 List:
References
EA-91-029, EA-91-29, NUDOCS 9103120048
Download: ML20217B256 (3)


See also: IR 05000333/1990009

Text

71-( )

,

('

p

i

EA No.91-029

t/.AP 01 1991

Docket No. 50-333

New York Power Authority

James A. FitzPatrick Nucicar Power Plant

A'ITN: Mr. William Fernandez

Resident Manager

Post Office Box 41

1.ycoming, New York 13093

Subject: NRC Region 1 Inspection Report No. 50 333/90 09

This letter transmits the results of the routine inspection conducted by Messrs. W. Schmidt and

R. Plasse of this office on December 23,1990 through February 14, 1991, at your James A.

FitzPatrick Nuclear Power Plant. Mr. J. Linville, of my staff, attended the exit meeting on

February 14,1991, when Mr. Schmidt discussed the inspection findings with Mr. R. l.iseno and

other members of your staff.

This inspection identified six apparent violations during review of the circumstances surrounding

the inoperability of the technical specification required torus bulk temperature instrumentation.

Further, three apparent violations were identified during review of technical specification

required electrical fire barrier penetration non conformances. These issues are being considered

for escalated enforcement action in accordance with the " General Statement of Policy and

Procedure for NRC Enforcement Action" (Enforcement Policy),10 CFR Part 2. Appendix C.

In both cases there appeared to be failure to follow written procedures, and an inability of site

management, including Quality Assurance, to review for root causes and identify needed

corrective actions. Accordingly, no Notices of Violation are being issued at this time for these

inspection findings. In addition, please be advised that the number and characterization of

apparent violations described in the enclosed inspection report may change as a result of further

NRC review.

We desire to conduct an enforcement conference in the Region 1 office to discuss these apparent

violations with you. The purposes of this conference are to discuss the apparent vie!ations, their

causes and safety significance; to provide you the opportunity to point out any errors in our

inspection report; to provide an opportunity for you to present proposed corrective actions; and

to discuss any information that will help us determine any appropriate enforcement action in

accordance with the Enforcement Policy. You will be advised by separate correspondence of the

results of our deliberations on this matter. No response regarding these apparent violations is

required at this time. We will be in contact with you to establish a mutually agreeable date for

this enforcement conference.

OFFICIAL RECORD COPY

a:IR90 09.FTZ

1

9103120048 910301

gDR

ADOCK 05000333

l

(

, _

PDR

_

.

!.

'

.

New York Power Authority

2

We appreciate your cooperation.

Sincerely,

' ejal r W

harles W. Hehl, Director

Division of Reactor Projects

Enclosure: NRC Region I Inspection Report No. 50-333/90-09

cc w/ encl:

J. Bayne, President

J. Brons, Executive Vice President Nuclear Generation

R. Beedle, Vice President - Nuclear Support

S. Zulla, Vice President - Nuclear Engineering

W. Josiger, Vice President - Nuclear Operations and Maintenance

J. Gray, Director, Nuclear Licensing BWR

A. Klausmenn, Senior Vice President - Appraisal and Compliance Services

G. Tasick, Quality Assurance Superintendent

G. Wilverding, Manager - Nuclear Safety Evaluation

G. Goldstein, Assistant General Counsel

Department of Public Service, State of New York

State of New York, Department of Law

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIL)

NRC Resident inspector

State of New York

OFFICIAL RECORD COPY

a:lR90-09.FTZ

_ _

_

._

_ _ _ _

_ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _

__

_ . . _

.__.

. . . . .

.

.

New York Power Authority

3

bec w/ enc 1:

J. Goldberg, OGC

J. Partlow, NRR

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o encl)

T, Martin, RA

W. Kane, DRA

W. Hehl, DRP

J. Wiggins, DRP

J. Linville, DRP

G. Meyer, DRP

D. Vito, DRP

D. Holody, EO

J. Joyner, DRSS

K. Abraham, PAO

- M. Miller, SLO

J Lieberman, OE

R. Capra, NRR

D. LaBarge, NRR

K. Brockman, EDO

bec w/ Letter and Executive Summary Only:

W. Hodges, DRS

J. Durr, DRS

.L. Bettenhausen, DR'

M. Knapp, DRSS

W. Cook, SRI - Nine Mile Point

L. Rossbach, SRI - Indian Point 3

-

INfF

RI:DRP

)RP

'

WSchmidt/mjd

GMeyer{

ILinville

Hehl

2fJ691

2/E/91

2/h91

}///91

'

,

OFFICIAL RECORD COPY

'

a:lR90-09.FTZ

.

.

. . .