ML20217A832
| ML20217A832 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 03/19/1998 |
| From: | Gundrum L NRC (Affiliation Not Assigned) |
| To: | Grigg R WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20217A838 | List: |
| References | |
| TAC-MA0366, TAC-MA0367, TAC-MA366, TAC-MA367, NUDOCS 9803250270 | |
| Download: ML20217A832 (2) | |
Text
.
Mr. Rich!rd R. Grigg March 19, 1998 Chtf Nucle r Officer Wisconsin Electric Power Company 231 West Michigan Street, Room P379 Milwaukee, WI 53201
SUBJECT:
POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 - CHANGES TO THE QUALITY ASSURANCE PROGRAM DESCRIPTION (TAC NOS. MA0366 AND MA0367)
Dear Mr. Grigg:
In a letter dated February 6,1998, (which superseded an earlier submittal dated December 16, 1997), the Wisconsin Electric Power Company submitted proposed changes to the Point Beach i
Nuclear Plant (PBNP) Final Safety Analysis Report Section 1.8 which will impact commitments made in the PBNP Quality Assurance (QA) Program Description. The changes concern approval authority for procedures, interviewing authority for prospective plant personnel, and f
reassignment of the responsibilities for maintaining the Q-List (the list of QA-scope plant equipment) from the QA organization to the line organization. The NRC staff has reviewed the proposed changes and determined that the reductions in commitment continue to comply with the criteria of Appendix B to 10 CFR Part 50. The enclosed safety evaluation provides our assessment of the requested changes.
Sincerely, ORIGINAL SIGNED BY Linda L. Gundrum, Project Manager Project Directorate lil-1 Division of Reactor Projects - Ill/IV Office of Nuclear Reactor Regulation Docket Nos. 50-266 and 50-301
Enclosure:
Safety Evaluation cc w/ encl: See next page DISTRIBUTION:
j Docket File (50-266,50-301):
q PUBLIC 3
PDill-1 Reading E. Adensam (EGA1)
\\
J. McCormick-Barger, Rlli SEDB (TLH3)
DOCUMENT NAME: G:\\WPDOCS\\PTBEACH\\PTBA0366.LTR
- No substantial changes to SE TP rece4ve a copy of th6s document, Indicate in the box 'C" a CM wimout 46...:!.,.A,sure T
- Copy wem attachment / enclosure "N" a No copy OFFICE PM:PD31 lE LA:PD31 lE BC:HOMB l
D:PD31 6
NAME LGundrum: M J/
CJamerson G-/ SCBlack*
CACarpenteM DATE 3/ 19 /9'8' 3/ 69 /98[]
SE 3/18/98 3/ M i9f OFFICIAL RECORD COPY 9003250270 980319 PDR ADOCK 05000266 P
PDR L.@ h Q Q O M [h hr.
l Mr. Richard R. Grigg Point Beach Nuclear Plant Wisconsin Electric Power Company Unit Nos.1 and 2 cc:
Ernest L. Blake, Jr.
l Shaw, Pittman, Potts & Trowbridge l
2300 N Street, N.W.
4 l
Washington, DC 20037 l
Mr. Scott A. Patuiski Vice President l
Point Beach Nuclear Plant l
Wisconsin Electric Power Company i
6610 Nuclear Road l
Two Rivers, Wisconsin 54241 Mr. Ken Duveneck l
Town Chairman Town of Two Creeks l
13017 State Highway 42 Mishicot, Wisconsin 54228 l
Chairman Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 l
Regional Administrator, Region 111 l
U.S. Nuclear Regulatory Commission l
801 Warrenville Road Lisle, Illinois 60532-4351 Resident inspector's Office l
U.S. Nuclear Regulatory Commission 6612 Nuclear Road Two Rivers, Wisconsin 54241 Ms. Sarah Jenkins Electric Division Public Service Commission of Wisconsin P.O. Box 7854 Madison, Wisconsin 53707-7854 March 1997