ML20217A612

From kanterella
Jump to navigation Jump to search
Provides Confirmation of Corrective Actions Implemented at Braidwood Station in Response to GL 93-04, Rod Control Sys Failure & Withdrawal of Rod Cluster Control Assemblies
ML20217A612
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 03/11/1998
From: Tulon T
COMMONWEALTH EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-93-04, GL-93-4, NUDOCS 9803250139
Download: ML20217A612 (2)


Text

Commonwealth Illimo O>mpany Ilraidwmw.! Generating Station Route o f, llox Hi litacculle, IL MH073X319 Tel H154M2801 March 11,1998 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington. D. C. 20555 - 0001

Subject:

Generic Letter 93-04 Close-Out Actions Braidwood Nuclear Power Station, Units 1 and 2 Facility Operating Licenses NPF-72 and NPF-77 NRC Docket Numbers: 50-456 and 50-457

Reference:

C.Y. Shiraki (US Nuclear Regulatory Commission) to D. L. Farrar (Commonwealth Edison) letter dated January 27,1995.

)

The purpose of this letter is to provide confirmation of the corrective actions implemented at Braidwood Station in response to Generic Letter 93-04, " Rod Control

)

System Failure and Withdrawal of Rod Cluster Control Assemblies." The referenced letter approved the proposed corrective actions of implementing a current order timing modification and a new current order surveillance test recommended by the Westinghouse Owners Group.

These corrective actions were completed during Braidwood Unit 1 outage AIRO5 (Fall 1995) and Braidwood Unit 2 outage A2RO5 (Spring 1996). This completes the actions and reporting requirements for Generic Letter 93-04.

Please address any comments or questions regarding this matter to Richard L.

Scliessmann, at (815)458-2801 extension 2038.

Sincerely,

/,.

r T

hy J. Tulon

/%30 Vice President Braidwood Nuclear Generating Station j

i i

9803250139 980311 PDR ADOCK 05000456 PDR p

4 A UllicOnt Company

,._ y Document Control Desk March 11,1998 Page 2 cc:

A. B. Beach, Regional Administrator - RIII S. N. Bailey, Braidwood Project Manager - NRR C. J. Phillips, Senior Resident Inspector - Braidwood Office of Nuclear Facility Safety-IDNS 0:\\nrc.. 98020tjt. doc 2

f '-

b