W$LF CREEK NUCLEAR OPERATING CORPORATION John A sesey Vene Petektent Nuotset opeestions November 14,1990 NO 90-0286 r
U. S. Nuclear Regulatory Conmission ATTN: Document Control Desk Mail Station Pl.137 Washington, D. C.
20555 d
Subject:
Docket No. 50-482:
October, 1990. Monthly Operating Report 1
Gentlemen:
Attached is the October, 1990 Monthly Operating Report for Wolf Oreek Generating Station.
This submittal is being made in accordance witl4 the requirements of To:hnical Specification 6.9.1.8, Very truly yours, i
6 Johet A. Bailey Vice President Nuclear Operations j
JAB /jra Attachment cci A. T. Howell (NRC), w/a R. D. Martin (NRC), w/a D. V. Pickett (NRC), w/a M. E. Skow (NRC), w/a I
,[lih 1.1 c, j a
~'>
,, 3 c, n [ nX >
,,<,,gg
)
h
' ', " [
RO, Box 411/ Burtington, KS 66639 / Phone: (316) 364-8831 l$ )
[
An eauw owu.y Empeor-u r+ecvet
(
~%
Attachment to NO 90-0286 i
i
.c i
NOLF CREEK MELEAR OPERATDG CXRPCRATICE 1
NCLF CREEK GENERATDG STATICN l
K NIHLY OPERATING REPORT MONIN:
October YEAR:.1990 Docket No.: 50-482 Facility Operating License No.: NPF-42 Report No.,_,f.9,_
P b
W by:
('
l Herlin G. Williams l
l' I
r
Attachment to NO 90-0286 StNMARY
'Ihe following report highlights tho operating expa-lence of Wolf Cmek Generating Staticn for the month of October,1990. 'Ais report is being provided pursuant to 'he.hnical Specificaticn 6.9.1.8.
I.
St) MARY OF OPERATI!G EXPERIEtCE
'Ihe unit operated at or near 100% power throughout the ironth of October.
II. MAXR SAFEIT RE2ATED MAINTENA!CE JCTIVITIES 1.
Repair of Turbine Driven Auxiliary Feedwater Punp signal conduit.
2.
Repair of Diesel Generator Roam *B" supply fan danper.
i l
i I
l l
l l
l Wolf Creek Generating Station Monthly Operating Report October 1990 Page 1 of 5
Attachment to NO 90-0286 OPERATIN3 DMA REPORT DOCKET 10.
50-482 WOLF CREEK GENERATI!G STATIN l
WOLF CREEK NUCLEAR OPERATL*3 CmPTATIN l
D M 'E 11-01-90 CCMPLETED BY M. Williams 4
'IELEPtKNE 316-364-8831 OPERATI!G STARIS 1.
Reporting Periods-CX:trhr. 1990 Gross Hours in Reporting Period: 745 2.
Currently Authorized Power Invel()Mt):_,3111 Max. Depend. Capacity (l@e-Net):_"A 4 Design Electrical Rating ()Me-Net):
1170
- 3.. Power Isvel to Which Restricted (If Any)(MNe-Net):
N/A l
4.
Retsons for restriction (If Any):
N/A
'Ihis Month Yr. to Date Cunulative 5.
Number of Iburs Heactor was Critical 745.0 5,632.1 35,931.5 i-6.
Reactor Reserve Shutdown Hours 0.0 0.0 339.8 7.
Hours Generator on Line 745.0 5,572.7 35,359.8 8.
Unit Reserve Shutdown Hours 0.0 0.0 0.0 9.
Gross '1hermal Energy Generated (MHH) 2,533,710 18,635,330 117,112,585 L
10.' Gross Electrical Energy Generated (MNH) 892,753-6,490,677 40,769.624 1
l
- 11. Net Electrical Energy Generated (MHH) 856,996 6,198,980 38,921,351
- 12. Reactor Service Factor 100.0 77.2 79.4
- 13. Reactor Availability Factor 100.0 77.2 80.2
- 14. Unit Service Factor 100.0 76.4 78.2
- 15. Unit Availability Factor 100.0 76.4 78.2
'16.
Unit Capacity Factor (Using MDC) 101.4 74.9 76.1
-l
- 17. Unit Capacity Factor (Using Design NNe) 98.3 72.6 73.5
- 18. Unit Forced Outage Rate 0.0 2.1 4.2
- 19. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of each): N/A i
- 20. If Shut Down at End of Report hiod, Estinated Date of Startup:
N/A i
Wolf Creek Generating Station Ibnthly Operating Report October 1990 4
Page 2 of 5 i
Attactnent to NO 90-0286 AVERME IRILY LEIT POWER LEVEL DOCKET 10.
50-482 WOLF CREEK GENIRATDG S"ATION WOLF CREEK NUCLEAR OPERATIIG OCRPCRATICN IATE 11-01-90 OCMPLETED BY M. Will4==
TELEPHCNE 316-364-3321 McN1H October, 1990 IRY AVERAGE IAILY POWER IE/EL IAY AVERAGE IRILY POWI!R LEVEL
( h Net)
( h Net) 1 1149 17 1152 2
1148 18 1152 3
1148 19 1153 4
1A19 20 1153 5>
1148 21 1154 6
1149 22 1149 7
1150 23 1149 8
1152 24 1151 9
1151 25 1239 10 1150 26 1153 11' 1152 27 1152
'12' 1146 28 1152*
13 1153 29 1152 14 1153 30 1151 15 1152 31 1151 16 1147
- Mjusted for time change Wolf Creek Generating Station Monthly Operating Re[ ort October 1990 i
Page 3 of 5
a Attachment to NO 90-0286 l
UNIT SHUTDOWN AND POWER REDUCTIONS DOCKET NO.
50-482 WOLF CREEK GENERATING SIATION WOLF CREEK NUCLEAR OPERATING CORPORATION DATE 11-01-90 COMPLETED BT M. Williams REPORT MONTH October. 1990 TELEPHONE 316-364-8831 TYPE METHODS SHUTTING F: FORCED DURATION REASON DOWN THE REACTOR CORRECTIVE ACTIONS /CO!9fENTS No Date S: SCHEDULED (HOURS)
(1)
OR FIDUCING POWER (2)
SEEGEARY: The unit operated at or near 100Z power throughout the month.
- 1) REASON: A: EQUIPMENT FAILURE (EXPLAIN) E: OPERATOR TRAINING AND LICENSE EXAMINATION (2) METHOD:
1.
MANUAL B: MAINTENANCE OR TEST F: ADMINISTRATIVE 2.
MANUAL SCRAM C: REFUELING G: OPERATIONAL ERROR (*XPLAIN) 3.
AUTOMATIC SCRAM D: REGULATORY RESTRICTION B: OTHER (EKPLAIN) 4.
CONTINUED 5.
REDUCED LOAD 9.
OTHER Wolf Creek Generr. ting Statie Monthly Opere+'ag Report October 1999 Page 4 of 5
1 Attachm:nt to NO 90-0286 i
WOLF CREEK NUCLEAR NERATI!G OCRPWATIW WOLF CREEK GDERATI!G S'IATIN INIT NO. 1 MONIH October. 1990 SLMMARY OF OPERATIIG EXPERIENCE Iloted below in chronological squence is a sunmary of operating experiences for this nonth which requLred load reduction or resulted in significant non-load related incidents.
2 25 ZUS EVDff October 1,1990 0000 hours0 days <br />0 hours <br />0 weeks <br />0 months <br /> tlnit at 100% power.
' Octcar 3), 1990 2400 hours0.0278 days <br />0.667 hours <br />0.00397 weeks <br />9.132e-4 months <br /> thit at 100% power.
r 5 t.
ll L
i
. i.
't l'
l Nbif Creek Generatire Station Monthly Operating Repurt Oc h 1990 Page 5 of 5 1: