ML20217A565
| ML20217A565 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 03/18/1998 |
| From: | Warren C WOLF CREEK NUCLEAR OPERATING CORP. |
| To: | NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES) |
| References | |
| WO-98-0027, WO-98-27, NUDOCS 9803250121 | |
| Download: ML20217A565 (3) | |
Text
.
4
~
Wt$LF CREEK NUCLEAR OPERATING CORPORATION Clay C. Warren Vice President & Chief Operating Officer March 18, 1998 WO 98-0027 REIRS Project Manager Office of Nuclear Regulatory Research U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
Docket No. 50-482: Annual Exposure Report (1997)
Gentlemen:
Enclosed is a disk containing the Wolf Creek Generating Station (WCGS) Form 5 Exposure Report, covering the period from January 1, 1997, to December 31, 1997.
This report is being submitted in accordance with 10 CFR 20.2206 (c).
A separate transmittal form is being submitted with the disk in accordance with the requirements outlined in Regulatory Guide 8.7,
" Instructions for Recording and Reporting Occupational Radiation Exposure Data," Appendix A.
Also enclosed, per the request of the Radiation Exposure Information Reporting System (REIRS) Project Manager, is a copy of the 1997 Annual Exposure Report for WCGS by work group.
If you have any questions concerning this matter, please contact me at (316) 364-8821, extension 4485, or Mr. Michael J. Angus at extension 4077.
Very truly you s,
/
Cla C. Warren CCW/jad Enclosures ec:
W. D. Johnson (NRC), w/o enclosures E. W. Merschoff (NRC), w/o enclosures 1
J. F. Ringwald (NRC), w/o enclosures j
K. M. Thomas (NRC), w/o enclosures
{
Document Control Desk (NRC), w/o enclosures l
i 9803250121 980318 j
I P O. Box 411/ Burhngton, KS 66839 / Phone: (316) 364 8831 An Equal Opportunty Empsover MSMCNET J
i
~
Enclosure I to WO 98-0027.
1997 Form 5 Exposure Report File Name:
97 forms.txt Date Created:
March 16, 1998 Operating'. System:
MS-Dos (R) Version 6.2 f
Contact:
Jim Harris Telephone:
(316) 364-8831 ext. 4840 Other instructions:
File consists of a header record followed by the Form 5 information for each individual who was monitore at Wo1 f Creek in 1997.
Signature and Date:
0 n
]
e --
I Enclosurd 11 to WO 98-0027 j
i
=.
WOLF CREEK NUCLEAR OPERATING CORPORATION - WCGS i
PO BOX 411 BURLINGTON, KANSAS 66839 j
a LICENSE: NPF-42 REGULATORY GUIDE 1.16 INFORMATION' INTERIM REPORT FOR:
970101 TO 971231 PERSONNEL ( > 100 mrem )
TOTAL MAN-REM j
WORK AND JOB FUNCTION STATION UTILITY CONTRACT STATION UTILITY CONTRACT REACTOR OPERATIONS AND SURVEILLANCE MAINTENANCE AND CONSTRUCTION 1
0 4
0.821 0.000 1.855 OPERATIONS 28 0
0 9.782 0.233 0.121 HEALTH PHYSICS AND LAB 13 0
57 5.482 0.032 22.380 SUPERVISORY AND OFFICE STAFF 14 0
6 4.126 0.000 2.226 ENGINEERING STAFF 10 0
3 3.199 0.079 0.592 ROUTINE PLANT MAINTENANCE MAINTENANCE AND CONSTRUCTION 18 0
27 6.698 0.000 13.857 OPERATIONS 2
0 0
0.778 0.001 0.023 HEALTH PHYSICS AND LAB 1
0 1
0.834 0.014 0.399 SUPERVISORY AND OFFICE STAFF 6
0 0
2.495 0.002 0.377 ENGINEERING STAFF 0
0 2
0.754 0.185 0.906 MAINTENANCE AND CONSTRUCTION 14 0
54 5.586 0.000 18.942 l
INSERVICE INSPECTION OPERATIONS 0
0 3
0.358 0.002 0.758 HEALTH PHYSICS AND LAB 4
0 23 1.654 0.000 8.078 SUPERVISORY AND OFFICE STAFF 6
0 7
2.303 0.000 2.519 ENGINEERING STAFF 0
0 53 0.418 0.062 18.401
{
SPECIAL PLANT MAINTENANCE MAINTENANCE AND CONSTRUCTION 28 0
134 10.076 0.000 50.192 i
OPERATIONS 0
0 0
0.132 0.000 0.004
)
HEALTH PHYSICS AND LAB 6
0 5
2.632 0.000 1.977 SUPERVISORY AND OFFICE STAFF 6
0 7
3.174 0.000 2.070 ENGINEERING STAFF 1
1 34 0.859 0.222 11.133
(
WASTE PROCESSING
!%INTENANCE AND CONSTRUCTION 4
0 0
1.298 0.000 0.281 i
OPERATIONS 1
0 2
0.437 0.000 0.6C2 HEALTH PHYSICS AND LAB 13 0
30 4.694 0.004 9.571 SUPERVISORY AND OFFICE STAFF 1
0 1
0.279 0.000 0.310 ENGINEERING STAFF 0
0 0
0.023 0.000 0.021 REFUELING MAINTENANCE AND CONSTRUCTION 9
0 26 2.883 0.000 8.746 OPERATIONS 3
0 0
0.560 0.000 0.000 HEALTH PHYSICS AND LAB 1
0 2
0.742 0.000 1.595 SUPERVISORY AND OFFICE STAFF 5
0 0
1.263 0.000 0.397 ENGINEERING STAFF 2
0 38 0.666 0.000 10.648
. TOTALS MAINTENANCE I.ND CONSTRUCTION 74 0
245 27.362 0.000 93.873 OPERATIONS 34 0
5 12.047 0.241 1.507 HEALTH PHYSICS AND LAB 38 0
110 16.038 0.050 44.000 l
SUPERVISORY AND OFFICE STAFF
-38 0
21 13.642 0.002 7.900 ENGINEERING STAFF 13 1
130 5.919 0.548 41.700 GRAND TOTALS 197 1
519 75.008 0.841 188 980 Number of personnel > 100 mrem based on PIC data Total man-rem based on ratio of PIC data applied to TLD data Actual total :aRem = 264896 (numbers may vary due to rounding)
-