Text

,

' )

Alabama Power Company 40 inverness Center Parkway

  • Post Office Dox 1295

-t Birmingham, Alabama 35201 Telephone 205 868 5581 W. G. Hairston, til Senior Wee President AlabamaPower Nuclear Operations NA-90-5638

    • S N ' * " * c 8 * 'n November 14, 1990 Docket No. 50-364 U. S. Nuclear Regulatory Commission ATTW: Document Control Desk Vashington, D.

C.-

20555 Joseph H..Farley Nuclear Plant Unit 2 Honthly Operating Data Report Attached is the October 1990 Honthly-Operating Report for Joseph H. Farley Nuclear Plant Unit 2, as required by Section 6.9.1.10 of the Technical Specifications.

If you have any questions, please advise.

Respectfully submitted, r

kn

i. Ha rston, III-JARiedb3014 Attachments

-cc Mr.-S. D. Ebneter Hr. S. T.-Hoffman Mr. G. F; Haxwell

nn pg awc eDc g

II

i.

JOSEIil M. FARlEY N1C1 JAR PI ANT UNIT 2 NARRATIVE SthttAin' OF OPIRATIONS Octoler, 1990 The unit was shutzlown at 0022 on Oct.oler 13 for the cycle 7 - 8 refueling outage. There were no other unit shutelowns or significant power ruiuotions during the month of Octoler.

The following major safety-relatexl naintenance was perfonwxt in the mont.h of Outolor:

1. The reactor was defuelal and viaual inspect.lon of. the reactor vessel was complet ext. Visual inspections arnl ultrasonic inslect.lons of the fuel were compl e tal. One leaking fuel rod was detected in a fuel assembly 1. hat. was not denigrutted for reload arxl one defect was discovered on a fuel rod in an assembly that. was designatal for reload. This assembly will not le reloaded.
2. Prevent.ive naintenance was completal on both control rul drive nochanism motor-generator sets.
3. The congonent cooling water heat exchanger 2C service water outlet isolation valve was replaced.
4. The controller on t.he train A service water minimum flow valve was replacul.
5. The relay in the 125V DC distribution innel 2A was replaced.

1 OPERATING DATA REPORT i

DOCKET No. 50-364 DATE November 5, 1990 COMPLETED BY D. N. Morey TB*gPHONE (205)899-5156 l

u OPERATING STATUS

, Notes

1. Unit Names Joseph M. Farley - Unit 2
1) Cumulative data since
2. Reporting Period:

October 1990 7-30-81, date of i

3. Licensed Thermal Power (MWt):

2,652 comercial operation.

4. Nameplate Rating (Gross MWe):

860

5. M sign Electrical Rating (Net MWe):

829

'tximum Dependable capacity (Gross MWe):

868.6 6.

7. h ximum Dependable Capacity (Net MWe):

828.2

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Paport, Give Reasons: N/A
9. Power Level To Which Restricted, If Any (Net tNe):

N/A

10. Reasons For Restrictions, If Any:

N/A

'Ihis Month Yr-to-Date Cumlative

-11. Hours In Reporting Period 745 7,296 81,145

12. Number Of Hours Reactor Was Critical 293.7 6,501.1 70,384.2 13.' Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 288.4 6,479.2 69,551.2
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
16. Gross Thermal Energy Generated (MWH) 755,300 16,947,682 177,203,949
17. Gross Electrical Energy Generated (MWH) 244,856 5,539,296 58,205,838 i
18. Net Electrical Energy Generated (MWH) 229,504 5,263,848 55,207,238
19. Unit Service Factor 38.7 88.8 85.7
20. Unit Availability Factor 38.7 88.8 85.7
21. Unit Capacity Factor (Ur,ing MDC Net) 37.2 87.1 83.1
22. Unit Capacity Factor (Using DER Net) 37.2 87.0 82.1
23. Unit Forced Outage Rate 0.0 1.4 4.2
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A i

l.

25. If Shut Down At End Of Report Period, Estimated Date of Startup: December 25, 1990 j.
26. Units In Test Status (Prior to Comercial Operation):

Forecast Achieved

-i f.

INITIAL CRITICALITY 05/06/81 05/08/81 l

INITIAL ELECTRICITY D5/24/81 05/25/81 l'

00B9EERCIAL OPERATION 08/01/81 07/30/81 i

l Form 2/30.

l l

l.

- >

  • y DOCKET NO.

50-364 UNIT 2

DATE November 5,1990 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 MONnl Ibvember DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL

(!We-Net)

(MWe-Net) 1-824 17 0

2 820 18 0

3 816 19 0

4 817 20 0

5 827 21 0

6 822-22 0

7 819 23 0

8 819 24 0

9 820 25 0

10-823 26 0

11 826 27 0

12 678 28-0 13 0

29 0

14

'O 30 0

15 0

31 0

16 0-INSTRUCTIONS On this format, list the average daily unit power level in IMe-Net for each day in the reporting month. Compute to the nearest whole megawr.tt.

Form 13/21

5:

-(151T SEUTDOWBS AND POWER. REDUCTIONS _

DOCKET N0.

'50-384 UNIT NAME J. M. FARLEY a UNIT 2 h

~

DATE November S, 1990 COMPLETED BT-D. W. NORET

~

. REPORT MONTM OCTOBE;t TELEPHOWE (205)S99-5156 l

l l

l l

'l METHOD OF;'

l LICENSEE l l

l CAUSE & CORRECTIVE l

I i'

I i wnATres !

l SnuTr2=c -

1 Evr=T

-I SYSren 1 coarostar-1 ACTzon To -

1 lNO.

'l DATE' l TYPE l_(HOURS)

.l REASOS l DOWN REACTOR '.l REPORT 4 l CODE l' CODE j.

PREVENT RECURRENCE l

l004 l 901013 l

5 l.456.6

.]

-C l

l' l N/A l W/A '

l' N/A' l Unit was taken off line for the cycle 7-8 l

l i

i 1

l-1.

l I

I I ref.lin,outase.

I l'

I I

I I

l' I

I I

i i

i 1

l l

I l'

l.

I I

I I

I i

1 1

I l

l 1

1 I

I I

- 'I

'l

.I I

l i

I I

I I

1 1

I 1

1 1

I I

I I

I I

I I

I l

1 1

I I

I I

I I

I I

i 1.

I I

I I

I I

I I

I I

I I

I I

I i

i l

i 1.

I I

I I

I I

I i

1 1

-l I

I I

I I

I I

I I

I I

I I

I I

I I

I 1

1 I

I I

l-1 I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I l-1 I

I I

I I

I I

I I

I I

I I

I I

I I

i 1

1 I

I I

i 1

1 I

l 1

1 I

I I

I I

I I

I I

I I

I I

i i

I 1

l' 1

I I

I I

l i

I I

I I

I I

I I

I I

I F: Forced Reason:

Method:

b ibit G-Instructions S: Scheduled A-Equipment Failure (Explain)

.1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram.

Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training & License Examination F-Administrative Exhibit I -Same Source G-Operational Error- (Explain)

H-Other (Explain).

M Rxm M N

~