Alabama Power Company 40 inverness Center Parkway
- Post Office Dox 1295
-t Birmingham, Alabama 35201 Telephone 205 868 5581 W. G. Hairston, til Senior Wee President AlabamaPower Nuclear Operations NA-90-5638
- S N ' * " * c 8 * 'n November 14, 1990 Docket No. 50-364 U. S. Nuclear Regulatory Commission ATTW: Document Control Desk Vashington, D.
C.-
20555 Joseph H..Farley Nuclear Plant Unit 2 Honthly Operating Data Report Attached is the October 1990 Honthly-Operating Report for Joseph H. Farley Nuclear Plant Unit 2, as required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted, r
kn
- i. Ha rston, III-JARiedb3014 Attachments
-cc Mr.-S. D. Ebneter Hr. S. T.-Hoffman Mr. G. F; Haxwell
- nn pg awc eDc g
II
i.
JOSEIil M. FARlEY N1C1 JAR PI ANT UNIT 2 NARRATIVE SthttAin' OF OPIRATIONS Octoler, 1990 The unit was shutzlown at 0022 on Oct.oler 13 for the cycle 7 - 8 refueling outage. There were no other unit shutelowns or significant power ruiuotions during the month of Octoler.
The following major safety-relatexl naintenance was perfonwxt in the mont.h of Outolor:
- 1. The reactor was defuelal and viaual inspect.lon of. the reactor vessel was complet ext. Visual inspections arnl ultrasonic inslect.lons of the fuel were compl e tal. One leaking fuel rod was detected in a fuel assembly 1. hat. was not denigrutted for reload arxl one defect was discovered on a fuel rod in an assembly that. was designatal for reload. This assembly will not le reloaded.
- 2. Prevent.ive naintenance was completal on both control rul drive nochanism motor-generator sets.
- 3. The congonent cooling water heat exchanger 2C service water outlet isolation valve was replaced.
- 4. The controller on t.he train A service water minimum flow valve was replacul.
- 5. The relay in the 125V DC distribution innel 2A was replaced.
1 OPERATING DATA REPORT i
DOCKET No. 50-364 DATE November 5, 1990 COMPLETED BY D. N. Morey TB*gPHONE (205)899-5156 l
u OPERATING STATUS
, Notes
- 1. Unit Names Joseph M. Farley - Unit 2
- 1) Cumulative data since
- 2. Reporting Period:
October 1990 7-30-81, date of i
- 3. Licensed Thermal Power (MWt):
2,652 comercial operation.
- 4. Nameplate Rating (Gross MWe):
860
- 5. M sign Electrical Rating (Net MWe):
829
'tximum Dependable capacity (Gross MWe):
868.6 6.
- 7. h ximum Dependable Capacity (Net MWe):
828.2
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Paport, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net tNe):
N/A
- 10. Reasons For Restrictions, If Any:
N/A
'Ihis Month Yr-to-Date Cumlative
-11. Hours In Reporting Period 745 7,296 81,145
- 12. Number Of Hours Reactor Was Critical 293.7 6,501.1 70,384.2 13.' Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-Line 288.4 6,479.2 69,551.2
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 l
- 16. Gross Thermal Energy Generated (MWH) 755,300 16,947,682 177,203,949
- 17. Gross Electrical Energy Generated (MWH) 244,856 5,539,296 58,205,838 i
- 18. Net Electrical Energy Generated (MWH) 229,504 5,263,848 55,207,238
- 19. Unit Service Factor 38.7 88.8 85.7
- 20. Unit Availability Factor 38.7 88.8 85.7
- 21. Unit Capacity Factor (Ur,ing MDC Net) 37.2 87.1 83.1
- 22. Unit Capacity Factor (Using DER Net) 37.2 87.0 82.1
- 23. Unit Forced Outage Rate 0.0 1.4 4.2
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A i
l.
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: December 25, 1990 j.
- 26. Units In Test Status (Prior to Comercial Operation):
Forecast Achieved
-i f.
INITIAL CRITICALITY 05/06/81 05/08/81 l
INITIAL ELECTRICITY D5/24/81 05/25/81 l'
00B9EERCIAL OPERATION 08/01/81 07/30/81 i
l Form 2/30.
l l
l.
- >
- y DOCKET NO.
50-364 UNIT 2
DATE November 5,1990 COMPLETED BY D. N. Morey TELEPHONE (205)899-5156 MONnl Ibvember DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL
(!We-Net)
(MWe-Net) 1-824 17 0
2 820 18 0
3 816 19 0
4 817 20 0
5 827 21 0
6 822-22 0
7 819 23 0
8 819 24 0
9 820 25 0
10-823 26 0
11 826 27 0
12 678 28-0 13 0
29 0
14
'O 30 0
15 0
31 0
16 0-INSTRUCTIONS On this format, list the average daily unit power level in IMe-Net for each day in the reporting month. Compute to the nearest whole megawr.tt.
Form 13/21
5:
-(151T SEUTDOWBS AND POWER. REDUCTIONS _
DOCKET N0.
'50-384 UNIT NAME J. M. FARLEY a UNIT 2 h
~
DATE November S, 1990 COMPLETED BT-D. W. NORET
~
. REPORT MONTM OCTOBE;t TELEPHOWE (205)S99-5156 l
l l
l l
'l METHOD OF;'
l LICENSEE l l
l CAUSE & CORRECTIVE l
I i'
I i wnATres !
l SnuTr2=c -
1 Evr=T
-I SYSren 1 coarostar-1 ACTzon To -
1 lNO.
'l DATE' l TYPE l_(HOURS)
.l REASOS l DOWN REACTOR '.l REPORT 4 l CODE l' CODE j.
PREVENT RECURRENCE l
l004 l 901013 l
5 l.456.6
.]
-C l
l' l N/A l W/A '
l' N/A' l Unit was taken off line for the cycle 7-8 l
l i
i 1
l-1.
l I
I I ref.lin,outase.
I l'
I I
I I
l' I
I I
i i
i 1
l l
I l'
l.
I I
I I
I i
1 1
I l
l 1
1 I
I I
- 'I
'l
.I I
l i
I I
I I
1 1
I 1
1 1
I I
I I
I I
I I
I l
1 1
I I
I I
I I
I I
i 1.
I I
I I
I I
I I
I I
I I
I I
I i
i l
i 1.
I I
I I
I I
I i
1 1
-l I
I I
I I
I I
I I
I I
I I
I I
I I
I 1
1 I
I I
l-1 I
I I
I I
I I
I I
I I
I I
I I
I I
I I
I l-1 I
I I
I I
I I
I I
I I
I I
I I
I I
i 1
1 I
I I
i 1
1 I
l 1
1 I
I I
I I
I I
I I
I I
I I
i i
I 1
l' 1
I I
I I
l i
I I
I I
I I
I I
I I
I F: Forced Reason:
Method:
b ibit G-Instructions S: Scheduled A-Equipment Failure (Explain)
.1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3-Automatic Scram.
Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Examination F-Administrative Exhibit I -Same Source G-Operational Error- (Explain)
H-Other (Explain).
M Rxm M N
~