Informs That Commitment to Revise Engineering Repts GGNS-96-0006,rev 0 & GGNS-96-0032,rev 0 to Reflect Level of Detail Consistent W/Clarifications Contained in 961220 Submittal Was Completed on 980331 as Planned
ML20217A201
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/16/1998
From: Hughey W
ENTERGY OPERATIONS, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-92-08, GL-92-8, GNRO-98-00042, GNRO-98-42, NUDOCS 9804220193
Download: ML20217A201 (2)


Text

).

)

h O

Enti oper:tions,Inc.

Port Gbson, MS 39150 Tel 601437-6470 W.K.Hughey Deector N kw Sdety & Regdatory April 16, 1998 U.S. Nuclear Regulatory Commission Mail Station P1-37 Washington, D.C. 20555 Attention:

Document Control Desk

Subject:

Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Confirmation of Completed Licensing Commitment:

Generic Letter 92-08 GNRO-98/00042 Gentlemen:

By letter dated February 26,1997, the Staff forwarded a Request for Additional Information (RAl) to Grand Gulf Nuclear Station (GGNS) conceming the ampacity derating of electrical cables enclosed in Thermo-Lag clad raceway. This information was requested to facilitate the Staff's review of GGNS' resolution of Generic Letter 92-08. This RAI requested clarification of information contained in Engineering Reports GGNS-96-0006 Revision 0 and GGNS-96-0032 Revision 0 that were submitted by letter

.iated June 28,1996 and supplemented with information provided in our letter dated December 20,1996.

The requested clarifications were submitted by letter dated June 5,1997. In our June 5,1997 response, we also committed, at the Staff's request, to revise the above engineering reports to reflect a level of detail consistent with the clarifications contained in our December 20,1996 submittal with regards to ampacity derating for cables encased in U

., d s 2 C[

O l\\

l 9804220193 980416 PDR ADOCK 05000416 P

PDR G9804161

e' GNRO-98/00042 Page 2 of 2 Thermo-Lag Flexi-Blanket 330-860 material. These revisions were planned to be completed by March 31,1998. The appivpriate revisions to the above engineering

(

reports have been completed as scheduled. The reports will be available for future NRC audits and inspections.

Should you have any questions, please contact this affice.

Yours inJiy, MY WKH/RSJ/ams cc:

Ms. J. L. Dixon-Herrity, GGNS Senior Resident Mr. L. J. Smith (Wise Carter)

Mr. N. S. Reynolds Mr. H. L. Thomas Mr. E. W. Merschoff Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011 Mr. J. N. Donohew, Project Manager Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 13H3 Washington, D.C. 20555 l