ML20217A136

From kanterella
Jump to navigation Jump to search
Informs That Effective 980302,M Thadani Was Assigned Project Manager for Peach Bottom
ML20217A136
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/19/1998
From: Stolz J
NRC (Affiliation Not Assigned)
To: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 9803240270
Download: ML20217A136 (3)


Text

a.

March 19, 1998.

Mr.' Garrett D. Edwards Director-Licensing and Chairman, Nuclear Review Board PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk-P. O. Box No.195 Wayne, PA~ 19087-0195-

SUBJECT:

PERSONNEL ASSIGNMENT, PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3"

Dear Mr. Edwards:

' The purpose of this letter is to inform you that effective March 2,1998, Mr. Mohan Thadani was assigned Project Manager for Peach Bottom. Mr. Thadani can be reached on

.(301) 415-1476.-

1 Sincerely,

/S/

John F. Stolz, Director Project Directorate 1-2 s

Division of Reactor Projects - 1/II i

Office of Nuclear Reactor Regulation j

Docket Nos. 50-277 and -

i 50-278 cc: See next page DISTRIBUTION h

Docket File 1.

h}Y/

PUBLIC PD1-2 Reading OGC-ACRS CAnderson, RGN I M. Chaney

./

/

OFFICE PD PDS k O9/D NAME MNadani:mw hhdhe'n JS DATE I//i/98 h Mf/98 E) //Y/98 OFFICIAL RECORD COPY f - [ L.

DOCUMENT NAME: PBPMCHG.LTR dgi10 File CEPTEil COPY

.n 9903240270 990319 DR ADOCK 0500 7

a g

g ar

[

h UNITED STATES 3

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 20e8640H g..... /

'4 March 19, 1998 Mr. Garrett D. Edwards Director-Licensing and Chairman, Nuclear Review Board PECO Energy Company Nuclear Group Headquarters Correspondence Control Desk P. O. Box No.195 Wayne, PA 19087-0195

SUBJECT:

PERSONNEL ASSIGNMENT, PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3

Dear Mr. Edwards:

The purpose of this letter is to inform you that effective March 2,1998, Mr. Mohan Thadani was assigned Project Manager for Peach Bottom. Mr. Thadani can be reached on (301) 415-1476.

Sincerely,

/

J n F. Stolz, Director roject Directorate 1-2 Division of Reactor Projects -l/Il Office of Nuclear Reactor Regulation Docket Nos. 50-277 and 50-278 cc: See next page k.

f 1-f,.

' Mr. Garrett D. Edwards Peach Bottom Atomic Power Station, PECO Energy Company Units 2 and 3 cc:

)

J. W. Durham, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of.

PECO Energy Company Environmental Resources 2301 Market Street, S26-1 P.O. Box 8469 Philadelphia, PA 19101 Harrisburg, PA 17105-8469 PECO Energy Company ATTN: Mr. T. N. Mitchell, Vice President Board of Supervisors Peach Bottom Atomic Power Station Peach Bottom Township 1848 Lay Road R. D. #1 Delta, PA 17314 Delta, PA 17314 PECO Energy Company Public Service Commission of Maryland ATTN: Regulatory Engineer, A4-SS Engineering Division Peach Bottom Atomic Power Station Chief Engineer 1848 Lay Road 6 St. Paul Centre Delta, PA 17314 Baltimore, MD 21202-6806 Resident inspector Mr. Richard McLean U.S. Nuclear Regulatory Commission Power Plant and Environmental Peach Bottom Atomic Power Station Review Division.

P.O. Box 399 Department of Natural Resources Delta, PA 17314 B-3, Tawes State Office Building Annapolis, MD 21401 Regional Administrator, Region i U.S. Nuclear Regulatory Commission Dr. Judith Johnsrud 475 Allendale Road National Energy Committee King of Prussia, PA 19406 Sierra Club 433 Orlando Avenue Mr. Roland Fletcher State College, PA 16803 Department of Environment 201 West Preston Street Manager-Financial Control & Co-Ovmer Baltimore, MD 21201 Affairs Public Service Electric and Gas A. F. Kirt>y, lll Company Extemal Operations - Nuclear P.O. Box 236 Delmarva Power & Light Company Hancocks Bridge, NJ 08038-0236 P.O. Box 231 Wilmington, DE 19899 Manager-Peach Bottom Licensing PECO Energy Company PECO Energy Company Nuclear Group Headquarters Plant Manager Correspondence Control Desk Peach Bottom Atomic Power Station P.O. Box No.195 1848 Lay Road Wayne, PA 19087-0195 i

~ Dette, PA 17314

-