ML20217A111

From kanterella
Jump to navigation Jump to search

Advises That Info Re 980209 Application from Philadelphia Electric Co Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5)
ML20217A111
Person / Time
Site: Limerick 
Issue date: 04/15/1998
From: Buckley B
NRC (Affiliation Not Assigned)
To: Watford G
GENERAL ELECTRIC CO.
References
TAC-MA0820, TAC-MA820, NUDOCS 9804220156
Download: ML20217A111 (4)


Text

,

i t@h go - 362.

l q

l

[

k UNITED STATES

s j

NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 30666 0001

,g#

April 15,1998 l

Mr. Glen A. Watford l

Manager, Nuclear Fuel Engineering l

General Electric Company j

l P. O. Box 780 l

M/C A 16 Wilmington, North Carolina 28402 l

SUBJECT:

REQUEST FOR WITHHOLDING INFORMATION FROM PUBLIC DISCLOSURE, LIMERICK GENERATING STATION, UNIT 1 (TAC NO. MA0820)

Dear Mr. Watford:

In Philadelphia Electric Company's February 9,1998, application, the following document was submitted and your affidavit dated January 21,1998, requested that it be withheld from public disclosure pursuant to 10 CFR 2.790:

Letter, R. M. Butrovich (GE) to K. W. Hunt (PECO Energy) " Limerick Unit 1 l

Cycle 8 Safety 1.imit MCPR* dated January 20,1998 You indicated that the submitted proprietary information should be considered exempt from mandatory public disclosure for the following reasons:

a, information that discloses a process, method, or apparatus, including supporting data and analyses, where prevention of its use by General Electric's competitors without license from General Electric constitutes a competitive economic advantage over

, other companies;

b. Information which, if used by a competitor, would reduce his expenditure of rescurces or improve his competitive position in the design, manufacture, shipment, installation, assurance of quality, orlicensing of a similar product;
c. The information identified in paragraph (2) of your affidavit is classified as proprietary because it contains details of GE's Oafety Limit MCPR analysis and the corresponding results which GE has applied to this specific plant and cycle's actual core design with GE's fuel.

The development of the methods used in these analyses, along with the testing, development and approval of the supporting critical power correlation was achieved at a significant cost, on the order of several million dollars, to GE.

i We have reviewed your application and the material in accordance with the requirements of 10 CFR 2.790 and, on the basis of your statements, have determined that the submitted information sought to be withheld contains proprietary commercial infonnation. A non-proprietary

\\

version of the document was submitted for placement in the NRC's public document room.

Nhlg l

Therefore, Attachment 3 (listed above) submitted with Philadelphia Electric Company's h

February 9,1993, letter to the NRC, marked as proprietary, will be withheld from public disclosure pursuant to 10 CFR 2.790(b)(5) and Section 103(b) of the Atomic Energy Act of 1954, as amended.

k h h !j h h h h 9004220136 98041S 5

i PDR ADOCK 05000352 i

p PDR

f l

l I

G. Watford 1 l

Withholding from public inspection shall:iot affect the right, if any, of persons p,operly and directly concemed to inspect the documents. If the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary infonnation.

If the basis for withholding this information from public inspection should change in (M future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom of Information Act request includes your information in all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely,

/S/

Bartholomew C. Buckley, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - l/11 Office of Nuclear Reactor Regulation Docket No. 50-352 cc: See next page DISTRIBUTION:

Docket File PUBLIC PD1-2 Reading J. Zwolinski R. Capra M. O'Brien B. Buckley OGC-M.P. Siemien ACRS C. Anderson, RGN I OFFICE PDI,2/RM PDI-2/LAk OGC A

PDI-2/D G NAME BBb MdBrlen MPSiemien RCapra W mw f/b98 i/h98

/

4 F 98 DATE S //d/98

/ /

OFFICIAL R'ECORD COPY DOCUMENT NAME: LIMA 820.LTR l

o

1 G. Watford Withholding from public inspection shall not affect the right, if any, of persons properly and l

directly concemed to inspect the documents if the need arises, we may send copies of this information to our consultants working in this area. We will, of course, ensure that the consultants have signed the appropriate agreements for handling proprietary information.

If the basis for withholding this information from public inspection should change in the future such that the information could then be made available for public inspection, you should promptly notify the NRC. You also should understand that the NRC may have cause to review this determination in the future, for example, if the scope of a Freedom ofinformation Act request includes your information. In all review situations, if the NRC makes a determination adverse to the above, you will be notified in advance of any public disclosure.

Sincerely, b,

C. t Bartholomew C. Buckley, Senior Project Manager Project Directorate 1-2 Division of Reactor Projects - t/II Office of Nuclear Reactor Regulation Docket No. 50-352 cc: See next page l

PECO Energy Company Limerick Generating Station, Units 1 & 2 cc:

J. W. Durtiam, Sr., Esquire Chief-Division of Nuclear Safety Sr. V.P. & General Counsel PA Dept. of Environmental Resources i

PECO Energy Company P.O. Box 8469 2301 Market Street Harrisburg, PA 17105-8469 l

Philadelphia, PA 19101 1

Manager-Limerick Licensing,62A 1 Director Site Engineering PECO Energy Company Umerick Generating Sta*Jon 965 Chesterbrook Boulevard P.O. Bcx A Wayne, PA 19087-5691 Sanatoga, PA 19464 Mr. James D. von Suskil, Vice President Limerick Generating Station Manager-Experience Assessment Post Office Box A Limerick Generating Station l

Senatoga, PA 19464 P.O. Box A l

Sanatoga, PA 19464 Plant Manager Limerick Generating Station Library P.O. Box A U.S. Nuclear Regulatory Commission Senatoga, PA 19464 Region I 475 Allendale Road Regional Administrator, Region i King of Prussia, PA 19406 U.S. Nuclear Regulatory Commission 475 Allendale Road Senior Manager-Operations King of Prussia, PA 19406 Limerick Generating Station P.O. Box A Senior Resident inspector Sanatoga, PA 19464 U.S. Nuclear Regulatory Commission Limerick Generating Station Dr. Judith Johnsrud P.O. Box 596 National Energy Committee Pottstown, PA 19464 Sierra Club 433 Orlando Avenue Director-Site Support Services State College, PA 16803 Umerick Generating Station P.O. Box A Mr. Garrett D. Edwards Sanatoga, PA 19464 Director-Ucensing, MC 62A 1 i

PECO Energy Company Chairman Nuclear Group Headquarters j

Board of Supervisors Correspondence Control Desk of Limerick Township P. O. Box No.195 646 West Ridge Pike Wayne, PA 19087-0195 Linfield, PA 19468 l

i

'