Responds to Requesting Withdrawal of 971219 Schedular Exemption from 10CFR50,App E, Emergency Planning & Preparedness for Production & Utilization Facilities. Subj Application Is Being Treated as Withdrawn
ML20216J877
Person / Time
Site: Clinton Constellation icon.png
Issue date: 04/17/1998
From: Hopkins J
NRC (Affiliation Not Assigned)
To: Sipek J
ILLINOIS POWER CO.
References
TAC-MA0321, TAC-MA321, NUDOCS 9804220018
Download: ML20216J877 (4)


Text

i l

l l

l April.17, 1998 i

Mr. Joseph V. Sipek l

Director-Licensing l

Clinton Power Station i-P.O. Box 678 l

Mail Code V920 Clinton,IL 61727

SUBJECT:

CLINTON POWER STATION WITHDRAWAL OF SCHEDULAR EXEMPTION REQUEST (TAC NO. MA0321).

l

Dear Mr. Sipek:

By letter dated December 19,1997, you applied for a schedular exemption from 10 CFR Part l

50 Appendix E, " Emergency Planning and Preparedness for Production and Utilization l

Facilities," regarding performance of the next biennial exercise for Clinton Power Station. The 4

proposed change would have permitted the full-participation exercise due to be completed in 1998 to be postponed until January 1999. Subsequently, by letter dated April 6,1998, you withdrew the request.

The purpose of this letter is to advise that the above-cited application is being treated as withdrawn.

Sincerely, Original signed by:

Jon B. Hopkins, Senior Project Manager Project Directorate ill 3 Division of Reactor Projects Ill/IV 4

Office of Nuclear Reactor Regulation 1

Docket No. 50-461 Distnbution-Docket File PUBLIC cc: See next page ACRS PD33 R/F EGA1 GGrant, Rill i

RSavio OGC Document Name: G:\\CLINTON\\EPDRILL.WD OFFICE PM:PDIII-3 1/lE LA:PDIII-3 lE NAME JHopkins S

EBarnhill f>(h-i DATE 4/ //7 /98 /\\\\

4 /\\1 /98

'g 0

l OFFICIAL RECORD COPY

. I,3 y*

~

PO F'm g 9804220018 980417 s'-4 6Q k~;.]

3 PDR ADOCK 0500 4 1 i

r s

l..

t April 17, 1993

\\

i Mr. Joseph V. Sipek Director-Licensing Clinton Power Station l

P.O. Box 678 Mail Code V920 l

Clinton,IL 61727

SUBJECT:

CLINTON POWER STATION - WITHDRAWAL OF SCHEDULAR EXEMPTION l

REQUEST (TAC NO. MA0321)

Dear Mr. Sipek:

By letter dated December 19,1997, you applied for a schedular exemption from 10 CFR Part 50 Appendix E," Emergency Planning and Preparedness for Production and Utilization Facilities," regarding performance of the next biennial exercise for Clinton Power Station. The proposed change would have permitted the full-participation exercise due to be completed in 1998 to be postponed until January 1999. Subsequently, by letter dated April 6,1998, you withdrew the request.

The purpose of this letter is to advise that the above-cited application is being treated as withdrawn.

l Sincerely, 4

Original signed by:

Jon B. Hopkins, Senior Project Manager Project Directorate 111-3 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation Docket No. 50-461 Distribution:

Docket File PUBLIC cc: See next page ACRS PD33 R/F EGA1 GGrant, Rlll RSavio OGC Document Name: G:\\CLINTON\\EPDRILL.WD OFFICE PM:PDIII-3 A/ lE LA:PDIII-3 lE NAME-JHopkins M

EBarnhill Phr DATE 4/ //7 /98 /\\\\

4 /\\~1 /98 0FFICIAL RECORD COPY l

5

,f("*%

1 UNITED STATES

.g-g

,j NUCLEAR REGULATORY COMMISSION

+

e WASHINGTON, D.C. 20066-4001

,\\ ***. /

l l

l April 17, 1998 i

l Mr. Joseph V. Sipek Director - Licensing l

Clinton Power Station J

P.O. Box 678 Mail Code V920 Clinton,IL 61727

SUBJECT:

QUALITY ASSURANCE PROGRAM REVISION 26 FOR CLINTON POWER STATION (TAC NO. MA1105)

Dear Mr. Sipek:

By letter dated February 25,1998, Illinois Power submitted Revision 26 of the Illinois Power Nuclear Program Quality Assurance Manual for NRC review and approval pursuant to 10 CFR 50.54(a). Based on our current review schedule, we anticipate that it will require more than 60 days to complete our review. Upon completion of our review, you will be notified of the results.

Contact me if you have any questions.

Sincerely, V

i Jon B. Hopkins, Seni r Project Manager Project Directorate 111-3 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Docket No. 50-461 cc: See next page l

I I

f-4 i

Joseph V. Sipek Clinton Power Station, Unit 1 Ilknois Power Company ec:

l Walter G. MacFarland IV lilinois Department of Nuclear Safety Senior Vice President Office of Nuclear Facility Safety J

Clinton Power Station 1035 Outer Park Drive P.O. Box 678 Springfield,IL 62704 Clinton,IL 61727 Wayne Romberg Manager Nuclear Station Engineering Department Clinton Power Station P.O. Box 678 Clinton,IL 61727 Resident inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton,IL 61727 R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, CA 95125 Regional Administrator, Region lll U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351 l

Chairman of DeWitt County clo County Clerk's Office DeWitt County Courthouse Clinton,IL 61727 J. W. Blattner l

Project Manager l

Sargent & Lundy Engineers 55 East Monroe Street Chicago,IL 60603

(