Forwards Request for Addl Info Re GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Condition. in Order to Complete Review,Detroit Edison Requested to Respond by 971017
ML20216J488
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/09/1997
From: Kugler A
NRC (Affiliation Not Assigned)
To: Gipson D
DETROIT EDISON CO.
References
GL-96-06, GL-96-6, TAC-M96811, NUDOCS 9709170336
Download: ML20216J488 (3)


Text

- _ - _ _ - _ . _ _ - _ _ _. . _ . _ . _ _ _ __- _

  • . September 9, 1997

{

Mr. Douglas R. Gipson Senior Vice President Nuclear Generation .

Detroit Edison Company 6400 North Dixie Highway Newport, Michigan 48166

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE FERMI-2 RESPONSE TO GENERIC LETTER 96-06 (TAC-NO. M96811)

Dear Mr. Gipson:

On September 30, 1996, the O clear Regulatory Commission (NRC) issued Generic letter 96-05, " Assurance of Equipment Operability and Containment Integrity During Design-Bcsis Accident Conditions." On October 30, 1996 (NRC-96-Oll8),

, w January 25. Ma7 (NRC-97-0003), Detroit Edison provided the required

} ponses to the gueric latter.

idditional infern.4 tion, as discussed in the enclosure, is requested in order l for the staff to complete its review. NRC requests that Detroit Edison

, respond by Octob7r 17, 1997, if you have any qacstions concerniiig this request, please contatt me at (301) 41ti-2828.

1 Orig. signed by Andrew J. Kugler, Project Manager Project Directorate Ill I Division of Reactor Projects III/iV Office of Nuclear Reactor Regulation Docket No. 50-341

Enclosure:

As stated cc w/enet: See next page

' '~

- jy '

}

D]SJBIBUTION:

' Docket File PUBLIC OGC ACRS

~]vO 'I [! f PD31 r/f MJordan, Rill (MJa EAdensam, EGAl JFair, EMED DOCUMENT NAME: G:\WPDOCS\ FERMI \FE96811.RAI l0FFICE' PM:PD31 lE LA:Pd31 E C:EMEB E 0:PD31gg?,l lNAME AKugler:db @ CJa.merson (W RWessman h l JHann/JL (t_.,

lDATE 09/ 3 /97 U 09/ 3 /97 0 09/( /97' 09/ci /97 0FFICIAL RECORD COPY lll iHh. dM 9709170336 970907 PDR ADOCK 05000341 ,

P .*^***

PDR

e

( .

Mr. Douglas R. Gipson Fermi 2 Detroit Edison Company cc:

John Flynn, Esquire Senior Attorney -

Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality 3423 N. Martin Luther Kir.g Jr Blvd P. O. Box 30630 CPH Mailroom f Lansing, Michigan 48g0g 8130 U.S. Nuclear Regulatory Conimission Resident inspector's Office 6450 W. Dixie Highway

  • vpert, Michigan 48166 svorce County Emergency Management

'sivision t 963 South Raisinville Monroe, Michigan 48161 Regional Administrator, Region ill U.S. Nuclear Regulatory Commission 801 Warrenville Road Listo, Illinois 60532 4351 Norman K. Peterson

, Director, Nuclear Licensing Detroit Edison Company Fermi 2 - 280 TAC 6400 North Dixie Higheiay Newport, Michigan 48166 August 1997

-.m__._._ _ _ . . . _ _ . _., _ .

_ - _ - _ - - _ _ _ _ . - _ _-_. _-.a .-

7-q .

REQUEST FOR ADDITIONAL INFORMATION RELATED TO THE~

FERMI-2 RESPONSE TO GENERIC LETTER 96 06 (TAC NO. M96811)

In its January 28, 1997 (NRC-97 0003).-letter responding to Generic-

~ Letter 96-06, Detroit Edisen (DECO) identified six pipes that penetrated-containment and were susceptible to thermally-induced pressurization. DECO indicated that it had evaluated these penetrations for operability. DECO also indicated that it would monitor the ongoing discussion of the generic issue between the NRC and the Nuclear Energy Institute and design and install

. modifications, as necessary. to provide adequate overpressure protection for the affected drywell piping penetrations.

The NRC requests that DECO provide summaries of the evaluations performed for the pipes in the six affected penetrations. The summaries should include fabrication drawings of the piping sections evaluated and describe'the method ,

or analysis, including the assumptions used in the analyses, and the results.

The-response from DECO should also explain how the criteria used for the evaluations meet the licensing basis criteria for Fermi 2 and provide the schedule for the completion of any modifications that may be required.

ENCLOSURE 7 .,