Discusses Completion of GL 96-01, Testing of Safety-Related Logic Circuits, for James a Fitzpatrick Nuclear Power Plant,Submitted by Ltrs & 970106.Ltrs Provide Both Info Requested & Responses Required,Tac M94678 Closed
ML20216J461
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 04/16/1998
From: Williams J
NRC (Affiliation Not Assigned)
To: James Knubel
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
GL-96-01, GL-96-1, TAC-M94678, NUDOCS 9804210389
Download: ML20216J461 (5)


Text

l Co 3 33 SQ Cfc a.

UNITED STATES j

j NUCLEAR REGULATORY COMMISSION 2

WASHINGTON, D.C. 2006H001

\\..... p/

April 16, 1998 Mr. James Knubel Chief Nuclear Officer Power Authority of the State of New York 123 Main Street White Plains, NY 10601

SUBJECT:

JAMES A. FITZPATRICK NUCLEAR POWER PLANT - COMPLETION OF LICENSING ACTIVITIES REGARDING GENERIC LETTER 96-01 (TAC NO. M94678)

Dear Mr. Knubel:

On January 10,1996, the U.S. Nuclear Regulatory Commission (NRC) issued Generic Letter (GL) 96-01, " Testing of Safety-Related Logic Circuits," to all holders of operating licenses or construction permits. GL 96-01 was issued for three principal reasons:

1.

Notify licensees about problems with testing of safety-related logic circuits; 2.

Request that all addressees implement the actions described within the generic letter, and 3.

Require that all addressees submit a written response to the NRC regarding implementation of the requested actions.

I In GL 96-01, the NRC staff specifically requested that licensees take the following actions:

1.

Compare electrical schematics and logic diagrams for the reactor protection system, emergency diesel generator load shedding and sequencing, and actuation logic for the engineered safety feature systems against plant surveillance test procedures to ensure that all portions of the logic circuitry, including the parallel logic, interlocks, bypasses, and inhibit circuits, are adequately covered in the surveillance procedures to fulfill the technical specification requirements. This review should also include relay contacts, control switches, and other relevant electrical components within these systems, utilized in the logic circuits performing a safety function; and 2.

Modify the surveillance procedures as necessary for complete testing to comply with the technical specifications. Additionally, the licensee may request an amendment to the technical specifications if relief from certain testing requirements can be justified.

Furthermore, the NRC staff required that addressees prepare and submit the following:

1.

A written response indicating whether or not the licensee would implement the actions requested above, or propose an attemative action; g

{

2.

A schedule for completing the requested actions or proposed attematives; and h1 C

9804210389 980416

[,,] ] T* 1;i" p t 7 y PDR ADOCK 05000333

..s m o ;

. t. tn >.

eg

,m' g P

PDR y

c April 16, 1998 J.Knubel 3.

A response confirming completion of the requested actions.

In response to GL 96-01, you submitted letters dated April 15,1996 and January 6,1997 for the James A. FitzPatrick Nuclear Power Plant. These letters provide both the information requested and the responses required by GL 96-01; therefore, TAC No. M94678 is closed.

Please contact me at (301) 415-1470 if you have any questions on this topic.

Sincerely, Original Signed by:

Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333 cc: See next page

_DISTRIBUTIO_N_:

( Docket File

  • PUBLIC PDI-1 R/F J. Zwolinski (A)

S. Bajwa S. Little J. Williams J. Wermeil OGC ACRS C. Hehl, Region i DOCUMENT NAME: G:\\FITZiM94678.LTR To receive a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with rttachment/ enclosure

",N" = No copy n

OFFICE PM:PDI-1 MjE{

LA:PDI1,Oy.

l D:PDI-1,, A l

HICBD Aj, f l6l l_

NAME JWilliams lec M Slittle V SBajwa MN JWe d l

  • lDATE

,04/ #/9s /'

04/l 5 /98 04/rt4/9s 04//f/98 04/ /98 Official Record Copy

I 1

April 16, 1998 g

J. Knubel 3.

A response confirming completion of the requested actions.

In response to GL 96-01, you submitted letters dated April 15,1996 and January 6,1997 for the James A. FitzPatrick Nuclear Power Plant. These letters provide both the information requested i

and the responses required by GL 96-01; therefore, TAC No. M94678 is closed.

Please contact me at (301) 41F '470 if you have any questions on this topic.

Sincerely, Original Signed by:

Joseph F. Williams, Project Manager Project Directorate 1-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation Docket No. 50-333 cc: See next page i

DISTRIBUTION:

Docket File PUBLIC PDI-1 R/F J. Zwolinski (A)

S. Bajwa S. Little J. Williams J. Wermeil OGC ACRS C. Hehl, Region 1 DOCUMENT NAME: G:\\FITZ\\M94678.LTR To recolee a copy of this document, indicate in the box: "C" = Copy without attachment / enclosure "E" = Copy with attachment / enclosure "N" = No copy n

OFFICE PM:PDI 1 MjE LA:PDI-1 O %

l D PDI-1,, &

l HICBS A j, r l6 L

NAME Wi t t f ams:lec /74/

$Little W SBajwa M W JWerndilW DATE 04/17/9s //

04/6 5 /98 04/#to/9s 04//f/9s D4/ /98 Official Record Copy

f l

l\\

'J. Knubel,

3.

A response confirming completion of the requested actions.

i in response to GL 96-01, you submitted letters dated April 15,1996 and January 6,1997 for the James A. FitzPatrick Nuclear Power Plant. These letters provide both the information requested and the responses required by GL 96-01; therefore, TAC No. M94678 is closed.

Please contact me at (301) 415-1470 if you have any questions on this topic.

Sincerely, l

v j

Joseph F. Williams, Project Manager I

Project Directorate I-1 Division of Reactor Projects - 1/II l

Office of Nuclear Reactor Regulation l

Docket No. 50-333 cc: See next page l

l 4

L.

I l

r

!i.'

\\

James Knubel James A. FitzPatrick Nuclear Power Authority of the State Power Plant of New York cc:

I Mr. Gerald C. Goldstein Regional Administrator, Region l Assistant General Counsel U.S. Nuclear Regulatory Commission Power Authority of the State 475 Allendale Road of New York King of Prussia, PA 19406 1633 Broadway New York, NY 10019 Mr. F. William Valentino, President New York State Energy, Research, Resident inspector's Office and Development Authority U. S. Nuclear Regulatory Commission Corporate Plaza West l

P.O. Box 136 286 Washington Avenue Extension Lycoming, NY 13093 Albany, NY 12203-6399 l

Mr. Harry P. Salmon, Jr., V.P.

Mr. Richard L. Patch, Director L

Nuclear Operations Quality Assurance i

l Power Authority of the State Power Authority of the State of New York of New Yo*

I 123 Main Street 123 Main Street White Plains, NY 10601 White Plains, NY 10601 l

Ms. Charlene D. Faison Mr. Gerard Goering l

Director Nuclear Licensing 28112 Bayview Drive l

Power Authority of the State Red Wing, MN 55066 of New York 123 Main Street Mr. James Gagliardo White Plains, NY 10601 Safety Review Committee 708 Castlewood Avenue l

Supervisor Arlington, TX 76012 l

Town of Scriba Route 8, Box 382 Mr. ArthurZaremba, Licensing Manager Oswego,NY 13126 James A. FitzPatrick Nuclear l

Power Plant l

Mr. Eugene W. Zeltmann P.O. Box 41 President and Chief Operating Lycoming, NY 13093 Officer Power Authority of the State Mr. Paul Eddy I

of New York New York State Dept. of 123 Main Street Public Service White Plains, NY 10601 3 Empire State Plaza,10th Floor Albany, NY 12223 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 i