( ommonw ealth 1.dmn ('ompam In run (senerJLW% StJtion 4150 North (scrman (. hurt b Ro.h!
l lh ron. II. til010 Cu i hlHlid4e5441 April 14, 1998 l
1 LTR:
BYBON 98-0121 FILE: 2.7.300 Mr. A.
B.
Beach Regional Administrator Region III U. S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, IL 60532-4351
SUBJECT:
Annual Environmental Operating Report for Facility Licenses NPF-37 and 66
Dear Mr. Beach:
Byron is submitting the Annual Environmental Operating Report as required by the Operating License, Appendix B, Section 5.4 for Facility Licenses NPF-37 and 66.
The period of the report is from January 1, 1997 to December 31, 1997.
The report was reviewed against the objectives of the Environmental Protection Plan as stated in Section 1.0, Appendix B to the Operating License, and it has been determined that these objectives are beir.y met.
There were no noncompliances to the Environmental Protection Plan; therefore, no corrective actions were required by Appendix B, Section
- 5. 4.1 (1).
There were no changes in station design operation, or tests and experiments which involved a potentially significant unreviewed environmental question as defined in Section 3.1.
There were no non-routine reports submitted per Section 5.4.2.
Commonwealth Edison received no noise complaints during 1997. The aerial photographic monitoring program, described in Section 4.2.1, was completed in 1993.
The confirmatory sound survey requirements, described in Section 4.2.2.a., were completed in 1988.
\\
I g [, /
b 9804210386 980414 PDR ADOCK 05000454 g
/
(p:\\98byltrs\\980121.wpf)
\\ l ms i >m a omnam
I *'
l
\\
.Page,2 l
April 14, 1998 In accordance with Regulatory Guide 10.1, one copy of this report is provided for your use and 18 copies are being submitted directly to the Document Control Desk, U.S. Nuclear Regulatory Commission, Washington, D.C.
20555.
Sincerely,
'd K. L. Ko r Station Manager Byron Nuclear Power Station l
Attachments i
KLK/LAL/rp I
cc:
NRC Resident Inspe.ctor Document Control Desk (18 copies)
Site Nuclear Licensing Administrator Environmental Services l
l I
I
{pr\\98byltrs\\980121,wpf)