Forwards Response to NRC Ltr Re Violations Noted in Insp Repts 50-424/97-08 & 50-425/97-08 on 970623-27.Corrective Actions:Three Events Identified in Insp as Not Having Been Reviewed by SRV Were Reviewed by Srb on 970829
ML20216H979
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 09/10/1997
From: Mccoy C
SOUTHERN NUCLEAR OPERATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-424-97-08, 50-424-97-8, 50-425-97-08, 50-425-97-8, LCV-1087-A, NUDOCS 9709170125
Download: ML20216H979 (3)


Text

_ _ - _ _ _ _ _ _ _ - _ _ _ _ - - _ _ _ - -

- C. K. McCoy Southern Nuclear Vice President Operstlag Company,Inc.

Ve;jtle Project 40 inwrness Center Parkway P0. Box 1293 Birmingham Alabama 35201

  • O Tel 205 992.7122 Fax 2059920403 SOUTHERN h COMPANY September 10, 1997 Energy to Serve %urWorld*

Docket No.

50-424 50-425 U. S. Nuclear Regulatory Commission LCV-1087-A ATTN: Document Control Desk Washington, D. C, 20555 Ladies and Gentlemen:

VOGTLE ELECTRIC GENERATING PLANT REPLY TO A NOTIC!? OF DEVIATION Pursuant to 10 CFR 2.201, Southern Nuclear Operating Company (SNC) submits the enclosed information for Vogtle Electric Generating Plant (VEGP) in response to a deviation identified in Nuclear Regulatory Commission (NRC) Inspection Report Nos. 50-424; 425/97-08, which concerns an inspection conducted from June 23,1997, through June 27,1997. In the enclosure, a transcription of the deviation precedes SNC's response.

Should you have any questions feel free to contact thi= ofIice.

Sincerely, C. K. hicCoy CKM/CTT/afs -

Enclosure:

Reply to Notice of Deviation 50-424;425/ 97-08 cc: Southern Nuclear Operating Company

/

Mr. J. B. Beasley, Jr.

Mr. M. Sheibani NORMS US. Nuclear Reculatory Commission Mr. L. A. Reyes, Regional Administrator Mr. L. L. Wheeler, Senior Project Manager, NRR NRC Senior Resident Inspector, Vogtle 9704170125 970910 lk!h h !ii e

PDR ADOCK 05000424 G

PDR

~

s.

ENCLOSURE VOGTLE ELECTRIC GENERATING PLANT - UNITS 1 & 2

(

REPLY TO A NOTICE OF DEVIATION NRC INSPECTION REPORTS 50-424: 425/97-08 DEVI ATION, (50-424:425/97-08-E The following is a transcription of the deviation as cited in the Notice of Deviation (NOD):

"During an NRC inspection conducted June 23, through 27,1997 a deviation was identified from commitments you made as part of the Updated Final Safety Analysis Report (UFSAR). In accordance with the ' General Statement of Policy and Procedur; for NRC Enforcement Actions,' (NUREG 1600), the deviation is listed below:

UFSAR, Revision 6, Section 17.2.1.1.1.7.F states the Safety Review Board (SRB) shall be responsible for reviewing significant operating abnormalities or deviations from normal and expected performance of plant equipment that affect nuclear safety.- Section 17.2.1.1.1.7.H also states the SRB shall review all recognized indications of an unanticipated deficiency in some aspect of design or operation of structures, systems, or components that could afTect nuclear safety.

l Contrary to the above, during SRB meetings conducted on December 18,1996, and Apri130,1997, incidents or events associated with UFSAR Sections 17.2.1.1.1.F and H were not reviewed unless they also resulted in an audit finding, event report, violation, or special report."

RESPONSE TO DEVIATION (50 424:425/97-08 02)

Admission or Denial of the Deviation:

This deviation occurred as stated in the notice of deviation.

Reason for the Deviation:

The deviation was attributed to an inadequate administrative procedure that did not provide detailed instructions on what specific items would be reviewed to meet the criteria from the

'UFSAR for the two items discussed in the deviation.

Corrective Steps Which Have Been Taken and the Results Achieved:

1.

The three events identified in the inspection as not having been reviewed by the SRB were reviewed by the SRB on August 29,1997.

2.

Procedure VSRB-05, " Safety Review Board," has been revised to provide guidance as to what specific items need to be reviewed to meet the two SRB review criteria discussed in the deviation.

ENCLOSURE VOGTLE ELECTRIC GENERATING PLANT-UNITS I & 2 REPLY TO A NOTICE OF DEVIATION NRC INSPECrlON REPORTS 50-424: 425/97-08 Corrective Stens Which Will De Taken to Avoid Further Deviations 1.

Applicable VEGP site procedures will be reviewed and revised as necessary to address forwarding to the SRB designated material to be included in the SRB review scope. This will be completed by November 1,1997.

2.

The revised procedures will be distributed to and discussed with SRB members during the next scheduled major SRB meeting. This will be completed by December 31,1997.

Date When Corrective Actions Will Be Completed:

All corrective actions will be completed by December 31,1997.

)

9 1

2 j