Transmits Summaries of 970902,04 & 09 Telcons Re Independent Corrective Action Verification Program
ML20216H788
Person / Time
Site: Millstone Dominion icon.png
Issue date: 09/11/1997
From: Curry D
AFFILIATION NOT ASSIGNED
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NMU-PPNR-0517-L, NMU-PPNR-517-L, NUDOCS 9709170068
Download: ML20216H788 (12)


Text

.

PARCONO Daniel L. Curry, vwe rwsoeni tuiw men: es lhysons Phr Group loc.

?676 Margantown Fkad

  • neading. PennsyNwua 19607 * (610)8% 23f6 e f ar (010) 6% M,0?

September 11,1997 Docket No. 50 336 Parsons NUM2 PPNR-0$17 L U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20$$$

Millstone Nuclear Power Station Unit No. 2 IndEPIndent Corrective Action Verification Procram (ICAVP)

Gentlemen:

This letter transmits summaries of telephone conferences between Parsons Power Group inc., the U. S.

Nuclear Regulatory Commission, NNECo and NEAC on September 2, September 4 and September 9, 1997. The purpose of these telephone conferences were as follows: Septe*

! weuss VDC's, DCN's, Calculations, and Document Retrieval; September 4 Discuss F

, mot C en i and Identification of Calculations Documenting Accident Mitigation Pararr SeptenA Discuas identification of Supporting Documentation and Setpoints.

Please call me at (610) 855 2366 if you have any questions.

Sincerely, a.rs Daniel L. Curry Parsons ICAVP Project Director

. DLC:djv Attachments 1.

Telephone Conference Notes from September 2,1997

(

2.

Telephone Conference Notes from September 4,1997

-f, g'3 I

i 3.

Telephone Conference Notes from September 9,1997 cc:

E. Imbro (2)- USNRC li. Eichenholz - USNRC R. Laudenat - NNECo J. Fougere NNECo Rep. Terry Concannon - NEAC Project Files

$ \\'fal 5 ih\\Y.

{p PDR ADOCK 050003368 9709170068 970911 P

PDR

ADMINISTRATIVE CONFERENCE NOTES SEPTEMHER 2,1997 PURPOSE:

Administrative telephone conference with NNECo, NRC, NEAC and Parsons to discuss:

VDC's Vault Drawing Changes DCN's. Design Change Notice e

Celculations e

  • Document Retrieval Date:

September 2,1997 1ist of Attendees NNECo NRC NEAC Parsons l

l Joe Fougere Manager, ICAVP Steve Reynolds T. Concannon Wayne Dobson Fred Supervisor, MP2 Paul Narbut Mark Fitzgerald Mattioli ICAVP Mike Ahern Manager, CMP Samir Serhan Ravi Joshi Manager, MP2 Reg.

Ken Kraynick Compliance Bruce Smith MP2 CMP, Licensing George Zagursky Tom MP2 Operations Jim Giova Moriarty Engineer Jim Petrosky Design and Config Control Engineer Richard Director, ICAVP Laudenat NOTE: The conference call scheduled for 8/28/97 was canceled per NNECo request.

1. EWR's - Engineering Work Requests ONE OF Tile INSPECTION AREAS FOR TiiE UNIT 2 ICAVP IS EWRS TilAT DID NOT RESULT IN A SELF CLOSING DESIGN CilANGE OR DOCUMENT CilANGE MECliANISM SUCil AS A DCR. MMOD, DCN, NRC ETC. IS TiiERE A WAY TO SEARCil AN ELECTRCNIC DATA BASE TO IDENTIFY TilESE EWRS? IN ADDITION WE NEED A BETFER UNDERSTANDING OF EWRS. Il0W LONG llAVE EWRS BEEN USED? %IIAT WAS USED IWFORE EWRS. WilAT TYPES OF Ti1INGS ARE EWRS USED FOR BESIDES INIFIATION OF A MODIFICATION AS DESCRIBED IN Tile DCM?.

PAGE1

ADMINISTRATIVE CONFERENCE NOTES SEPTEMBER 2,1997 Discussion

1. Prior to 1/96 EWRs and EWAs,(Engineering Work Authorlantions) were controlled via procedure NGP 3,04. After 1/96 EWRs were controlled via the DCM. EWRs are used to initiate modifications, engineering analysis, and answer questions requiring significant engineering manpower
2. EWRs are tracked in AITTS. If a EWR is modification related it may be closed and tracked by the modification, ifit is an engineering work EWR,it stays open until the work is done. Unit 2 has a historical EWR database that is not a controlled database, but a working tool it contains information dating back to appros.1994.
3. Prior to EWRs, projects assigned to the corporate engineering group was done by Project Assignment (PA). There is a log of pas with information going back to some time in the late 1970's,
4. NNECo indicated that on average Unit 2 has done approx.100 modifications per year. There may be appros. 20 non modification related EWRs per year.

ACTION:

Parsons to prepare a RAI requesting EWR database and PA log.

2. FSAR Changes T11E FSARCR LOG TRACKS FSAR / TEC11 SPEC CllANGES FROM 1983 TO PRESENT WERE TilERE FSAR CilANGES MADE PRIOR TO 19837 Discussion There was a major update to the FSAR on 6/82. No other changes were made in 1982.

There is no documentation that identifies any changes to the FSAR prior to 6/82. On 1/83 the Tech Spec was at revision 80.

3. PDCE WilAT IS A PDCE? WE BELIEVE IT STANDS FOR PLANT DESIGN CilANGE EVALUATION. WE NEED A GENERAL DISCUSSION ON Tills CilANGE VElllCLE.

W11AT WERE PDCE USED FOR7 WilAT TIME FRAME WERE TilESE USED?

WilAT PROCEDURE COVERED Tills ITEM 7 ARE TliEY PRESENTLY LISTED IN A DATABASE?

9iscussion

1. Yes, PDCE does stand for Plant Design Change Evaluation. They were used from the mid 1980's until approx.1991 for like for like type of changes. PDCEs were stopped in 1991 due to the possibility for misuse Changes to the plant were made based on PDCEs.

PAGE 2

ADMINISTRA'IIVE CONFERENCE NOTES SEPTEMHER 2,1997 There is a Unit 2 database of PDCEs.

ACTION:

Parsons to prepare a RAI requesting PDCE database.

NNECO to identify lo Parsons the procedure that controlled PDCEs.

4. Response to RAI.246 111B PURPOSE OF Tills RAI WAS TO OBTAIN INFORMATION ON Tile DATE Wi1EN UNIT 2 WAS FIRST COMM11TED TO IMPLEMENTING EACil 0F T11E l

VARIOUS ENGINEERING PROGRAMS AND TOPICAL AREAS. WE NEED Tills INFORMATION AS PART OF OUR REVIEW OF MODIFICATIONS. WE WOULD NOT LOOK FOR CONSIDERATION OF A ENGINEERING PROGRAM OR TOPICAL AREA PRIOR TO Tile COMMITMENT DATE. Tile RESPONSE TO RAI 246 DOES NOT ADDRESS ALL OF Tile ITEMS IDENTIFIED ON DCM FORM 3 2C. WE WOULD LIKE TO DISCUSS Tile DIFFERENCES HETWEEN TiiE RAI RESPONSE AND DCM FORM 3 2C AND CONFIRM TlLAT WE UNDERSTAND Tile DATES l

i PROVIDED IN RAl.246.

NNECO was not prepared to discuss this question.

5. Procedures WE WOULD LIKE TO OHTAIN AN UNDERSTANDING OF WilAT PROCEDURE (S)IS USED TO CONTROL OR TRACK ENTERING AND EXITING TECllNICAL SPECIFICATION ACTION STATEMENTS AND 110W Tile PROCEDURE IS USED.

DiscussIo'll

1. - There is no one procedure for controlling entering and exiting tech. spec. actions.

The high tier procedure is U2 OP 200.1 " Conduct of Operations". In addition, FP 2619A " Control Room Check" addresses the shift turnover report. Many times steps in surveillance procedures will remind people what to do when entering or esiting tech, spec. actions. Work Orders have fields for identifying equipment associated with tech, spec actions.

6. Calculations & Design Documents IS TliERE A DEFINITIVE LIST OF T11E CALCULATIONS, DRAWINGS. AND OTilER DOCUMENTS TilAT SUPPORT AND REFLECT Tile DESIGN BASIS FOR T11E CURRENT. AS INSTALLED, PLANT CONFIGURATION FOR T11E SELECTED SYSTEMS? IN OTHER WORDS.WilAT ARE YOUR ENGINEERS USING AS TiiE CURRENT DESIGN BASIS DOCUMENTATION FORllPSI AND AWF7 PAGE 3

ADMINISTRATIVE CONFERENCE NOTES SEPTEMBER 2,1997 Discussion:

1. There is no definitive list. Today, Millstone engineers have the PI 07 resuks.

Engineers working on a modification would contact the CMP project to obtain the PI-07 information. Prior to PI 07, engineers had to start from scratch to put together the design and licensing basis. They would talk to other engineers and track the documentation back through time.

2. PI 07 is a tool. Not all calculations are listed in PI 07. PI 07 conteins the licensing I

hasis, but does not address open issues.

3. NNECo has not been superseding calculations. There is a corrective action in progress to fin this situation. Today, one has to obtain and review all calculations to determine which calculation or part of a calculation is coe rently in effect.

ACTION:

Parsons to prepare a RAI requesting PI 6 and PI 7 summaries.

7. Piping I;

WilAT DOCUMENT (S) CONTAINS Tile MILLSTONE UNIT 2 PlPINO STRESS ANALYSIS CRITERIA 7-2.

WE WERE EXPECTINO TO FIND Tile PIPINO MOVEMENTS ON Tile PIPE SUPPORT LOAD SilEETS, WilERE CAN WE FIND Tills INFORMATION?

3.

WE BELIEVE IICLP IS NEEDED FROM NNECO IN IDENTIFYINO SOME MARK NUMBERS SO WE CAN OBTAIN Tile PROPER CALCULATIONS. WE WOULD LIKE TO DISCUSS Tills SITUATION. (REF RAI 197, 198, 199) 4 PLEASE DESCRIBE Il0W Tile STRUCTURAL AND PIPINO COMPUTER PR00 RAMS ARE CERTIFIED OR VERIFIED, AND WilAT IS Tile NAME OF Tile DOCUMENTATION FOR Tills EFFORT.

Discussion:

1.

Piping stress analysis criteria is contained in Hechtel specification P903, provided to Parsons in RAI 339

2. Piping movements can be found on load sheets, drawings,in calculations, or computer output sheets depending on the person that did the work.
3. Typically, the support ID is the sheet number of the drawing series. Determining the number, ifit is missing, can be difficult as it can be found in different places, NNECo suggests that we prepare a RAI asking for help if a number we need is missing.
4. The computer programs are certified before use in a calculation per NGP 2.24. This documentation is conhined in the software documentation file,(SDF).

PAGE 4

ADMINISTRATIVE CONFERENCE NOTES SEPTEMBER 4,1997 PURPOSE:

Administrative telephone conference with NNECo, NRC, NEAC and Parsons to -

discuss:

  • Document Control Identification of Calculations Documenting Accident Mitigation Parameters e

Date:

September 4,1997

(

List of Attendees NNECo NRC NEAC Parsons Joe Fcugere Manager, ICAVP Ralph Architzel Waync Dobson Fred Supervisor, MP2 -

Rich McIntyre Eric Blocher -

Mattioli ICAVP Rich Glaviano Ocorge Zagursky Mike Akins

1. Document Control WE ARE CONCERNED TilAT Tile INFORMATION BEING SUPPLIED TO PARSONS MAY NOT BE Tile LATEST REVISION, FOR EXAMPLE, PARSONS PREPARED REQUEST FOR ADDITIONAL INFORMATION (RAl-0185) ASKING FOR Tile FOLLOWING REFERENCED BECliTEL PROCEDURES:

A) ll867 014 P003, REV,2. DATED 1218 79 OR LATER, PIPING STRESS ANALYSIS B) Il867 014 P002, REV.1, DATED 1129 79 OR LATER, SUPPORT / RESTRAINT DESIGN T11E DOCUMENTS RECEIVED WERE BOTil REVISION LEVEL 0, WITil DATES OF 1012 79 ann 1016 76 RESPECTIVELY,WITil A STATEMENTTl{ATTilEY ARE Tile " LATEST VERSION AVAILABLE IN NDS" Tills IS IN CONFLICT WITli PIPING ANALYSIS AND SUPPORT DESIGN CALCULATIONS PRESENTLY BEING REVIEWED WillCli BOTil REFERENCE Tile LATER REVISION LEVELS. PLEASE -

DISCUSS 110W Tills IIAPPENED AND W11AT CAN BE DONE TO ENSURE TilAT WE RECEIVE TI{E LATEST REVISION FROM YOUR DOCUMENT CONTROL SYSTEM.

PAGE1

1 ADMINISTRATIVE CONFERENCE NOTES SEPTEMBER 4,1997 Discussion

1. The NDS system puts the burden on the engineer to reconstruct design documents and its basis. Some times it is difficult to find information depending on how well it is indemed.
2. This Question was tabled until the nest conference call, to allow NNECo to investigate why the wrong revisions were sent to Parsons.
2. Identification of Supporting Documentation WE ARE STRUGGLING WIT 11110W TO IDENTIFY DOCUMENTATION T11AT MAY SUPPORT PLANT OR DOCUMENT CllANGES. AS A L.iECIFIC EXAMPLE, REFERENCE DCN NUMBER DM2-00-0476 97. Tills DCN WAS PREPARED TO AS.

BUILT A DRAWING ADDING A SPARE BATTERY RACK. Tile PACKAGE CONSISTS OF A DCN FORM AND A $0.59 SCREENING EVALUATION. Il0W CAN WE FIND ENGINEERING REVIEW DOCUMENTATION TO CONFIRM TilAT Tile BATTERY RACK MEETS DESIGN OR LICENSING BASES? FOR EXAMPLE WE ARE LOOKING FOR DOCUMENTATION PREPARED FOR Tills DCN REGARDING:

A) WilETilER OR NOT Tile RACK WAS INSTALLED PER AN APPROFED PAST MODIFICATION?

1 B) WilETilER OR NOT OTilER DRAWINGS WOULD INDICATE TilAT A SPARE RACK WAS PART OF Tile ORIGINAL INSTALLATION?

B) WilETilER OR NOT CURRENT llVAC AND 11YDR00EN GENERATION -

CALCULATIONS ADDRESS SPARE BATTERIES STORED IN Tile ROOM 7 C) WHETHER OR NOT Tite RACK MEETS STRUCTURAL AND SEISMIC REQUIREMENTS?

D) WilETHER OR NOT Tile RACK AND ITS BAlTERIES PRODUCE ACCEPTABLE FLOOR LOADINGS?

f E) WHETilER OR NOT Tile CilARGER USED FOR T11E SPARE BA*ITERIES MEETS ELECTRICAL CRITERIA?

t Discussion This question will be addressed during the 9/9/97 conference. Parsons clarified the question to emphaslae that we are interested in documentation prepared at the time the i

DCN was reviewed and approved.

3. Identification of Calculations Documenting Accident Mitigation Parameters FOR TIER 2 WE NEED AS DOCUMENTED DESIGN INFORMATION TilAT PLAYS A ROLE IN ACCIDENT MITIGATION. THIS MAINLY INVOLVES CALCULATIONS.

WE WOULD LIKE TO DISCUSS HOW BEST TO OBTAIN Tills INFORMATION. WE PAGE 2 mw.,,.-

.,-p,.

,r.m_

,_r.

,,~._,,,,,,.y

,._,,,,,y,,,

m.,_.,

, -,, - -y,m.v_.,

,,c.,%.-,_e,_.y_,,_,,_,,-m_,.,,.

_ ~

ADMINISTRATIVE CONFERENCE NOTES SEPTEMBER 4.1997 ARE CONSIDERINO: A) TRYING TO IDENTilY Tile APPROPRIATE CALCULATIONS, OR B)IDENTilTING Tile PARAMETER WE ARE LOOKING FOR AND ASKING NNECO TO IDENTilY WillCil CALCULATION CONTAINS Tills INFORMATION.

Discussion i

1. Due to the current condition of Millstone Unit 2 calculation indeses. it would be efficient if Parsons identify the parameter we are looking for and NNECo identify which calculation contains the information.

A A

Z PAGE 3

ADMINISTRATIVE CONFERENCE NOTES SEPTEMBER 9,1997 PURPOSE:

Administrative telephone conference with NNECo, NRC, NEAC and Parsons to discusst Identification of Supporting Documentation Setpoints e

Date:

September 9,1997 List of Attendees NNECo NRC NEAC Parsons Joe Fougere Manager, ICAVP Steve Reyncids T Concannon Wayne Dobson l

Fral Supenisor, MP2 John Nakoski Dan Curry Mattioli ICAVP Mike Ahern Manager, CMP Samir Serhan Ken Fox Eric Blocher George Zagursky John Ililbish Mike Akins Document Control (question held over from 9/4/97)

WE ARE CONCERNED TilAT Tile INFORMATION BEING SUPPLIED TO PARSONS MAY NOT BE TIIE LATEST REVISION. FOR EXAMPLE, PARSONS PREPARED REQUEST FOR ADDITIONAL INFORMATION (RAl-0185) ASKING FOR Tile FOLLOWING REFERENCED BECHTEL PROCEDURES:

A) 11867-014 P003, REV,2, DATED 12-18 79 OR LATER, PIPin! STRESS ANALYSIS B) Il867-Cl4 P002, REY.1, DATED 1129-79 OR LATER, SUPPORT / RESTRAINT DESIGN TIIE DOCUMENTS RECEIVED WERE BOTil REVISION LEVEL 0, WITil DATES OF 10-12 79 AND 1016 76 RESPECTIVELY, WITil A STATEMENT TilAT TIIEY ARE THE " LATEST VERSION AVAILABLE IN NDS", THIS IS IN CONFLICT WITil PIPING ANALYSIS AND SUPPORT DESIGN CALCULATIONS PRESENTLY BEING REVIEWED WillCil BOTil REFERENCF THE LATER RE1..ON LEVELS. PLEASE DISCUSS Il0W THIS HAPPENED AND WilAT CAN BE DONE TO ENSURE TilAT WE PAGE1

4

{

ADMINISTRATIVE CONFERENCE NOTES SEPTEMBER 9,1997 l

RECEIVE Tile LATEST REVISION FROM YOUR DOCUMENT CONTROL SYSTEM.

t Discussion

1. NNECo is investigating whether this is an isolated case or not. They plan on being ready to discuss this topic on Thursday.
2. Identification of Supporting Documentation (from 9/4/97)

WE ARE STRUGGLINO WITlil10W TO IDENTIFY DOCUMENTATION TilAT MAY SUPPORT PLANT OR DOCUMENT C11ANGES. AS A SPECIFIC i

EXAMPLE, REFERENCE DCN NUMBER DM2-00-0476 97. Tills DCN WAS PREPARED TO AS BUILT A DRAWING ADDING A SPARE BATTERY RACK.

I Tile PACKAGE CONSISTS OF A DCN FORM AND A $0.59 SCREENING EVALUATION. Il0W CAN WE FIND ENGINEERING REVIEW I

DOCUMENTATION TO CONFIRM T11AT T11E BA1TERY RACK MEETS DESIGN OR LICENSING BASES? FOR EXAMPLE WE ARE LOOKING FOR DOCUMENTATION PREPARED FOR Tills DCN REGARDING:

a)

WilET11ER OR NOT Tile RACK WAS INSTALLED PER AN APPROVED PAST MODIFICATION?

l b)

W11ETilER OR NOT OT11ER DRAWINGS WOULD INDICATE TilAT A SPARE RACK WAS PART OF T11E ORIGINAL INSTALLATION?

c)

W11ET11ER OR NOT CURRENT llVAC AND llYDROGEN GENERATION CALCULATIONS ADDRESS SPARE BATTERIES STORED IN Tile R00M7 d)

WilET11ER OR NOT Tile RACK MEETS STRUCTURAL AND SEISMIC REQUIREMENTS?

c)

W11ETilER OR NOT Tile RACK AND ITS BATTERIES PRODUCE ACCEPTABLE FLOOR LOADINGS?

f)

W11 ETHER OR NOT Tile CilARGER USED FOR Tile SPARE BATTERIES MEETS ELECTRICAL CRITERIA?

Discussion j

1. Generically, the way to End documentation supporting a plant or document change is to review the PI 07 results, or do key word searches through the various design documents.
2. For the example DCN listed in the question, NNECo provided the following The spare storage rack was found during the CMP walkdown of the i

e

' 125VDC system, it was not part of original design, but was installed as part of a modification which did not update all of the affected drawings.

The CMP personnel did searches of the calculation tracking program and plant records to find design basis documents.

PAGE2

_. ~ ~

ADMINISTRATIVE CONFERENCE NOTES SEPTEMHER 9,1997 UIR 612 was written to answer the question of IIVAC and hydrogen generation.

The floor loading and rack structure was address in the PI 07 review, The spare batteries charger is connected to non vital power.

e

3. In the past, NNECo has had problems with as built changes not referencing the parent change documents. Last year all NNECo engineers received training that established the standard practice that the parent change document is to be referenced in as build DCNs. This in.ining is documented in the Unit 2 Design Engineering Training Manual.
4. In response to a follow up question on the scope of the PI 07 review regarding closed DCNs, NNECo confirmed that the Pl.07 looked at open DCNs.

Ilowever, closed DCNs would have been reviewed as part of a modification review, (PDCR, DCR, etc.).

5. Finding support documentation for plant and design document changes will be difficult for the Tier 3 reviews since it is looking horizontally across many systems. Parsons will need to look at small pieces of most of the PI 07 reviews, or do face to face conferences with NNECo engineers to find the information needed to complete the ICAVP review.
3. Setpoints
1. RAl 0145 REQUESTED Tile SLTPOINT CilANGE RECORD (SCR) LOO.

NNECO'S RESPONDED WITil M2 IRF-00014. Tills RESPONSE TRANShillTED A SCR LOG FR0h! I/1/95 TO 12/31/96, AND INDICATED TilAT PRIOR TO 1/1/95, SETPOINT CllANGES WERE ACC0hlPLISliED VIA PDCR'S, Tile SCR PROVIDED WITil hl2 IRF-00014 INDICATES TilAT Tile OWNER IS ROYCE Il0FFMAN OF UNIT 2 DESIGN. SPECIFICATION SP-ST-EE 329 INDICATES IN ATTACllMENT 3, MASTER SETPOINT INDEX TilAT TIIERE ARE MANY CONTROLLING DEPARTMENTS, WilAT PORTION OF Tile TOTAL SCR DOES TilAT TRANSMITTED VIA M2-IRF-00014 REPRESENT? IS IT Tile ENTIRE SCR OR ONLY TilAT CONTROLLED BY UNIT 2 DESIGN? DOES PARSONS IIAVE ALL OF Tile SCR LOGS?

2. PARSONS liAS REVIEWED Tile PDCR LOG TO IDENTIFY Tile SETPOINT CilANGES TilAT OCCURRED VIA TilAT VElllCLE. OF APPROXIMATELY 3000 PDCR'S, ONLY TillRTY FOUR (34) WERE IDENTIFIED AS SETPolNT CilANGES, AND OF Tile 34 SEVEN (7) WERE CANCELED. Tills SEEMS LIKE A SMALL NUMBER OF SETPOINT CilANGES FROM 1975 TO 1995. COULD SETPOINT llAVE OCCURRED VIA ANOTilER VElllCLE?
3. DRAFT SPECIFICATION SP M2 EE-0019, MILLSTONE UNIT 2 I& C SETPOINTS, SECTION 1.4 EXCLUDED CATEGORIES, INDICATES TilAT SETP0lNTS FOR BREAKERS, RELAYS AND TIME DELAYS ARE TiiE RESPONSIBILITY OF Tile ELECTRICAL ENGINEERING DEPT. IS TilERE A DOCUMENT SIMILAR TO DRAIT SPECIFICATION SP M2 EE-0019 FOR Tile PAGE 3

ADMINISTRATIVE CONFERENCE NOTES SEPTEMHER 9,1997 ELECTRICAL SETPolNTS? WilERE CAN WF FIND Tile INFORMATION ON Tile ELECTRICAL SETPOINTS?

Discussion

1. What was provided in response to RAl 0145 is the only SCR log for the period of time when NGP 3.16 was in effect. In response to a follow up question regarding whether any other setpoints were changed. NNECo stated that no setpoints controlled by organizations otlier than Unit 2 design, was changed during the time NGP 3.16 was in effect.
2. There was no other approved change mechanism for setpoints. One needs to keep in mind that a setpoint may have been change as part of a larger l

l modification,(PDRC). Parsons indicated that we have seen reference to setpoints being changed in the 1975 time frame by a Maintenance Request, (MR) Many plants have had setpoint control problems in the past.

NNECo's PI 07 would have reviewed the current setpoint and confirmed that it inects current design and license bases, regardless of past change control problems.

3. Yes, there is a document for electrical setpoints. This information is contained in an electrical drawing series. NNECo will check on w hich one and provide the information to Parsons.
4. Administration Question:

TWO OF T11E TELEDYNE PIPING ANALYSES PACKAGES PROVIDED UNDER RAl-00197. llAVE MISSING BOOKS AS FOLLOWS:

TMR REPORT #

MISSING SECTIONS E 1475-4 BOOK $

E 1475 2 BOOKS 2,3. AND 6 ARE TilESE SECTIONS BEING COPIED, OR ARE TilEY UNAVAILABLE?

Discussion:

1. They are being copied and will be sent as soon as completed.

PAGE 4