ML20216H510
| ML20216H510 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 09/09/1997 |
| From: | Wigginton D NRC (Affiliation Not Assigned) |
| To: | Mcgaha J ENTERGY OPERATIONS, INC. |
| References | |
| TAC-M98883, NUDOCS 9709160285 | |
| Download: ML20216H510 (3) | |
Text
.-
September 9, 1997
]
Mr. John R. McGaha, Jr.
Vice President - Operations Entergy Operations, Inc.
River Bend Station P. O. Box 220 St. Francisville, LA 70775
SUBJECT:
RIVER BEND STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION; LPRM CAllBRATION (TAC NO. M98883)
Dear Mr. McGahat-1 By letter dated August 29, 1997 Entergy Operations, Inc. (E01) requested an amendment to facil ty Operating License No. NPF-47 to increase the time between whole core local power range monitor (LPRM) calibrations.
In the course of our review, we have determined that additional information is needed.
Please provide the response to the following questions within 30 days so that we can continue with our, review.
On page 6 of the above referenced letter, E01 stated that "LPRM calibration current and 3D MINICORE calculated LPRM chamber exposure date were obtained from several plants...".
Please provide comparisons similar to Table 1 (page 7 of the referenced letter) for several plants including most importantly River Bend Station, Unit 1.
On page 8 of the referenced letter, l
Entergy stated that "this change has been implemented at several other BWRs,",
Please identify the BWRs to which this statement refers.
If you have any questions on this request, please let me know.
4 Sincerely, Od!GINAL SIGNED BY:
David L. Wigginton, Senior Project Manager Project Directorate IV-1 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation Doctet'No. 50-458 cc:
See next page DISTRIBR11QN Docket file PUBLIC PD4-1 r/f JClifford C. Hawes D. Wigginton T. Gwynn, RIV ACRS OGC (15B18)
E. Adensam (EGAl)
Document Name: RB98883.RAI 0FC PM/PD4h)
LA/PD4-1
/
NAME DWigg b /vw' CHawes('A) N 3/y/97 9/9/97
[
DATE COPY hNO YES/NO OFFICIAL RECORD COPY t
Mhh',hh
- l#"t888!
- 8
- 8Lo
,P PDR-i o u J o t) o
r
,,....,b, UNITED STATES p
4 NUCLEAR REGULATORY COMMISSION WADN4N(sf ON. D.C. Sle0HWM Septemiber 9,1997 Mr. John R. McGaha, Jr.
Vice President - Operations Entergy Operations, Inc.
~
River Send Station P. O. Box 220 St. Francisville, LA 70775
$UBJECT RIVER BEND STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION; LPRMCAllBRATION(TACNO.M98883)
Dear Mr. McGaha:
By letter dated August 29, 1997 EntergyOperations,Inc.(E01)hetimerequested an amendment to facility Operating License No. NPF-47 to increase t between whole core local >ower range monitor (LPRM)ional information is calibrations.
In the course of our review we lave determined that addit needed.
Pleaseprovldetheresponsetothefollowingquestionswithin30 days so that we can continue with our review.
On page 6 of the above referenced letter. E01 stated that "LPRM calibration current and 3D MINICORE calculated LPRM chamber exposure date were obtained from several plants...".
Please provide comparisons similar to Table 1 (page 7 of the referenced letter) for several plants including most importantly River Bend Station Unit 1.
On page 8 of the referenced letter, Entergy stated that "this change has been implemented at several other BWRs,".
Please identify the BWRs to which this statement refers.
If you have any questions on this request, please let me know.
Sincerely, r
e.,
avid L. Wigt nton, Senior Project Manager Pro,1ect Directorate IV-1 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-458 cc*
See next page
- - = -.
Mr. John R. McGaha Entergy Operations, Inc.
River Bend Station cci i
Winston & Strawn Executive Vice President and 1400 L Street, N.W.
Chief Operating Officer Washington, DC 20005-3502 Entergy Operations, Inc.
P. O. Box 31995 i
Manager - Licensing Jackson, MS 39286 Entergy Operations, Inc.
River Bend Station General Manager - Plant Operations j
P. O. Box 220 Entergy Operations, Inc.
St. Franctsville, LA 70775 River Bend Station P. O. Box 220 Director St. Francisville, LA 70775 Joint Operations Cajun 10719 Airline Highway Director - Nuclear Safety P. O. Box 15540 Entergy Operations Inc.
Baton Rouge, LA 70895 River Bend Station P. O. Box 220 Senior Resident inspector St. Francisville, LA 70775 P. O. Box 1050 St. Francisville, LA 70775 Vice President - Operations Support Entergy Operations, Inc.
President of West feliciana P. O. Box 31995 Police Jury Jackson, MS 39286-1995 P. O. Box 1921 St. Francisville, LA 70775 Attorney General State of Louisiana Regional Administrator, Region IV P. O. Box 94095 U.S. Nuclear Regulatory Comission Baton Rouge, LA 70804-9095 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 Wise, Carter, Child & Caraway P. O. Box 651 Ms. H. Anne Plettinger Jackson, MS 39205 3456 Villa Rose Drive Baton Rouge, LA 70806 Vice President & Controller Cajun Electric Power Cooperative Administrator 10719 Airline Highway Louisiana Radiation Protection Division P.O. Box 15540 P. O. Box 82135 Baton Rouge, LA 70895 Baton Rouge, LA 70884-2135
-:~+m<e y.*-
e
+wr
,-+ -
s;
...=
u-
_