ML20216H280

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-266/98-08 & 50-301/98-08 on 980316- 20.No Violations Noted.Purpose of Insp,To Review Radiation Protection Performance During Unit 1 Refueling Outage, Including Outage Work Controls,Alara Controls & Performance
ML20216H280
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 04/15/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Patulski S
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20216H284 List:
References
50-266-98-08, 50-266-98-8, 50-301-98-08, 50-301-98-8, NUDOCS 9804210100
Download: ML20216H280 (3)


See also: IR 05000266/1998008

Text

f

l

'

i

!

l

-

t

April 15, 1998

l

Mr. S. A. Patuiski

l

Site Vice Presidrt

Point Beach Nucl6 ir Plant

6610 Nuclear Road

Two Rivers, WI 54241

l

SUBJECT:

NRC RADIATION PROTECTION INSPECTION REPORTS 50-266/98008(DRS);

50-301/98008(DRS)

!

Dear Mr. Patuiski:

On March 20,1998, the Nuclear Regulatory Commission (NRC) completed an inspection of the

radiation protection program at your Point Beach Nuclear Plant. The results of this inspection

were discussed on that date with Mr. Cayia and other members of your staff. The enclosed

report presents the results of that inspection.

The purpose of this inspection was to review radiation protection performance during the Unit i

refueling outage (U1R24), including outage work controls, as-low-as-is-reasonably-achievable

(ALARA) controls, radiation worker performance, and outage posting, labeling and

l

housekeeping. In addition, several open items from previous inspections were reviewed and

closed.

Based on the results of this inspection, no violations of NRC requirements were identified.

The NRC has determined that radiation protection performance was effective for the activities

reviewed during the Unit i refueling outage. Good communication between health physics and

work groups was observed during work activities. Pre-job briefings were detailed and

effectively conveyed radiological conditions and radiation work permit (RWP) requirements,

although, ALARA review results were not clearly documented in RWPs.

In addition, radiation worker practices were generally good; however, two instances of poor

radiation work practices were identified involving a worker sitting in a designated higher dose

rate area and close to an ALARA alert sign, and an inadequate frisk by an individual exiting

containment. These incidents indicate that additional attention is warranted in this area.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its

enclosure will be placed in the NRC Public Document Room (PDR).

,

,

i

9804210100 980415

PDR

ADOCK 05000266

G

PDR

,

-

-

,

,

S. Patulski

2

April 15, 1998

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

hn A. Grobe, Director

ision of Reactor Safety

Docket Nos. 50-266; 50-301

License Nos. DPR 24; DPR27

I

Enclosure:

Inspection Reports 50-266/98008(DRS); 50-301/98008(DRS)

i

i

cc w/ encl:

R. R. Grigg, President and Chief

Operating Officer, WEPCO

A. J. Cayia, Plant Manager

B. D. Burks, P.E., Director

Bureau of Field Operations

'

Cheryl L. Parrino, Chairman

Wisconsin Public Service

Commission

State Liaison Officer

4

l

l

DOCUMENT NAME: G:DRS\\ pol 98008.DRS

vo ,-.~. . ..,y or ini. iiocum.nt, inoic.i. n, in. no=: c . copy inoui .it.enen.ni,.acio.or.

e

cony.nm.it.enm.nie.nciowr. w no copy

OFFICE

Rlli

E Rill

lE

Rlli

Il

Rill O ,fy

l#

NAME

KLambert:jp El% GShear Azs

JMcCormick-B bg JGrobb

' '

04/gf98

DATE

04/W/98

04/14/98

04/d/98

OFFICIAL RECORD COPY

I

.

S. Patuiski

3

Distribution:

CAC (E-Mail)

Project Mgr., NRR w/ encl

A. Beach w/ encl

l

J. Caldwell w/ encl

B. Clayton w/ encl

SRI Point Beach w/ enc!

DRP w/ encl

TSS w/enct

DRS (2) w/enct

/

l

Riti PRR w/e !

/

-k

'

, PUBLIC 1

w/enci

Docket File

enci

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)

l

l

l

!

I

i

i

21001G