ML20216G558

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-482/98-09 on 980223-27 & Notice of Violation Re Potential Weakness in Program to Control Unconditional Release of Radioactive Matl
ML20216G558
Person / Time
Site: Wolf Creek 
Issue date: 03/13/1998
From: Murray B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20216G564 List:
References
50-482-98-09, 50-482-98-9, NUDOCS 9803200025
Download: ML20216G558 (5)


See also: IR 05000482/1998009

Text

e

.jp

4,

UNITED STATES

[.,,

NUCLEAR REGULATORY COMMISSION

C

REGION IV

-

k ' , ,_ .g_

611 RYAN PLAZA DRIVE, SUITE 400

%

ARLINGTON, TEXAS 760118064

,

March 13,1998

Otto L. Maynard, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

' P.O. Box 411

Burlington, Kansas 66839

SUBJECT: NRC INSPECTION REPORT 50-482/98-09 AND NOTICE OF VIOLATION

Dear Mr. Maynard:

. From February 23-27,1998, a routine, radiation protection inspection was conducted at your

Wolf Creek Generating Station reactor facility. The enclosed report presents the scope and

,

results of that inspection.

A violation of regulatory requirements was identified. The violation is of concem because it

indicates a potential weakness in your program to control the unconditional release of

radioactive material.

'

.

The violation is cited in the enclosed Notice of Violation (Notice) and the circumstances

L

surrounding this violation are described in detail in the enclosed report. Please note that you are

requirea to respond to this letter and should follow the instructions specified in the enclosed

Notice when preparing your response. The NRC will use your response, in part, to determine

,

~ hether further enforcement action is necessary to ensure compliance with regulatory

!

w

requirements.

One unresolved item was identified conceming the calibration of instruments used to analyze air

i

samples. This matter is discussed in Section R1.4 of the enclosed inspection report.

l

'In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter, its

enclosure (s), and your response will be placed in the NRC Public Document Room (PDR).

Should you have any questions concerning this inspection, we will be pleased to discuss them

with you.-

Sincerely,

I

)

.

ISL)f f)

LWU'

l

Blaine Murray, Chief

{(

Plant Support Branch

Division of Reactor Safety

i

Docket No.:

50-482

..

.

9803200025 990313

PDR

ADOCK 05000482

G

PDR

L,

.

'

Wolf Creek Nuclear Operating Corporation

-2-

Enclosures:

1. Notice of Violation

2. NRC Inspection Report

50-482/98-09

cc w/ enclosures:

Chief Operating Officer

Wolf Creek Nuclear Operating Corp.

P.O. Box 411

Burlington, Kansas 66839

Jay Silberg, Esq.

Shaw, Pittman, Potts & Trowbridge

2300 N Street, NW

Washington, D.C. 20037

Supervisor Licensing

Wolf Creek Nuclear Operating Corp.

P.O. Box 411

Burlington, Kansas 66839

Chief Engineer

Utilities Division

Kansas Corporation Commission

1500 SW Arrowhead Rd.

Topeka, Kansas 66604-4027

- Office of the Governor

State of Kansas

'

Topeka, Kansas 66612

Attomey General

Judicial Center

301 S.W.10th

2nd Floor -

Topeka, Kansas 66612-1597

.

County Clerk

Coffey County Courthouse

Burlington, Kansas 66839-1798

1

!

1

i

C'

j*

1~

i

. ..

1

l

Wolf Creek Nuclear Operating Corporation

-3-

- Vick L. Cooper, Chief

!

~ Radiation Control Program

l

Kansas Department of Health

and Environment

Bureau of Air and Radiation

Forbes Field Building 283

Topeka, Kansas 66620

Mr. Frank Moussa

Division of Emergency Preparedness

2800 SW Topeka Blvd

i

Topeka, Kansas 66611-1287

I

l

I

4

i

l

,

j

l'

.

i

!

l

.

.

I-

p

!

<

r

,.

,

.

..

~ Wolf Creek Nuclear Operating Corporation

-4-

l

'

E-Mail report to T. Frye (TJF).

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

.DCD (IE06)

bec distrib. by RIV:

,

Regional Administrator

WC Resident inspector

DRS Director

DRS Deputy Director

DRP Director

SRI (Callaway, RIV)

Branch Chief (DRP/B)

DRS-PSB '

Project Engineer (DRP/B).

MIS System

. Branch Chief (DRP/TSS) -

RIV File

Action Item File (98-G-0046) (Goines)

i

f

I

L

DOCUMENT NAME: R:\\_WC\\WC809RP.LTR

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with

enclosures "N" = No co ay

A

RIV:PSB Af3E

PSB

C:DRP\\B 1

C:DRS\\PSB

'

LTRicketson:nh fT. MCHay OgTNDJohnsorp

BMurray

[")-

03/#/98

V

03/// /98

03/\\V98

03/J48

'

OFFICIAL RECORD COPY

u

,

o

d

Wolf Creek Nuclear Operating Corporation

-4-

E-Mail report to T. Frye (TJF)

E-Mail report to T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

DCD (IE06)

bcc distrib. by RIV:

Regional Administrator

WC Resident inspector

DRS Director

DRS Deputy Director

DRP Director

SRI (Callaway, RIV)

Branch Chief (DRP/B)

DRS-PSB

Project Engineer (DRP/B)

MIS System

Branch Chief (DRP/TSS)

RIV File

Action Item File (98-G-0046) (Goines)

Y

DOCUMENT NAME: R:\\__WC\\WC809RP.LTR

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with

enclosures "N" = No copy

A

RIV:PSB Af 3E

PSB

C:DRPiB

C:DRS\\PSB ,

LTRicketson:nh f 6$. MCHay 'p;&WDJohnsor/

BMurray f4

03/ff/98

P' ' '

03/// /98

03/\\V98

03/l$8

'

OFFICIAL RECORD COPY

I

1