MONTHYEARML20210A4951999-07-22022 July 1999 Package Consisting of Questions & Comments Re PBAPS Submittal,Dtd 980813,in Support of Discussion on Listed Items ML20151X8811998-06-23023 June 1998 Rev 2 to PM-1011, Core Spray Pump Npsh ML20151X8721998-06-23023 June 1998 Rev 2 to PM-1010, RHR Pump Npsh ML20151X8621998-06-22022 June 1998 Rev 1 to PM-1013, Min Containment Pressure Available ML20195E3151998-04-27027 April 1998 Non-proprietary Version of Rev 1 to Calculation MISC-PENG- CALC-064, Verification of ECCS Strainer Pressure Drops for Peach Bottom,Units 2 & 3 ML20195E3551997-11-28028 November 1997 Non-proprietary Version of Rev 1 to Calculation MISC-PENG- CALC-062, Evaluation of Predictions & Data for Prototype Strainer ML20216E6891997-08-0404 August 1997 Calculation 0067-000-84-C-020 (PS-0920), Clipped A-46 Spectra for Radwaste/Turbine Building. W/14 Oversize Drawings ML20216E7491997-07-24024 July 1997 Calculation CTLAR-01 PS-0939, LAR of Raceway Supports for PBAPS Units 2 & 3 ML20216E7161997-04-28028 April 1997 Calculation 0067-00084-C-011 PS-0912, LAR of Raceways ML20134D5471996-10-28028 October 1996 Press Release I-96-71, Parts of Local PDR for Three Mile Island & Peach Bottom Nuclear Plants Reopened ML20058P0931993-09-17017 September 1993 Package Containing Attachment to Employee Concerns Programs ML20086C4921991-10-0404 October 1991 Design of Full Structural Weld Overlay on Pbaps,Unit 3 Reactor Water Cleanup Weld No 12-I-1C ML20247H9431989-07-25025 July 1989 Summary of ASME Repairs & Replacement Completed (N1S-2) for Peach Bottom Atomic Power Station Unit 2,870401-890426 ML20237D7901987-12-10010 December 1987 Package of Unrelated Documentation Re Listed Plants Concerning NRC Emergency Response Data Sys IA-87-759, Annotated Slides of NRC 870909 Briefing on Pipe Replacement Project1987-09-0909 September 1987 Annotated Slides of NRC 870909 Briefing on Pipe Replacement Project ML20236X0061987-09-0909 September 1987 Annotated Slides of NRC 870909 Briefing on Pipe Replacement Project IA-87-209, Package of Undated Documents Re NRC Briefing of Commission Concerning Shutdown of Plant1987-07-23023 July 1987 Package of Undated Documents Re NRC Briefing of Commission Concerning Shutdown of Plant ML20235Y5381987-07-23023 July 1987 Package of Undated Documents Re NRC Briefing of Commission Concerning Shutdown of Plant ML20151M9601987-07-20020 July 1987 Package of NRC Administered Requalification Exam Results Summary ML20235N6621987-07-15015 July 1987 Package of Partially Withheld Investigation Status Records, Draft Synopsis,Handwritten Notes & Util Personnel Policy Re Case 1-85-019 Concerning Alleged Threats to Employees to Prevent Disclosure of Possible Overexposure to NRC ML20235A1861987-07-0101 July 1987 Partially Withheld Package Consisting of Radiation Work Permit 3-1-003,discrepancy Rept,Radiation Contamination - Airborne Survey & Radiation Work Permit Access & Exposure Control ML20206N8911987-04-14014 April 1987 Revised Viewgraphs to 870410 Transcript on Commission Briefing Re Status of Facility ML20214E4881987-04-0606 April 1987 Press Release Re Util Plan to Investigate Reasons for NRC Order Suspending Plant Operation IA-87-185, Partially Deleted Encl from SECY-86-322 Discussing Declining Performance Trends,Plant SALP for Apr 1985 - Jan 1986 & Enforcement Conference W/Util.Util Seems Responsive Toward Improved Performance1986-10-29029 October 1986 Partially Deleted Encl from SECY-86-322 Discussing Declining Performance Trends,Plant SALP for Apr 1985 - Jan 1986 & Enforcement Conference W/Util.Util Seems Responsive Toward Improved Performance ML20216F4841986-10-29029 October 1986 Partially Deleted Encl from SECY-86-322 Discussing Declining Performance Trends,Plant SALP for Apr 1985 - Jan 1986 & Enforcement Conference W/Util.Util Seems Responsive Toward Improved Performance IA-85-771, Package of Reactor Operator & Senior Reactor Operator Exam Questions & Answer Keys for Personnel at Facilities1986-01-0303 January 1986 Package of Reactor Operator & Senior Reactor Operator Exam Questions & Answer Keys for Personnel at Facilities ML20137Q6671986-01-0303 January 1986 Package of Reactor Operator & Senior Reactor Operator Exam Questions & Answer Keys for Personnel at Facilities ML20154B8891985-10-0101 October 1985 Slide Presentation Entitled, Performance of L Grade Stainless Steel Recirculation Outlet Safe Ends at Peach Bottom-3. List of Attendees Encl ML20129F4831985-05-0909 May 1985 Package of Compilations of Results of Operator Licensing & Requalification Exams 1999-07-22
[Table view] Category:PACKAGE OF NONCODED MATERIAL
MONTHYEARML20210A4951999-07-22022 July 1999 Package Consisting of Questions & Comments Re PBAPS Submittal,Dtd 980813,in Support of Discussion on Listed Items ML20058P0931993-09-17017 September 1993 Package Containing Attachment to Employee Concerns Programs ML20247H9431989-07-25025 July 1989 Summary of ASME Repairs & Replacement Completed (N1S-2) for Peach Bottom Atomic Power Station Unit 2,870401-890426 ML20237D7901987-12-10010 December 1987 Package of Unrelated Documentation Re Listed Plants Concerning NRC Emergency Response Data Sys IA-87-209, Package of Undated Documents Re NRC Briefing of Commission Concerning Shutdown of Plant1987-07-23023 July 1987 Package of Undated Documents Re NRC Briefing of Commission Concerning Shutdown of Plant ML20235Y5381987-07-23023 July 1987 Package of Undated Documents Re NRC Briefing of Commission Concerning Shutdown of Plant ML20151M9601987-07-20020 July 1987 Package of NRC Administered Requalification Exam Results Summary ML20235N6621987-07-15015 July 1987 Package of Partially Withheld Investigation Status Records, Draft Synopsis,Handwritten Notes & Util Personnel Policy Re Case 1-85-019 Concerning Alleged Threats to Employees to Prevent Disclosure of Possible Overexposure to NRC ML20235A1861987-07-0101 July 1987 Partially Withheld Package Consisting of Radiation Work Permit 3-1-003,discrepancy Rept,Radiation Contamination - Airborne Survey & Radiation Work Permit Access & Exposure Control IA-87-185, Partially Deleted Encl from SECY-86-322 Discussing Declining Performance Trends,Plant SALP for Apr 1985 - Jan 1986 & Enforcement Conference W/Util.Util Seems Responsive Toward Improved Performance1986-10-29029 October 1986 Partially Deleted Encl from SECY-86-322 Discussing Declining Performance Trends,Plant SALP for Apr 1985 - Jan 1986 & Enforcement Conference W/Util.Util Seems Responsive Toward Improved Performance ML20216F4841986-10-29029 October 1986 Partially Deleted Encl from SECY-86-322 Discussing Declining Performance Trends,Plant SALP for Apr 1985 - Jan 1986 & Enforcement Conference W/Util.Util Seems Responsive Toward Improved Performance ML20137Q6671986-01-0303 January 1986 Package of Reactor Operator & Senior Reactor Operator Exam Questions & Answer Keys for Personnel at Facilities IA-85-771, Package of Reactor Operator & Senior Reactor Operator Exam Questions & Answer Keys for Personnel at Facilities1986-01-0303 January 1986 Package of Reactor Operator & Senior Reactor Operator Exam Questions & Answer Keys for Personnel at Facilities ML20129F4831985-05-0909 May 1985 Package of Compilations of Results of Operator Licensing & Requalification Exams 1999-07-22
[Table view] |
Text
r
. 0 0-d Peach Bottom Units 2 and 3 In early 1986 the NRC staff conducted a Systematic Assessment of Licensee Perforinance (SALP) for the Peach Bottom Units 2 and 3 for the ten month period from' April 1,1985 through January 31, 1986. The SALP report noted declining performance trends in plant operations, maintenance and licensing activities and continued poor performance in the security area. Subsequent to the SALP evaluation ~ period, on March 18, 1986, an incident occurred at Unit 3 in which the control room operators withdrew a control rod out of sequence, thereby violating the plant Technical Specifications. In investigating this incident the NPC staff concluded that, "These personnel errors by four licensed individuals indicate that a problem of inattention to detail, failure to adhere to procedural requirements, and a generally complacent attitude of staff toward performance of their duties continues to exist at Peach Bottom."
The NRC staff held an enforcement conference and a SALP meeting with Philadelphia Electric Company (PECO) to discuss the problems with the opera-tions at-Peach Bottom. On August 1, 1986, the E.xecutive Director for Operations met with the Chairman of the Board, the President and other senior
_PECO executives to stress the NRC's concern about the apparent management j deficiencies at the Peach Bottom site. ;
i PECO management has been responsive to NRC concerns.and has implemented'a l performance enhancement program to improve operational performance at the site. ;
Although recent NRC inspections have noted some improvements in performance, it is too early to tell whether these PECO actions will be fully effective in !
improving the management deficiencies that have been observed at Peach Bottom in recent years.
The NRC Region I staff is augmenting the irispection coverage at Peach Pottom, will add a third resident inspector at the site, and will hold periodic manage-ment review meetings with PECO to continue to monitor the performance enhance-ment program. Both Peach Bottom Units are currently in operation.
t i
8706300874 B70401 PDR FOIA MORIARTB7-185 PDR Information iR this record was deleled in accordance with the Freedom of infcrmation Act, exemptions I FolA P7-/ W I /.1