7590-01-P UNITED STATES NUCLEAR REGULATORY COMMIS3 ION ENVIRONMENTAL ASSESSMENT AND FINDING OF NO SIGNIFICANT IMPACT PACIFIC GAS AND ELECTRIC COMPANY j
HUMBOLDT BAY POWER PLANT, UNIT NO.3 f
l DOCKET NO. 50-133 The U.S. Nuclear Regulatory Commission (NRC)is considering issuance of a license amendment to Facility License No. DPR-7, issued to Pacific Gas and Electric Company (PG&E or the licensee), for the Humboldt Bay Power Plant, Unit No. 3, a permanently shut down plant, located near Eureka. California.
Identification of the Proposed Action:
The proposed action would revise the Technical Specifications to incorporate the l
4 l
requirements of Appendix 1 to 10 CFR Part 50, into the Radiological Effluents Technical l
l Specification (RETS) and to relocate the controls and limitations on RETS and radiological environmental monitoring (currently in the Technical Specifications) to the Offsite Dose Calculation Manual and the Process Control Program. The pri.
'd action would also revise the Technical Specifications to implement Generic Letter 89-01 (GL 89-01) and to incorporate the requirements of the revised 10 CFR Part 20.
The Need for the Proposed Action:
On July 29,1996, the NRC published a Federal Register notice containing decommissioning regulation amendments that became effective August 28,1996.
Contained within these amendments were revisions to 10 CFR 50.36a and 10 CFR 50, Appendix 1, making the Appendix l requirements applicable to decommissioning activities as well as operating nuclear power reactors.
9904170000 980408 PDR ADOCK 05000133 p
i l
2 I
l
}
Alternative 'o the Proposed Action-I There is no alternative to this proposed action. PG&E, the Humboldt Bay licensee I
must comply with the recently revised NRC decommissioning regulations which require the 1
)
technical specification changes antained in the proposed license amendment.
EnvironmentalImpacts of the Proposed Action Although the proposed limits on radiological effluents are much more stringent that the limits in the current technical specifications, the previous radiological effluents from Humboldt Bay decommissioning were so low that they would have been in compliance with the proposed new limits. Thus, the proposed action does not involve any measurable environmental impacts, since neither the facility configuration nor SAFSTOR i
decommissioning mode will change. The staff has also determined that the proposed action will not have any significant radiologicalimpacts on air, water, land, or biota in the area or any other significant environmental impact.
With regard to potential non-radiological impacts, the proposed action does not affect non-radiological plant effluents and has no other environmental impact. Therefore, the Commission concludes that there are no significant non-radiological environmental impacts associated with the proposed action.
Finding of No Significant impact The Commission has determined not to prepare an environmentalimpact statement for the proposed action based on the foregoing environmental assessment. The Commission concludes that the proposed action will not have a significant impact on the quality of the human environment for the reason given above.
t i
j
(
. i;p.. g I
l 3
For detailed information with respect to thi. proposed action, see the application fcr a license amendment dated December 9,1996 as supplemented on June 12,1997 and March 13,1998. These documentr, are available for public inspection at the Commission's Public Document Room,2120 L Street, NW, Washington, DC 20037.
Dated at Rockville, Maryland, this 31st day of March 1998.
FOR THE NUCLEAR REGULATORY COMMISSION hh bN Marvin M. Mendonca, Acting Director.