ML20216D993

From kanterella
Jump to navigation Jump to search
Forwards Impep Review of Nd Agreement State Program.Based on Results,Follow Up Impep Review Focusing on Common Performance Indicator,Status Matls Insp Program Will Be Completed in One Yr & Next Full Review in Approx Four Yrs
ML20216D993
Person / Time
Issue date: 07/13/1999
From: Miraglia F
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To: Sagsveen M
NORTH DAKOTA, STATE OF
Shared Package
ML20216D999 List:
References
NUDOCS 9908020016
Download: ML20216D993 (2)


Text

E o. o Mr. Murrcy G. Sagsveen x . State Health Officer July 13, 1999 North Dakota Department of H;alth Capitol Building 600 East Boulevard Bismarck, ND 58505-0200

Dear Mr. Sagsveen:

On June 30,1999, the Management Review Board (MRB) met to consider the proposed final integrated Materials Performance Evaluation Program (IMPEP) report on the North Dakota Agreement State Program. The MRB found the North Dakota program adequate to protect public health and safety and compatible with NRC's program.

Section 5.0, page 13, of the enclosed final report presents the IMPEP team's recommendations.

We received your June 7,1999 letter which described your actions taken in response to the recommendations in the draft report. We request no additional information.

Based on the results of the current IMPEP review, a follow-up IMPEP review focusing on the common performance indicator, Status of Materials inspection Program, will be completed in one year and the next full review will be in approximately 4 years.

I appreciate the courtesy and cooperation extended to the IMPEP team during the review and your support of the Radiation Control Program. I look forward to our agencies continuing to work cooperatively in the future.

' * ' Original signed by Frank J. MIr$il a,#J r."""

  • Deputy Executive Director for Regulatory Programs

Enclosure:

As stated cc: Dana K. Mount, Director bec: Chairman Dicus Division of Environmental Engineering Commissioner Diaz Commissioner McGaffigan Roland G. Fletcher, Organization of Commissioner Merrifield Agreement States Liaison to the MRB Distribution:

DIR RF MShaffer, RIV DCD (SP01) PDR (YES)

- SDroggitis, OSP - TTaylor, NMSS KSchneider, OSP JPeterson, SC CPaperiello, NMSS LRak: van, OSP DChamberlain, RIV KCyr, 0GC JMyers, ASPO CHackney, RIV DCool, NMSS GKim, OGC GDeegan, NMSS LMcLean, RIV STreby, OGC - FCombs, OSP \

North Dakota File TCombs, OCA (2 copies)

DOCUMENT NAME: G:UMPEPt99FINLTR.ND; G:VM PEPiNDIMP99. FIN 77 rece6ve a cop r of this document,3rdcate in the box: "C" =_ Copy vethojA ettachment/ enclosure T = Copy vdh attachment / enclosure "N"a No copy l OFFICE OSP/RSAOft l C)SA$4)(l DEDRm4 l lNAME JLynch:kk Te PHLohaupi ') FJMiraglia ccr lDATE 07/5 /99 07/(/99 07//g/99 '

nnnn6n ,,

' OSP FILE CODE: SP-AG-22 9908020016 990713 f, y DR Yi$ SLb $$ &$

e a.

pa nerug g i UNITED STATES s* j NUCLEAR REGULATORY COMMISSION -

  1. WASHINGTON, D.C. 2006H1001

%, * * * *

  • p$ July 13, 1999 i

Mr. Murray G. Sagsveen )

State Health Of5cer North Dakota Department of Health Capitol Building 600 East Boulevard Bismarck, ND 58505-0200

\

Dear Mr. Sagsveen:

On June 30,1999, the Management Review Board (MRB) met to consider the proposed final j integrated Materials Performance Evaluation Program (IMPEP) report on the North Dakota  !

Agreement State Program. The MRB found the North Dakota program adequate to protect l public health and safety and compatibie with NRC's program. l I

Section 5.0, page 13, of the enclosed final report presents the IMPEP team's recommendations.

l We received your June 7,1999 letter which described your actions taken in response to the recommendations in the draft report. We request no additional information.  !

l Based on the results of the current IMPEP review, a follow-up IMPEP review focusing on the  ;

common performance indicator, Status of Materials Inspection Program, will be completed in I one year and the next full review will be in approximately 4 years.

l l appreciate the courtesy and cooperation extended to the IMPEP team during the review and 1 your support of the Radiation Control Program. I look forward to our agencies continuing to work cooperatively in the future.

Sincerely, .

n Frank J. glia, .

Deputy Executive Director for Regulatory Programs

Enclosure:

As stated cc: Dana K. Mount, Director

- Divisicin of Environmental Engineering Roland G. Fletcher, Organization of Agreement States Liaison to the MRB