ML20216C854

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-482/97-12 on 970811-15.No Violations Noted
ML20216C854
Person / Time
Site: Wolf Creek 
Issue date: 09/04/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Maynard O
WOLF CREEK NUCLEAR OPERATING CORP.
Shared Package
ML20216C858 List:
References
50-482-97-12, NUDOCS 9709090152
Download: ML20216C854 (5)


See also: IR 05000482/1997012

Text

- __ - _ _ - _ - - -- - -

.

/g*"%<,it

O

UNITED ST ATES

NUCLEAR REGULATORY COMMISSION

.

$

REGloN IV

%f

4

611 RYAN PLAZA oRIVE, SulTE 400

%,, ..."#

/

AR LINO ton, T E X AS 76011 8064

N

.+

!

September 4,1997

Otto L Maynard, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, Kansas 66839

SUBJECT: NRC INSPECTION REPORT 50 482/97 12

Dear Mr. Maynard:

An NRC inspection was conducted August 11-15,1997, at your Wolf Creek Generating

Station reactor facility. The enclosed report presents the scope and results of that

inspection.

The purpose of this inspection was primarily to evaluate the effectiveness of the licensed

operator requalification program. It also involved limited observations of control room

performance. Overall, the licensed operator requalification training program effectively

implemented a systems approach to training and maintained the condition of operators'

licenses. However, a number of simulator scenarios in the requalification scenario bank,

while acceptable overall, had limited discriminating value for the senior operator position,

in accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room (PDR),

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

.

a

j

-

Arthur T. Howell 11, Director

Division of Reactor Safety

J

Docket No.: 50-482

License No.: NPF-42

Enclosure:

NRC Inspection Report

50-482/97 12

mangI , \\\\0%

en~

9709090152 970904

llHhllEH, d.

i * -

PDR

ADOCK 05000402

- *

G

PDR

.

.

.

Wolf Creek Nuclear Operating Corporation

2-

cc w/ enclosure:

Chief Operating Officer

Wolf Creek Nuclear Operating Corp.

P.O. Box 411

Burlington, Kansas 66839

Jay Silberg, Esq.

Shaw, Pittman, Potts & Trowbridge

,

2300 N Street, NW

Washington, D.C. 20037

Supervisor Licensing

,

Wolf Creek Nuclear Operating Corp.

P.O. Box 411

Burlington, Kansas 66839

Chief Engineer

'

Utilities Division

Kansas Corporation Commission

1500 SW Arrowhead Rd.

Topeka, Kansas 66604 4027

Office of the Governor

State of Kansas

Topeka, Kansas 66612

Attorney General

Judicial Center

301 S.W.10th

2nd Floor

Topeka, Kansas 66612-1597

County Clerk

Coffey County Courthouse

Burlington, Kansas 66839 1798

Vick L. Cooper, Chief

Radiation Control Program

Kansas Department of Health

and Environment

Bureau of Air and Radiation

Forbes Field Building 283,

Topeka, Kansas 66620

.

.

.

.;

3

4

'

i

Wolf Creek Nuclear Operating Corporation

3-

Mr. Frank Moussa

- Division of Emergency Preparedness

2800 SW Topeka Blvd

Topeka, Kansas 66611-1287

l

l

l

l

I

I

I

..-

.

Wolf Creek Nuclear Operating Corporation

-4

E Mail report to T. Frye (TJF)

. E-mail report to T. Hiltz (TGH)

,

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (lE01)(IE45)--

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

SRI (Callaway, RIV)

Branch Chief (DRP/B)

DRS-PSB

Project Engineer (DRP/B)

MIS System

Branch Chief (DRP/TSS)

RIV File

-. Bob Gallo (DRCH/HOLB)-

Laura Hurley, RIV

To receive copy of document, Indicato in box: "C" a Copy vnthout enclosures "E" = Copy with enclosures "ff = No copy

RIV;RE:OB

E

RE:OB

E

RE:Ogs,,-

E

BC:OBj

E

D:DRP

/4 D:DF(/

E

T @ OfvS,_

fl @ TZ

J)tgKERNON gjEQTeL

TPGwyn v7 AHO@)LL

08/xt97 /'

'08/p97

/OB/M97-

087[797

08/J97

@ @7

OFFICIAL RECO 3D COPY

'

_

_=

- _

. _ ___

_ _ _ _ _

_. ..

.

..

.

.

.

.

..

..

..

? .

.. g

.

Wolf Creek Nuclear Operating Corporation

-4-

E Mail report to T. Frye (TJF)

E-mail report to.T. Hiltz (TGH)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE01)(I

)

,

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

SRI (Callaway, RIV)

Branch Chief (DRP/B)

DRS-PSB

Project Engineer (DRP/B)

MIS System .

Branch Chief (DRP/TSS)

RIV File

Bob Gcilo (DRCH/HOLB)

Laura Hurley, RIV

..

To receive copy of document, indcato in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" a No copy

RIV,:RE:OB

E

RE:OB

E

RE:O g .,.,

E

BC:OBj

E

D:DRP

A. D:DF@/

E

T@O)A/S,

RLA4(TZ

TMcRERNON pj544TrL

TPGwyn TY A_HO%)LL

08/M97 j'

'08/4/97-

LOB /A/97

08//797

08/ 397

gly b97

t

OFFICIAL RECORD COPY

'