ML20216C353

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-483/97-13 on 970811-15.No Violations Noted.Insp Included Implementation of Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise. Two Exercise Weaknesses Identified
ML20216C353
Person / Time
Site: Callaway Ameren icon.png
Issue date: 09/04/1997
From: Howell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Randolph G
UNION ELECTRIC CO.
Shared Package
ML20216C355 List:
References
50-483-97-13, NUDOCS 9709090035
Download: ML20216C353 (5)


See also: IR 05000483/1997013

Text

1

e" " G%

UM T E o ST AT E S

p

,

"

[

, ' + ,

NUCLEAR REGULATORY COMMISSION

/'.

REGloN iv

611 RY AN PL AZA oRIVF SulT E 400

'8

,/

A R LINGTON, T E X AS 76011 8064

0 ....+

September 4,

1997

i

Garry L. Randolph, Vice President and

Chief Nuclear Offi::er

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

1

SUBJECT: NRC INSPECTION REPORT 50-483/97 13

Dear Mr. Randolph:

An NRC inspection was conducted August 11-15, 1997, at your Callaway Plant reactor

f acility. The enclosed report presents the scope and results of that inspection.

The inspection included implementation of your emergency plan and procedures during

your biennial emergency preparedness exercise. Overall, the performance during the

exercise was satisfactory; however, two exercise weaknesses were identified. The

exercise weaknesses pertained to programmatic problems that resulted in untimely offsite

agency notifications and ineffective technical support center access controls. The exercise

weaknesses are discussed in Sections P4.2 and P4.3, respectively, of the enclosed

inspection report.

Exercise weaknesses, according to 10 CFR Part 50, Appendix E.IV.F.2.g, are inspection

findings that need to be enrrected by the licensee. Therefore, you are requested to provide

this office with a description of your corrective measures and your schedule for completing

these actions within 30 days after receipt of this letter,

fU

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

/,

and its enclosure will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

Sincerely,

e~

.I

c

Arthur T. How 11111,- Director

Division of Reactor Safety

Docket No.: 50-483

License No.: NPF 30

9709090035 970904

-

PDR

ADOCK 05000483

G

PDR

-__--_ _ _ _ _ - _

_

..

..

..

.

.

Union Electric Company

2-

Enclosure:

NRC Inspection Report

_

50 483/97 13

cc w/ enclosure:

Professional Nuclear Consulting Inc.

19041 Raines Drive

Derwood, Maryland 20855

Gerald Charnoff, Esq.

Thomas A. Baxter, Esq.

Shaw. Pittman, Potts & Trowbridge

2300 N. Street, N.W.

Washington, D.C. 20037

H. D. Bono, Supervising Engineer

Site Licensing

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

Manager - Electric Department

Missouri Public Service Commission

301 W. High

P.O. Box 360

Jefferson City, Missouri 65102

Ronald A. Kucera, Deputy Director

Department of Natural Resources

P.O. Box 176

Jefferson City, Missouri 65102

Otto L. Maynard, President and

Chief Executive Officer

Wolf Creek Nuclear Operating Corporation

P.O. Box 411

Burlington, Kansas 66839

Dan 1. Bolef, President

Kay Drey, Representative

Board of Directors Coalition

. for the Environment

6267 Delmar Boulevard

University City, Missouri 63130

4

,

Union Electric Company

-3

Lee Fritz, Presiding Commissioner

Callaway County Court House

l

10 East Fifth Street

Fulton, Missouri 65151

l

Alan C. Passwater, Manager

I

Licensing and Fuels

Union Electric Cornpany

,

P.O. Box 66149

i

St. Louis,' Missouri 63166 6149

J. V. Laux, Manager

Quality Assurance

Union Electric Company

P.O. Box 620

Fulton, Missouri 65251

__ ____ ______ ____

_ _ _ _

.

.

Union Electric Company

4

E-Mail report to T. Frye (TJF)

E Mail report to T. Hiltz (TGH)

E Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK)

l

bec to DCD (lE35)

l

l-

bec distrib. by RIV:

l

I

Regional Administrator

Resident inspector

l

DRP Director

DRS-PSB

Branch Chief (DRP/B)

MIS System

Project Engineer (DRP/B)

RIV File

Branch Chief (DRP/TSS)

DOCUMENT NAME:

To receive copy of documpnt. Indicate in box: "C" a Copy without enclosures *E" = Copy with enclosures "N" = No copy

RIV:SEPA:PSB

b

RS:PSB

RS:PSB

RS:NMLB

C:PSB

GMGood/Imb($/

THAndrews'

MCHay'

JVEverett *

BMurray {)

08 fps 7

08/21/97

08

08/21/97

08df97

immenumusMmimanmamm

muua/21/97

unummmannump

mmuumm

-

nummmmmmunemusum

--

z

ummum

D:DRP i

-

D:DRS s

TPGwyn'fj

{

ATHo#1 i

08/p97 V

09/ (f3T'

' Concurred by E-Mail

'

OFFIClAL RECORD COPY

.

t

'

o

Union Electric Company

-4-

E Mail report to T. Frye (TJF)

l

E Mail report to T Hiltz (TGH)

E Mail report to NRR Event Tracking System (IPAS)

l

E-Mail report to Document Control Desk (DOCDESK)

bec to DCD (IE35)

bec distrib. by RIV:

Regional Administrator

Resident inspector

DRP Director

DRS PSB

Branch Chief (DRP/B)

MIS System

Project Engineer (DRP/B)-

RIV File

Branch Chief (DRP/TSS)

l

DOCUMENT NAME:

To recolve copy of documpnt, Indicate in box: "C" = Copy wnhout enclosures

E" = Copy wth enclosures "N" = No copy

RIV:SEPA:PSB

b

RS:PSB -

RS:PSB

RS:NMLB

C:PSB

GMGood/imb (4/

THAndrews'

MCHay'

JVEverett'

BMurray {}

08/pS7

08/21/97

08/21/97

08/21/97

08$t97

unmausuemOaImam

-

musumusumans ysummmamanum

---

p

mesmaammmmmmanummamma

D:DRP 1

g

D:DRS , f

TPGwyn'Kj

{

ATHoe fi)

08/p97 V

09/ if37'

' Concurred by E Mail

'

OFFICIAL RECORD COl2Y

'O00'20